Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
3 Oct 2026, 4:00 pm6d left
Executive Engineer REW Kargil
Executive Engineer REW Kargil
Construction of Additional Classroom at GHS Sankoo
2026_RDD_19609_1
e-Tender- 24 of REW Kargil UTL of 2026-27
Open Tender
Civil Works - Others
Percentage
Sankoo
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer REW Kargil
₹24,000
24 Sept 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
3 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of Soil | 9.51 | cum | 328.15 | ₹3,120.71 |
| 2 | Ordinary Rock | 2.85 | sqm | 595.29 | ₹1,696.58 |
| 3 | Dry stone pitching including supply of stones and preparing surface complete in foundation including carriage: | 6.72 | sqm | 850 | ₹5,712 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.78 | cum | 7,795.18 | ₹1,38,598.3 |
| 5 | Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:6 (1 cement : 6coarse sand), cost of required centering, shuttering complete : | 14.94 | cum | 15,000 | ₹2,24,100 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) excluding carriage from source to site complete job | 16.63 | cum | 13,100 | ₹2,17,853 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,746.15 | kg | 129.01 | ₹2,25,270.81 |
| 8 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).
Second class Kail wood: | 0.61 | cum | 1,20,151 | ₹73,292.11 |
| 9 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall bepaid separately) | 5.74 | sqm | 3,573 | ₹20,509.02 |
| 10 | 20 mm cement plaster on rough side of single or half brick wall of mix:
1:4 (1 cement: 4 fine sand) | 198.53 | sqm | 424.32 | ₹84,240.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_46379.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .