Tender ID
Tender Value
₹89.2 L
EMD Value
₹89,300
Closing Date
9 Mar 2026, 6:00 pmClosed
Executive Engineer, Saurashtra Branch Canal Division No.6/1,Morbi
Maintenance & Repair of Morbi Branch Canal between Chainage 43.960 km to 85.310 km for F. Y. 2026-27
277338
Tender Notice No. 07 of 2025-26
Open
Civil Works - Canal
Works
Morbi
7 documents required · 7 mandatory
₹2,832
Yes
Executive Engineer SBC Dn No. 6/1, Morbi
₹89,300
Yes
16 Feb 2026
16 Feb 2026
16 Feb 2026
9 Mar 2026
16 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed work.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 KW with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Work: - Maintenance & Repair of Morbi Branch Canal between
chainage 43.960 km to 85.310 km for F. Y. 2026-27
Description of Item Qty. Unit Rate in Rs. Amount in Rs.
Earthwork / Back filling with selected earth
brought from outside borrow area or from
1 excavated useful material incl. watering 2160.00
ramming, Compaction with pneumatic
temping and all lead and lift etc complete.
Dismantling the C.C. lining including
2 including disposing off the dismantled 4032.42
materials as directed etc. complete.
Providing and laying in position Controlled
Plain/Reinforced Cement Concrete Lining of
M-15 grade in Bed, Side Slopes and
curvature including batching, mixing,
transporting, placing, vibrating, smooth
finishing, membrane curing (by curing
compound only) & providing bitumen joints
at specified interval including minor Sqmt.
filling/depression with murrum / earth / soil
as per site condition to correct profile,
watering, compaction, trimming, etc to
provide lining.
For 10 cms thick cast-in-citu canal lining in
M-15 grade of conc. with Cement level-300
kg & MSA-20 mm (Without Using Paver
Machineries & without sleepers)
Providing and laying in position Controlled
Plain/Reinforced Cement Concrete Lining of
M-15 grade in Bed, Side Slopes and
curvature including batching, mixing,
transporting, placing, vibrating, smooth
finishing, membrane curing (by curing
compound only) & providing bitumen joints
at specified interval including minor
filling/depression with murrum / earth / soil
as per site condition to correct profile,
watering, compaction, trimming, etc to
provide lining.
For 12.5 cms thick cast-in-citu canal lining in
M-15 grade of conc. with Cement level-300
kg & MSA-20 mm (Without Using Paver
Machinaries & without sleepers)
Providing, cutting, bending, binding and
fixing in position as per drawing. TMT BAR,
Fe-415 reinforcement for R.C.C. works and MT
anchor bars incl cost of black annealed 16 to
18 BWG M.S. Wire etc. complete with all
Description of Item Qty. Unit Rate in Rs. Amount in Rs.
Clearing the silt from canal /drain bed by
digging the same to the required bed level
and gradient including depositing the
6 excavated earth regularly on spoil bank for
utilizing the same for preparing the bund
after breaking the clods as and where directed
for lead up to 30 mt and lift as under (B)
Depth 3.0 to 6.0 mt
Dewatering for earthen dam and allied works,
foundation areas, pits, trenches etc incl cost 3338.19 Hp- 27.00
of pumping machineries, pipe lines, labours hrs
diesel/electricity/DG set, etc complete.
Desilting of various structures of canal and
distribution system including depositing the
8 same as directed with all lift and lead for 9013.12 Cum.
canal syphon, air vent, Turn Out Kundies etc
I/We am/are willing to carry out the work at… ..................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (ForaboveINR50Cr.):
Item Description of Quantity Unit Rate Amount
No Item(with brief
specification and In In
reference to book of figures Words
specifications)
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure) ……………………………
(C)Net Tendered Amount (A-B) (in figure) …………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
as per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer,
Quality Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is
a change as per Actual mix Design the cost of difference of cement consumption have
been deducted from the rate of original item at the rate of input rate (i.e. 5448.53 Rs /
MT for OPC) mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
61ATENDER NOTICE-ADVT-ok - Copy.pdf
boq 61a.pdf
Branch Final DTP (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .