| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹16.3 L+₹1.9 L (13.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹17.3 L+₹2.9 L (20.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹18.4 L+₹4.0 L (28.0%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.K.SURENDRAN L1 | K.M.Joy L3 | K M BIJU L4 | KK CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling CC/RCC works including separately removing & stacking available reinforcement & clearing away the debris as per directions within a distance of 150 m. | 10 | M3 | 2,650 ₹26,500 Lowest | 6,000 ₹60,000 | 3,000 ₹30,000 | 2,800 ₹28,000 |
| 2.00 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out & removal of debris if any within a lead of 150 m. | 4.3 | TO | 15,000 ₹64,500 | 10,000 ₹43,000 | 15,000 ₹64,500 | 5,000 ₹21,500 Lowest |
| 3.00 | RCC work in 1:1½:3 nominal mix using 20 mm and downgrade hard granite broken stone including all charges for mixing concrete, laying, consolidating, curing etc.complete but excluding cost of form work & reinforcement works- For foundation footings, bottom & sides of trenches, equipment foundations, plinth beams, lintels, slabs, columns & beams etc.up to 5 m from ground level. | 10 | M3 | 10,700 ₹1,07,000 | 12,000 ₹1,20,000 | 10,800 ₹1,08,000 | 9,000 ₹90,000 Lowest |
| 4.00 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete above plinth level.Thermo Mechanically Treated bars of grade Fe-500D or more. | 1,600 | KG | 93 ₹1,48,800 | 120 ₹1,92,000 | 125 ₹2,00,000 | 90 ₹1,44,000 Lowest |
| 5.00 | Providing formwork to RCC works with necessary wooden planks, joists, runners, posts etc.including removal after completion of works- For foundation footings etc. | 100 | M2 | 350 ₹35,000 | 700 ₹70,000 | 550 ₹55,000 | 300 ₹30,000 Lowest |
| 6.00 | Supplying, Conveying, fabrication and erection of structural steel work bolted or welded at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIL / RINL / TISCO /JINDAL make) - Required gas and electrodes will be supplied free of cost by FACT at stores | 4.5 | MT | 1,35,000 ₹6,07,500 | 1,60,000 ₹7,20,000 | 1,40,000 ₹6,30,000 | 1,00,000 ₹4,50,000 Lowest |
| 7.00 | Applying one coat of Epoxy Zinc Phosphate Primer, of approved quality at all heights after thoroughly cleaning to remove grease, oil, rust, dust and any other foreign materials including cost of primer, scaffolding charges, labour charges,cleaning the site and all other incidental charges etc.complete as per departmental instructions at site. | 1,500 | M2 | 72 ₹1,08,000 | 70 ₹1,05,000 Lowest | 78 ₹1,17,000 | 120 ₹1,80,000 |
| 8.00 | Painting with high build Epoxy paint of approved quality and colour two coats at all heights, over the primer already done and paid separately after cleaning the surface including cost of paint, labour charges, scaffolding charges etc.complete. First and second coat shall be distinct colours. | 1,500 | M2 | 135 ₹2,02,500 | 150 ₹2,25,000 | 125 ₹1,87,500 | 120 ₹1,80,000 Lowest |
| 9.00 | Providing JCB Excavator or similar equipment for the removal of earth, waste, debris etc.including equipment hire charges, fuel charges, and operator’s charges etc.complete. | 24 | HR | 1,420 ₹34,080 | 1,500 ₹36,000 | 1,400 ₹33,600 | 1,300 ₹31,200 Lowest |
| 10.00 | Providing labour assistance for emergency works which are not covered in the Schedule of work-Man Mazdoor. | 12 | NO | 1,240 ₹14,880 | 1,500 ₹18,000 | 1,200 ₹14,400 Lowest | 2,000 ₹24,000 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
14 Jul 2025, 11:00 amClosed
AGM(Mat)C
Corporate Materials, PD Administration Building, FACT- Udyogamandal, Kochi, Kerala.
Providing walkway slab inside Sulphur godown at Willindon Isalnd, FACT-CD, as per tender conditions.
2025_FACT_863280_1
04046/2025-2026/E31593
Open Tender
Miscellaneous Works
Item Rate
90 days
Willingdon Island, FACT - Cochin Division
Please refer tender documents.
7 documents required · 7 mandatory
₹0
₹25,000
Yes
26 Aug 2025
23 Jun 2025
15 Jul 2025
23 Jun 2025
14 Jul 2025
23 Jun 2025
Amount
Dismantling CC/RCC works including separately removing & stacking available reinforcement & clearing away the debris as per directions within a distance of 150 m.
Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out & removal of debris if any within a lead of 150 m.
RCC work in 1:1½:3 nominal mix using 20 mm and downgrade hard granite broken stone including all charges for mixing concrete, laying, consolidating, curing etc.complete but excluding cost of form work & reinforcement works- For foundation footings, bottom & sides of trenches, equipment foundations, plinth beams, lintels, slabs, columns & beams etc.up to 5 m from ground level.
Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete above plinth level.Thermo Mechanically Treated bars of grade Fe-500D or more.
Providing formwork to RCC works with necessary wooden planks, joists, runners, posts etc.including removal after completion of works- For foundation footings etc.
Supplying, Conveying, fabrication and erection of structural steel work bolted or welded at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIL / RINL / TISCO /JINDAL make) - Required gas and electrodes will be supplied free of cost by FACT at stores
Applying one coat of Epoxy Zinc Phosphate Primer, of approved quality at all heights after thoroughly cleaning to remove grease, oil, rust, dust and any other foreign materials including cost of primer, scaffolding charges, labour charges,cleaning the site and all other incidental charges etc.complete as per departmental instructions at site.
Painting with high build Epoxy paint of approved quality and colour two coats at all heights, over the primer already done and paid separately after cleaning the surface including cost of paint, labour charges, scaffolding charges etc.complete. First and second coat shall be distinct colours.
Providing JCB Excavator or similar equipment for the removal of earth, waste, debris etc.including equipment hire charges, fuel charges, and operator’s charges etc.complete.
Erection & Installation of precast/prestressed concrete elements in correct and final position with proper line level and plumb at site making all arrangements (ie,cranes,pushpull jacks & all anotherT&P) for lifting placing & alignment of elements within erection tolerance as per IS 15916 as per approved shop drawing and all complete as per dircetion of Engineer-In Charge but excluding the cost of sim pads,non shrink grout and steel works ie,hangers.All work upto fifth floor.(Precast slab up to 200mm thickness)
Collecting mixed materials including spoil earth, Gypsum, Rock & Sulphur waste, broken AC sheet, brick / rubble debris etc.from places pointed out within an initial lead of 50 m and lift up to 1.50 m as per instructions at site.
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material as mentioned in special conditions of work by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 25 km for all lifts, complete as per directions of Engineer-in-charge.
KK CONSTRUCTIONS (BID ID -3248029)
K.M.Joy (BID ID -3247936)
K M BIJU (BID ID -3248008)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .