Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
8 Sept 2026, 5:00 pm
Chief Officer, Notified Area Authority, Sarigam
Strengthening of Flexible Road work at N.A., GIDC, Sarigam.
339966
E-TENDER NOTICE NO. 01 OF 2026-27 Sr. No. 4
Open
Civil - All
Works
Valsad
3 documents required · 3 mandatory
₹7,080
Chief Officer, NOTIFIED AREA AUTHORITY SARIGAM
₹3.8 L
29 Aug 2026
29 Aug 2026
29 Aug 2026
8 Sept 2026
29 Aug 2026
Name of work: - Strengthening of Flexible Road work at N.A., GIDC,Sarigam.
Item Qty. Rate Unit Amount in Rs.
1 Box cutting the road surface to proper slope & 4349.56 104.04 Cu.mt
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope or as directed by engineer in charge
within the estate. Incl bitumen road with all layers.
2 Providing & laying of granular sub-base by providing 2850.00 1750.74 Cu.mt
& laying of compacted thickness of 200 mm Grading
5th Granular sub base (GSB) in layers of graded
granular material consisting of machine cut black
trap stone aggregate as per grading - V given in table
400-1 of the specification MORT&H and compactor
to the required density with vibratory roller in all
seasons as per MORT&H , maintaining the required
slope & grade during the operation as approved by
the engineer in charge & watering to the proper
moisture content and sprinkled with the help of
truck mounted water tank fitted with suitable
arrangement. (fully saturated having CBR value
3 Providing, laying, spreading and compacting graded 3550.00 2076.00 Cu.mt
stone aggregate to wet mix macadam specification
including premixing the materials with water at
OMC in mechanical mix plant carriage of mixed
materials by tipper to site, laying in uniform layers
(Layer should not be more than 200 mm)with paver
in sub base/base course on well prepared surface
and camber with Sensor paver consolidation by
vibratory road roller to achieve the desired density
by using machine crushed chips as per required
gradation mixing with required optimum quantity of
water incl material, labour, plant and machinary and
equipment etc. complete by plant mix method.
(Using mechanical paver ).
4 'Providing and applying primer coat with bitumen 14200.00 63.13 Sq. Mt
emulsion RS1 on prepared surface of granular Base
including clearing of road surface and spraying
primer at the rate of 0.70 kg/sqm using mechanical
Signature of Contractor Chief Officer
NA,GIDC, SARIGAM
5 Providing & laying compacted 70 mm thick dense 2295.00 5907.70 MT
graded bituminous macadam (DBM) Grade-II in
Single layer using 100-120 TPH batch type HMP with
tack coat at the rate of 2.5 kg / 10 m2 (VG10) in each
using crushed aggregates of specified grading
premixed with bituminous binder @ 4.5% ( VG - 40)
bitumen by weight of total mix and filler
transporting the hot mix to work site laying with a
hydrostatic paver finisher with sensor control with
full road carpet width (Single screed) or as directed
by Engineer in charge to the required grade, level
and alignment, rolling with smooth wheeled roller,
intermediate rolling 8-10 tonnes dead weight or
vibratory roller & pneumatic tire roller of 12 to
tonnes weight having sufficient width and pressure
& the finishing rolling shall be done with 6 to
tonnes smooth wheeled tendem rollers to acheive
the desired compaction as per MORT&H
specification etc complete in all respects. The agency
shall have to get the mix design done from approved
laboratory and submit to the Engineer in charge for
approval.(Va = 3.5% & Vbe= 11.50% must be
considered in mix design ) If the asphalt
(bituminous) content is more than above, the agency
shall have to bear the cost of additional asphalt. The
payment shall be done on the permissible field
density achieved on the site instead of density
derieved in the mix design. ( The density obtained by
mix design above 2.31 MT/M3 shall be boarn by
6 Providing and laying compacted 40 mm thick 1340.00 6938.44 MT
Bituminous Concrete ( BC ) Grade -II in single layer
using 100-120 TPH batch type hot mix plant and
using emulsion asphalt as a tack coat @ 2.5 kg /
sq.mt (VG 10) in each using crushed stone aggregate
of specified gradation and filler, Premix with VG-40
grade bituminous binder at 5.40 % by total weight
of mix & filler incl. transporting the hot mix to work
site and laying with hydrostatic paver finisher
having sensor control with Full road carpet width (
Single screed) or as directed by Engineer in charge
to the required grade, level and alignment, rolling
with smooth wheeled roller, intermediate rolling 8-
10 tonnes dead weight or vibratory roller &
pneumatic tire roller of 12 to 15 tonnes weight
having sufficient width and pressure & the finishing
rolling shall be done with 6 to 8 tonnes smooth
wheeled tendem rollers to acheive the desired
compaction as per MORT&H specification etc
complete in all respects. The agency shall have to get
the mix design done from approved laboratory and
Signature of Contractor Chief Officer
NA,GIDC, SARIGAM
submit to the Engineer in charge for approval (Va =
3.5% & Vbe= 11.50% must be considered in mix
design ). If the asphalt (bituminous) content is more
than above, the agency shall have to bear the cost of
additional asphalt. The payment shall be done on the
permissible field density achieved on the site instead
of density derieved in the mix design. ( The density
obtained by mix design above 2.36 MT/M3 shall be
boarn by agency)
7 Providing and applying asphalt painting with 14180.00 65.92 Sq.Mt
bitumen of VG 40 grade on bituminous surface
including clearing of road surface and spraying
Bitumen at the rate of 0.60 kg / sqm using
mechanical means.
8 Road Marking with Hot Applied Thermoplastic 880.00 217.40 Sq. Mt
compound with Reflectorizing Glass Bends on
Bituminous surface. P/L of Hot Applied
thermoplastic compound 2.5 mm th including
reflectorizing glass beads @ 250 gms per Sqm area
thickness of 2.5 mm is exclusive of surface applied
glass beads as per IRC : 35. The finished surface to be
level uniform and free streaks and holes.
I / We agree to carry out the above work at ____________ % above the estimated rate ((In
Words) _________________________________________________) percentage above the Estimated Tender
I / We agree to carry out the above work at ____________ % below the estimated rate ((In
Words) _________________________________________________) percentage below the Estimated Tender
Estimated Amount Estimated Amount
Put to Tender Rs. 3, 76,90,122.00 Put to Tender Rs.
Add % Above Rs.__________ Deduct % Below Rs. ____________
Net Amount Rs.__________ Net Amount Rs._____________
Net In Figure Rs.__________ Net in Figure Rs. ______________
I / We have read the Condition mentioned in this tender and agree to abide by the same.
Signature of Contractor Chief Officer
NA,GIDC, SARIGAM
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Srenthe Road work.pdf
B1 Agreement Part 1.pdf
B1 Agreement Part 2.pdf
SCHEDULE B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].