Tender Value
Refer Docs
EMD Value
₹10 Cr
Closing Date
14 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
The Chief Business Operations Officer
Development of Destination Mall in GIFT City
314002
GIFTCL/BO/RFP/DTA/2026/02
Open
Commercial shop, mall,complex Office
Gandhinagar
2 documents required · 2 mandatory
₹25,000
Gujarat International Finance Tec-city Company Limited
₹10 Cr
15 Jun 2026
15 Jun 2026
15 Jun 2026
13 Jul 2026
15 Jun 2026
These items will be stored in a separate holding area and should be disposed by
informing GIFTCL or the Service Provider who will come at preset times of the
week or on call and collect these bulky waste items. If Disposal of waste will be
carried out by GIFTCL then the separate charges will be levied as per GIFT pol-
Should the developer’s FM team not manage the waste into the garbage chute in
a systematic manner and cause blockage by throwing any of the restricted material
which has been highlighted in section 2.5 of this document the costs associated
with clearing the same will be charged by the service provider / GIFTCL as a
penalty as per the GIFT Solid Waste Management Policy. Any additional cost
www.giftgujarat.in 16 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
towards cutting of pipe to release blockages etc. will be charged as per GIFTCL
Solid Waste Management Policy
2. SOLID WASTE CONNECTION
2.1 SOLID WASTE CONNECTION
The GIFTCL shall be contacted for following application:
a) To obtain a solid waste connection
b) Reconnection
c) Transfer of registered name
www.giftgujarat.in 17 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
For all types of New Connections: Developer/Consumer must have to apply for
their connections exclusively through this online portal (https://utilities.giftguja-
rat.in/) along with terms and conditions form issued by GIFTCL. (Attached as
Annexure I & II)
2.2 LIST OF DOCUMENTS / DRAWINGS SUBMITTED BY DEVEL-
List of documents to be submitted at the subsequent stages for approval but not
limited and may change on case-to-case basis which are as follows:
Location of chute and chute details
Structural Drawings showing beam depths and slab thickness - type of
slab and direction of post tensioning if any.
Architectural layout
Latest MEP coordinated drawings
Garbage Chute drawings and details of control panel wiring diagram from
garbage chute contractor
Specifications of garbage chute relating to size of inlet doors
Complete layout drawings of system, including detail drawings of inlet
hoppers stations
Alignment Plan of AWCS pipeline within the building along with cross
section starting from chute end up to Utility Tunnel with levels
The checklist for all stages, but not limited to following, is as below –
Checklist for Various Stages for Developer
Drawings for Space Arrangements
Basis of Calculations
www.giftgujarat.in 18 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Solid Waste Philosophy
Location of garbage room
Tentative Internal AWCS routing drawing with tun-
nel intersection details
Signed Drawings of Garbage Room Layout
Signed Drawings of Chutes
Signed Drawings of AWCS Pipeline Routing
Signed Drawings of Chutes Specification & details
Solid Waste Philosophy
Design Calculations for per capita solid waste gener-
Submission of DBR
Location of garbage room
Internal AWCS routing drawing with tunnel intersec-
tion details with levels
Drawings Final AWCS routing plan and section
2.3 VALIDATION / SUBMISSION OF DOCUMENTS / DRAWINGS BY
GIFTCL will validate all drawing / documents based upon feasibility or
system requirement / specifications mentioned in Blue Book.
Developer will submit soft and hard copy (3 copies of each), duly stamped
and signed by authorized signatory of the Developer.
GIFTCL will review and wherever required all necessary comments should
be incorporated by Developer.
Developer will only consider the approved documents / drawings by
GIFTCL for further proceedings. Developer will consider the comment
www.giftgujarat.in 19 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
given by GIFTCL and shall resubmit the revised drawing / documents for
approval as mentioned in above point till acceptance of final approval from
3. INSTALLATION REQUIREMNTS
The following system installation works/requirements are to be provided by the
Bends are always of radius 1800 mm along the refuse pipe in the horizon-
tal run from the chute to the plot connection.
Bends connecting the discharge valve or the air valve are 750mm or
1250mm depending upon the location. The bends radius will be suggested
by GIFTCL after studying the location, distance and other parameters re-
lated to the AWCS system.
After a bend connecting the discharge valve there has to be a straight por-
tion of 2500mm before the next bend is proposed
Y pipe can only join the main pipe at an angle of 30 degrees, Y pipes can
only join from the sides or top and never from the bottom.
All pipes can only rise by a maximum of 20 degrees and fall by maximum
20 degrees to the plane. Before and after a rise there shall be a straight
portion of 2500mm.
For towers with basements the pipe will be run in the underside of ground
level slab (high level basement 1).
Floor and wall penetrations for the pipes if required should be done by De-
veloper. Drawings should be provided for Cut-out coordinates at slab level
and sleeve penetration in retaining wall at grade / basement level.
www.giftgujarat.in 20 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Approximately 100 m2 of working area should be provided by Developer for
storage and welding of pipes adjacent to the working area.
Garbage room or where chutes and container chambers are installed, a sepa-
rate enclosed accommodation at ground level in an accessible position
should be provided for the storage of large and bulky articles or salvageable
materials or both, so that disposal arrangement can be made. A minimum
space of 10m2 is recommended.
3.1 DISCHARGE VALVE ROOMS / GARBAGE ROOM– INDOOR TOW-
The following works and requirements are to be provided by the Developer. Refer
drawings in Annexure V which show the options of location of discharge room and
minimum dimension required for the waste room.
Size: minimum area required for garbage room shall be 4m x 3m.
Location: Developer shall provide garbage room at ground floor of every
building/block.
All building and architectural appurtenances, including openings,
make good openings, finishes etc.
Two Gravity chutes with hopper inlet loading doors confirming to BS
1703. (Scope of Waste Chute Supplier). Minimum opening of door
should be 450 (w) x 450 (H), having diameter of chute 500mm.
Room lighting, electricity supply 15A socket, fire protection system,
water supply (bib tap) and drainage point to drain away the water ac-
cumulated in chute due to maintenance. This drainage point can be at
basement level also.
www.giftgujarat.in 21 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Connection of water outlet to the floor drains.
All necessary penetrations in upper slab (refer AV / DV room draw-
Openings in vertical walls to provide for air intake at 5cum / sec. Clear
opening of 0.5 sqm for Discharge valve and 1.0 sqm for air valve.
Slab penetration may be covered by steel grating, supported by steel
framework, in case the primary air intake needs to be fed from lower
AV / DV needs 5cum/sec air intake prior to operation to create air path
in pipe net. This air is to be drawn from lower floor from the car park
or open area. Existing penetration in shear wall in garbage room can
be used to provide air in most cases, certain case may need ducting to
be provided from open area.
Fire Cell Compartmentalisation as per local fire norms to segregate
AV / DV room in Upper and Lower level garbage room.
All acoustic treatment and lining to walls, doors and ceiling where
required. This is to reduce the noise levels likely to be generated dur-
ing operation of the Discharge Valve. Noise level is likely to be in the
range of 60 dB – 80dB during operation for a period of approximately
3 minutes depending upon the load of accumulated garbage in the
Sealing of holes between equipment and structure except the filling of
non-inflammable materials to the slots, holes or space framed by
sleeves for the cable, trunkings, water pipe and the like.
www.giftgujarat.in 22 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
The room where the Discharge valve and / or Air inlet valve is housed
needs to be designed to withstand a negative pressure of 2 KN/m2
All civil requirements like inspection chambers, pits for valves inside the
plot will be provided by Developer as per AWCS installation requirement.
4. DEVELOPER'S INSTALLATIONS
Developer shall consider following guidelines for installation within the building.
4.1 ESTIMATION OF SOLID WASTE GENERATION
Developer will estimate the total solid waste to be generated as per
CPHEEO – solid waste management manual. Also provide the details of
waste hazardous / e-waste if any.
Developer will provide the waste composition to be generated such as per-
centage of paper, plastic, metal, cardboard, metals, glass, organic waste,
inert or any other hazardous waste which is to be disposed.
4.2 GENERAL SYSTEM SPECIFICATION
The general system specification is a guideline for Developer to offer their sys-
tems to be based on similar working and operation and acts as a guideline for the
deliverables as desired by the GIFTCL.
Two SS 304 Vertical chutes of 500mm dia, with minimum 1.5mm thick
will be installed confirming to BS
www.giftgujarat.in 23 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
The waste drops down by gravity through a 500mm vertical chute to a waste
storage section located at Ground Floor where it can be temporarily stored
prior to emptying cycle. Considering that the waste disposal to the chute
shall be performed at the same time intervals in between floors.
Developer should describe in its proposal the security measures and system
to be taken to avoid unwarranted accidents, including the measures to be
taken when the discharge valve at the bottom of the chute is activated.
Developer should also take into consideration self-cleaning methods in the
chutes and pipes including the inlet doors/loading station/garbage room to
avoid blockages and unpleasant odours.
Waste can be disposed into loading doors any time. An interlock control
for the loading doors is to be provided. With this control, loading doors of
the same waste chute are locked by electro-mechanical device when the
discharge valve at the bottom is opened. Upon completion of waste dis-
charge after a few seconds, electro-mechanical locks of all the concerned
loading doors will be released for normal operation.
Installer, or supplier of a service, should have technical qualifications, ex-
perience, and trained personnel and facilities to perform the specified work.
When 2 or more units of the same type or class of materials or equipment
are required, these units are products of 1 manufacturer.
Manufacturers of equipment assemblies, which use components made by
others, assume complete responsibility for the final assembled product.
All components of an assembled unit need not be products of the same
manufacturer, but component parts which are alike are the products of a
single manufacturer.
www.giftgujarat.in 24 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Components are compatible with each other and with the total assembly for
the intended service.
Developer shall check and review dimensions and details of the space of
the space allocated for garbage chutes in early phases of construction.
Provide a qualified representative possessing complete knowledge of sys-
tem and equipment to train the employees in operation and maintenance of
Refuse should be transported in the plastic/waste bags.
System should be automatically operated, and the brush should clean the
entire vertical surface and go back at a speed of 1-2 min per floor or so and
can be done at a specified time every week through a PLC.
Risers: Two garbage chutes of 500 mm diameter, 1.5mm thick constructed
of stainless-steel grade
Provide slip type expansion joints in chute risers between floors, upper
section telescoping into section below.
Support chutes by frames and fasteners at each floor to prevent sound
transmission to the floor slab as recommended by the manufacturer. Weld
and dress smooth connection joints between vertical shafts and horizontal
intakes with no projections that may catch or tear waste.
Chute shall meet the BS 1703 requirements.
The safety vent shall be designed to normally exhaust the chute riser
of odor, keep inclement elements out and (in the event of rapid
www.giftgujarat.in 25 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
combustion or sudden explosion) provide complete relief within the
chute riser, so the intake doors below will not be blown open.
Chute Disinfecting Apparatus
Provide chute disinfecting and sanitizing device. Equip chute at top with
copper flushing rings containing 1.5 mm diameter spray holes, 65 mm on
centers with extra holes which shall completely drain ring when water is
shut off. In lieu of flushing rings, chute may be equipped with spray heads
designed to flush inside of chute.
Developer shall provide all necessary fittings to water supply piping to
connect the disinfecting and sanitizing device to the plumbing system.
Chute Loading Stations / Doors
Inlets station on all floors shall consist of the intake door mounted in a
single face plate. The intake door shall have pivot type side/bottom hinges
and be located as indicated on the drawings.
Intake hopper doors shall be made of SS304 grade, 1.5mm thick, and carry
the UL (1½ hour 121 deg. C (250 deg. F)) "B" label, covering size, design
and construction of the door, frame, latching, and closing mechanism.
Fabricate door of steel sheet and provide self-closing and self-latching
Door size shall be a clear opening 450 mm x 450mm side/bottom hinged.
Doors will be airtight in construction.
Provide a 450 mm x 450 mm access panel with an UL (1½ hour 121 deg.
C (250 deg. F)) "B" label, covering size, design and construction of the
door, frame latching and closing mechanism. Locate at highest floor level
www.giftgujarat.in 26 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
to allow access to maintain the fan and sanitizing pumps.
Surfaces of door and frames to be unmarred by lapped joints, bolted frame,
screws or rivets. Door and frame are mounted into intake throat with sheet
metal screws into anchor plate and straps welded to intake throat making
door and frame readily removable without marring the finished wall.
Door to be equipped with single-motion handle.
Provide intake doors, shroud door(s) and connector door, with electric
interlocking mechanism.
Each intake door shall have a pilot light showing when the door is locked.
Provide switch at the bottom of the chute to lock out all the doors during a
cleaning period or maintenance.
Clearly write on the intake door in letters approximately one inch high, the
word "DRY” and “WET” Waste". Raise or incise letters in door face in
permanent manner. Raised lettering shall be metal or plastic with metal
Maintenance of vertical garbage chutes will be under the scope of the
4.3.1 ACCESSORIES
Provide 19mm IPS flushing spray head and 13 mm sprinkler head above
highest intake. Provide additional 13mm sprinkler heads at every intake
counting from the top.
Provide Disinfecting & Sanitizing unit for installation in line to the flushing
spray head complete with back flow prevention valve and electric control
The disinfecting and sanitizing systems stated shall be provided for both
www.giftgujarat.in 27 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
chutes and waste fraction.
Offsets (bends) in the chute can be provided if required for buildings above
40 floors which have intermediate mechanical levels, shall be made the
same diameter as the chute and have an additional layer of steel reinforcing
the impact area. Offsets are not to deviate more than 15 degree off the
vertical axis of the chute.
Sprinkler System: Chute shall be protected internally by automatic
sprinklers. This requires a sprinkler at or above the top intake door of the
chute, and in addition, a sprinkler shall be installed within the chute at
alternate floor levels in building over two stories in height with mandatory
sprinkler located at the lowest service level.
Developer has to make arrangement in Garbage room as per the
requirement listed in this document such as but not limited to
Compressor, flushing arrangement, dryer, odor control device, etc.
4.3.2 EXECUTION
Factory assembly chute minimum 1.5mm thick with all joints welded and
expansion joints at each floor. Lock-seamed spiral pipe is acceptable.
Bolt intake doors in place on throats formed into chute tubes.
Flash chute sections inside the sections below with no bolts, clips or other
projections inside chute to snag the flow of material.
Preposition support frames to ensure proper intake levels and plumbness.
Reinforce and support separately discharge doors and offsets at impact
www.giftgujarat.in 28 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Chute Loading Stations:
1) Set station flush with adjacent surface.
2) Attach face plate to supports with stainless steel screws.
Hangers: - Conveyance lines and air intake and exhaust ducts: When
proper hanger spacing does not correspond with joist or rib spacing,
structural steel channels may be attached to joists or ribs and tubing
suspended there from. Vertical Runs: Support at each floor line and at the
Protect all finish parts of equipment, such as shafts and bearing where
accessible, from rust prior to operation by means of protective grease
coating and wrapping. Close pipe openings with caps or plugs during
installation. Cover and protect equipment against dirt, water, and chemical
or mechanical injury. Clean the exposed materials and equipment after
completion of all work.
Assemble the chute and chute accessories in place; align and anchor in
accordance with the manufacturer’s instructions.
Run water supplies to the flushing and sprinkler heads.
Erect walls around chute after all other work are completed (by Civil
Contractor). Chute intake door frames shall be set square and flush with the
finish wall line before the walls are erected.
www.giftgujarat.in 29 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Demonstrate entire system will operate as specified. Test all lines in
sequence by the passage of five test runs of material from each station.
Demonstrate operation of station controls by a minimum of five test runs
when dispatch buttons are operated simultaneously at 2 or more separate
Test chute components after installation. Operate doors, locks and interlock
systems to demonstrate that hardware is adjusted, and electrical wiring is
connected correctly.
Test fire sprinklers and heat-and smoke-sensing devices for proper
Operate sanitizing unit through one each complete cycle of chute use and
cleanup and replenish chemicals or cleaning fluids in unit containers.
Complete test operations before installing enclosure.
GIFTCL’s representative shall witness test before acceptance.
After acceptance of testing by GIFTCL and installation of enclosure, the
GIFTCL’s representative shall perform final inspection.
4.3.5 MAINTENANCE SERVICE
Furnish inspection and maintenance service on all equipment for a period of
years after Date of Substantial Completion that the system is to be put into daily
operation. This service shall consist of examination by competent and qualified
mechanics; cleaning, oiling, greasing, adjustments and replacement of any parts
required to place equipment in proper working order, (except parts made
www.giftgujarat.in 30 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
necessary by improper use, accident or negligence). Maintenance to be performed
twice in a month.
The developer and his facilities management personnel are responsible for the
future maintenance of the vertical garbage chutes.
GIFTCL is only responsible for the Operations and Maintenance of the AWCS
system connecting the bottom the garbage chute to the utility tunnel.
4.3.6 DELIVERY, STORAGE AND HANDLING
Protect chutes and accessories to prevent physical damage and deterioration from
other construction and from weather.
Materials used in the construction of the inlet hopper unit shall be, as far as prac-
ticable, non-combustible, when tested in accordance with the requirements of BS
476-4, and resistant to hardware and abuse. The materials shall be SS304 grade
1.5mm thick confirming to BS1703 and other relevant BS standards relevant to
SS304 fabrication.
The welding of stainless steel shall be carried out in accordance with the require-
ments of BS EN 1011-2.
www.giftgujarat.in 31 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
All materials that are not inherently non-corrodible shall be protected from cor-
rosion in accordance with the requirements of a), b) or c).
All support brackets of the vertical garbage chute embedded in the shaft will
be installed with hot dip galvanizing and in accordance with the require-
ments of BS EN ISO
Where no other finish is specified, iron and steel components shall at least be
supplied with a coat of priming paint and epoxy coated, conforming to the re-
quirements of BS
c) Other finishes
Any finish other than those in a) and b) shall be by agreement between the pur-
chaser and the supplier. Any such finish shall, if a relevant British Standard ex-
ists, conform to the requirements of that standard.
4.4.1 DIMENSIONS AND DESIGN
The vertical garbage chute and inlet hopper shall be designed and constructed
such that there can be no emission of dust or fumes, and excessive noise is
www.giftgujarat.in 32 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
prevented when the hopper is in the closed or open position; no part of the hopper
or frame shall obstruct the free passage of waste.
Hopper clearway
The hopper shall be designed and constructed so that there is no obstruction to
the discharge of refuse into the chute and there is no entry to the chute whilst the
hopper is partially open.
The dimensions of the throat of the hopper shall be not less than the dimensions
The largest dimension of the mouth opening, i.e. the diagonal of a rectangular
opening, shall not exceed the diameter of the chute with which the hopper is to
be connected. In no case shall this diagonal be lesser than 430 mm.
4.4.2 FRAME AND HOOD UNIT
The unit shall consist of a frame for fixing into an orifice in the wall of the chute
and a hood as shown in Figure
Thickness of material
The minimum thicknesses of material used in the construction of the frame and
hood shall be as follows:
Stainless steel SS304 1.5mm
www.giftgujarat.in 33 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
All frames, as distinct from hoods, shall be so constructed as to provide a con-
tinuous luting flange for the purpose of dressing in the surrounding wall surfac-
When lugs are used, they shall be securely fixed to the frame unit and shall be
so constructed as to provide an adequate fixing for the frame unit to the sur-
rounding structure.
4.4.3 DOOR AND RECEIVING UNIT
The unit shall comprise a door, a receiving plate and two retaining side cheeks
formed or continuously fixed so as to prevent any seepage. To prevent spillage
from the sides, the cheeks shall be carried up as high as is practicable, without
impeding the operation of the hopper, with a minimum height of 125 mm, meas-
ured radially from the intersection between the door and the receiving plate. The
base of the receiving unit shall project downwards at an angle of not less than 45°
to the horizontal when the door is closed.
Thickness of material
The minimum thicknesses of material used in the construction of the door and
receiving unit shall be as follows:
door, unless reinforced to a comparable
Stainless steel 1.2mm
receiving unit 1.5 mm
www.giftgujarat.in 34 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
A gasket shall be securely fixed to the door or frame to minimize noise and pre-
vent the emission of dust or foul air when the door is closed. It shall be constructed
of rubber or other suitable material and shall form a continuous effective seal. For
the same reason a continuous strip of rubber or other similar material shall be
provided to act as a buffer and seal between the back of the receiving unit and the
hood and fixed so as to render malicious damage or removal difficult. The gaskets
shall be readily replaceable.
Counterbalance of door
The unloaded door, when released from the fully opened position, shall automat-
ically resume the closed position.
Consideration should be taken, at the design stage, of any danger of trapping fin-
gers, hands or arms.
The hinge shall be so constructed that it is protected from clogging by stray refuse
and permits the door to conform to the requirements of BS1703. It shall be se-
curely fixed and shall present no sharp or otherwise dangerous feature to the user
or passer-by. The construction of the hinge shall be such that the hopper door can
be removed from the frame for maintenance purposes. To prevent vandalism and
misuse, the method of removal shall be designed to deter tampering by unauthor-
www.giftgujarat.in 35 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Handle and fastener
A handle or other means of opening shall be securely fixed to or formed as an
integral part of the door. If a fastener is used, it shall be of robust construction and
shall be securely fixed. Neither the handle nor the fastener shall present any sharp
or dangerous feature to the user or passer-by.
4.4.4 INSTALLATION
To accommodate a hopper in the wall of the chute, a precast block of impervious
material, with a recess or other suitable means of bedding the frame squarely shall
be used. Jointing of the blocks with the surrounding brickwork shall be secure.
4.5 MANUFACTURER’S CERTIFICATION
The manufacturer shall be satisfied that the components of the chute conform to
the requirements of this British Standard at the time of dispatch and shall provide
a certificate to this effect, at the request of the purchaser.
Every hopper shall be legibly and indelibly marked with the following:
a) the manufacturer’s name or identification mark;
b)the model number or name;
c) the number of this British Standard, i.e. BS
www.giftgujarat.in 36 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
5 GIFTCL’s INSTALLATION
GIFTCL will install, test and commission AWCS pipeline and required connec-
tions such as storage section from the termination of Vertical garbage chute along
with analog level sensors, discharge valve and air inlet valves, sectioning valves,
silencers, bends, Y-pipes, accessories such as conduiting, compressed air tubing,
and inspection door with acoustic insulation at the cost of Developer from chute
end in the building up to the Utility Tunnel.
All straight solid waste conveyance pipes shall be of spiral or longitudinal
welded carbon steel for ordinary duty.
Pipe work, Fittings & Joints material shall be as per: IS 3589 FE
508mm OD. The thickness varies from 6mm – 8mm depending upon the
erosion due to waste generation from the plot. The transport pipe shall nom-
inally vary in thickness. This is due to the abrasion experienced through
wear and tear at intermediate joints or bends and from varying waste loads.
Each fitting shall be designed to stand erosion and abrasion produced by
Method of examination and testing of pipe installation shall be as per stand-
ards prescribed by the Service Provider.
Whenever the pipe shall cross a road where heavy traffic load is ex-
pected an adequate concrete sleeve shall be provided.
Special bends of abrasion resistant steel as required based on the pipe pro-
file as per the design calculation confirmation submittal will be installed in
desired locations as per the requirement.
Pipe shall be supplied in lengths no shorter than 5.8 meters.
www.giftgujarat.in 37 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Pipe branches shall be located in a manner ensuring the smooth flow of
solid waste from one branch to another. The maximum branch angle shall
not exceed more than 30 degrees.
Air Pipe shall be laid as per standards prescribed by the Service Provider.
All piping shall be free of burrs, beads, or protrusions into the air stream.
The air pipe system shall be provided with all necessary sectioning valves,
non-return valves, silencer and sleeves.
Buried pipes shall be corrosion protected with Bitumen layer coating. All
pipe joints and pipe to fitting joints shall be fully welded. The maximum
internal protrusion of all weld joints shall not exceed 3mm. Pipe supports
shall be provided as and when required for stable and sufficient support of
the solid waste conveyance pipe. The average distance between supports
shall not exceed 6m. Exposed supports shall be painted only. Suitable vi-
bration isolation pads shall be provided to isolate the pipe from building
structure where necessary.
All pipe joints will be welded to achieve air tightness.
5.2 AIR INLET VALVES
The air inlet valves (AV) shall be provided to create an air flow in the pipe
system and Discharge valves (DV) shall be provided for controlling the
input of waste into the pipe system
The air inlet valve shall be pneumatically operated (open/close) actuation.
The signal to actuate the valve is received from the PLC situated in the
centralized solid waste collection station. This signal shall be relayed to the
air inlet valve via the Remote Terminal Unit (RTU).
www.giftgujarat.in 38 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
The valve housing/frame and valve plate shall be of mild steel construction.
The valve plate shall be provided with suitable sealing gasket to ensure that
the valve remains airtight when closed. The air inlet throttle disc shall be
sized to provide the required vacuum depression in the solid waste transport
Each air inlet valve shall be provided with an integrated silencer to reduce
the air suction noise level to an acceptable level. The silencer shall be con-
structed of mild steel with suitable acoustic treatment material and its de-
sign shall not impede the smooth intake of air into the solid waste transport
pipe. The silencer design and construction shall allow for easy and quick
maintenance of the air inlet valve.
The air inlet valve shall be normally installed at ground floor along with
the Discharge valves in the garbage waste room, in close proximity to the
discharge valve. The valve shall remain open less than 1 minute per indi-
vidual collection time.
5.3 DISCHARGE VALVE
The discharge valve shall be pneumatically operated (open/close actua-
tion). The signal to actuate the valve shall be received from the PLC situ-
ated in the centralized solid waste collection station.
The valve housing and secondary components shall be of mild steel con-
struction. The main valve plate shall be 12mm thick mild steel and provided
with suitable sealing gasket to ensure that the valve remains airtight when
closed. The discharge valve construction and its components shall be of
sufficient design and strength to withstand the high impact load of solid
waste falling from high levels at all times.
www.giftgujarat.in 39 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
The discharge valve shall provide for the smooth, efficient and complete
discharge of solid waste into the solid waste transport pipe.
For ease of maintenance and part replacement the discharge valve shall be
made in 2 main separable sections, each section having a flange end con-
nection held together by bolts and nuts. For ease of maintenance, the dis-
charge valve must be capable of being dismantled to allow for valve plate
replacement on site.
All valves are heavy duty to remain airtight during the lifetime of the in-
stallation. Discharge valves (DV) shall be dimensioned to withstand the
impact from falling waste in high rise buildings.
5.4 AIR COMPRESSORS
Compressor to be installed at garbage room to cater compressed air for op-
eration of pneumatic valves for AWCS system.
Compressor with its accessories like drier, air manifold, limit switch etc.
are part of air compressor unit.
Developer needs to provide electrical point of 20Amp each 5nos of plug
point with switch, socket and MCB for air compressor and other equip-
Air compressor has drain valve to drain moisture accumulated in air re-
ceiver which needs to be drain in garbage room drain point.
Developer needs to arrange drain arrangement for the same in garbage
room by installing suitable piping or by giving additional drain point in
www.giftgujarat.in 40 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Air compressor makes minor noise during operation, developer needs to
take care during design of garbage room with at list 5m3 /sec air flow ven-
tilation of fresh air.
During operation and maintenance work compressor may needs to remove/
repair or replace. Developer needs to design adequate door size of garbage
room in view of movement of AWCS equipment’s and do not disturb build-
ing operations.
6. OPERATION AND MAINTENANCE
6.1 LIST OF DOCUMENTS
The Developer has to provide but not limited to following documents for in-
spection as and when required by GIFTCL / GPCB / CPCB / MoEF’s repre-
Availability of Detailed plan / Drawings
Operation and Maintenance Manual
Schedule of Daily Operation
Schedule of Inspection of Machinery
Records of Key Activity of O & M
Staff position / Organogram / Hierarchy
Inventory of Stores
www.giftgujarat.in 41 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
6.2 O & M GUIDELINES
The Developer is responsible for providing O&M services related to the
Vertical Garbage Chute and Hopper Doors and is responsible for the safe
and efficient operation of the same at all times and as per the sub clause
Operation and routine maintenance work shall include the day to day oper-
ation, inspection, performance logging, maintenance, servicing, periodic
testing and calibration of the equipments.
Any tools, equipment, testing instruments, consumable items and sundry
materials required for the operation and routine maintenance work shall be
provided by the Developer. Safety and protective equipment such as safety
helmet, shoe, eye protectors, ear shields, etc. shall also be included.
Uniform shall be provided for wearing by workers at all time while on duty
and shall bear the Developer’s company name. The cost of such provision
shall be borne by the Developer.
Remote Operation- Operation shall be carried out remotely using the des-
ignated remote-control software.
Operation, Routine Maintenance, Preventive Maintenance & Break down
maintenance shall be carried out.
All necessary maintenance and operation staff experienced on both me-
chanical and electrical work such as engineers, foremen, operators, me-
chanics, helpers, etc., for effective maintenance and operation of all sys-
tems should be engaged.
Provide sufficient personnel to operate a 24 hours per day, 7 days per week.
Sufficient personnel shall remain on duty on the Premises at all times to
immediately respond to emergency maintenance and repair work.
www.giftgujarat.in 42 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Keep all records, logbooks, log sheets, maintenance job cards, etc., in neat
order to the satisfaction of the GIFTCL’s Representative. All records, log-
books and log sheets, charts, maintenance job cards, etc., shall become the
property of the GIFTCL.
Operate, control, maintain, replace and repair any part of equipment or ma-
terial within the systems which may prove defective due to Developer’s
design, erection, operation, performance, or workmanship, or prove defec-
tive from any act or omission that may develop from use in the works or
any section thereof. Defective is hereby defined to include, but not limited
to operation or control system failures, Performance below required mini-
mum, excessive wear, unusual deterioration or aging of materials or fin-
ishes, unsafe conditions, the need of excessive maintenance, abnormal
noise or vibration and similar unusual, unexpected and unsatisfactory con-
Provide all spare parts for replacements made necessary due to wear and
tear of equipment. Provide all consumable such as: refrigerants, oils,
grease, filters, chemicals, etc., and all tools and maintenance equipment re-
quired for proper operation and complete maintenance of the Works.
Provide all routine operational maintenance and full prevention mainte-
nance as recommended by the equipment manufacturers to keep equipment
and systems in proper operation condition.
Allow for maintaining adequate stocks of all manufacturer’s recommended
spare parts and consumables as necessary to guarantee that all equipment
and systems can be immediately repaired and properly maintained in satis-
factory operation condition at all times.
www.giftgujarat.in 43 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
The Developer shall provide un-restricted access at all times 24x7x 365 to
the AWCS team to carry out O&M and call outs related to the AWCS
equipment installed in the Developers plot. This will be carried out by the
designated service provider or GIFTCL.
www.giftgujarat.in 44 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
ANNEXURE I APPLICATION FORM FOR SOLID WASTE CONNEC-
For all types of New Connections: Developer/Consumer must have to apply for their connec-
tions exclusively through this online portal (https://utilities.giftgujarat.in/)
www.giftgujarat.in 45 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
www.giftgujarat.in 46 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
ANNEXURE II GENERAL TERMS AND CONDITIONS
The following terms and conditions will apply and govern the solid waste con-
nection to Commercial / residential/ Institutional Applicant of GIFTCL hereinaf-
ter referred to as the “Service Provider”).
1. DEFINITIONS:(i) “Agreement” means the an application form
along with general terms and conditions and other incidental documents signed
and submitted by the Applicant for the solid waste connection at a specified lo-
cation within building envelope and duly accepted by the Service Provider.
(ii) “Applicant” or “Consumer” means a Legal Entity (a company, partner-
ship firm, LLP, Housing Society or Trust) or a proprietary concern or an
individual, who has applied for solid waste Connection for commercial /
residential / institutional purpose.
(iii) “Application” means the request by an Applicant for Connection of solid
waste in the prescribed format / application form of the Service Provider
duly filled and signed by the Applicant.
(iv) “Automated Waste Collection System” means transfer of waste through
the underground pipeline or utility trench.
(v) “Bill” means monthly bill or for such period as determined by the Service
Provider, for the solid waste connection, to be issued by the Service Pro-
vider, for Minimum Fixed Charges or charges for the solid waste connec-
tion and such other incidental charges, taxes, cess, duties and levies payable
by the Consumer.
www.giftgujarat.in 47 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
(vi) “Consumer” means the Applicant to whom the connection for solid waste
for commercial / residential / institutional purpose has been installed.
(vii) “Connection” means installation of combination of one or more pipelines,
related fittings, discharge valves, regulator, chutes, etc. in Applicant’s Site
in order to be able to solid waste connection to the Applicant.
(xl) “Domestic Connection” means the connection used for Residential
(xli) “Non-Domestic connection” means the connection used for commercial,
institutional, hospitals, public uses, horticulture and fire demand.
(viii) “Delayed Payment Charges” means the charges as are payable by the
Consumer as per rate given in the Tariff Card, for late payments of the Bill
or such other demands raised by the Service Provider.
(ix) “Reconnection” means, restart of the supply for the solid waste connection
on fresh application submitted by the Applicant, after termination.
(x) “Security Deposit” means the amount of security (interest free) to be de-
posited by the Applicant, as per the Tariff Card, at the time of Application
for Connection or Reconnection.
(xi) “Service / Services” means discharge of solid waste from automated waste
collection system of Service Provider.
www.giftgujarat.in 48 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
(xii) “Site” means the building or property or establishment owned or occupied
by the Applicant in the GIFT notified area from where the applicant would
connect the solid waste to the main pipeline of the service provider.
(xiii) “Solid Waste” means solid wastes generated from Commercial / Residen-
tial/ Institutional consumer in GIFT City notified area, limited to organic,
inert, mixed residue and recyclable waste which includes paper, plastic,
cardboard, glass, metal, except construction debris, E-waste and Hazardous
(xiv) “Tariff Card” means a schedule, issued by the Service Provider, from time
to time, in respect of the Security Deposit, Charges for New Solid Waste
Connection, Delayed Payment Charges and such other charges to be paid
by the Applicant/ Consumer to the Service Provider.
(xv) “Termination” means as defined in clause 10.1 of this Agreement.
2. DISCHARGE OF SOLID WASTE:
2.1 The discharge of solid waste would be allowed, at the discretion of the Ser-
vice Provider and the Service Provider shall at any time, be entitled to with-
draw the Services.
2.2 By submission of this Application duly filled by the Applicant, shall be
deemed to have unconditionally agreed to and accepted discharge of solid
waste on the terms and conditions herein contained, and these terms and
conditions shall constitute a binding Agreement between the Service Pro-
vider and the Applicant.
3. USE OF CONNECTION OF SOLID WASTE:
www.giftgujarat.in 49 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
3.1 Solid waste connection shall be used only for the purpose of discharging
solid waste from the building as per the type of Connection requested for
in the Application form at the Site and shall not be permitted/allowed to be
used for any other purpose.
3.2 Applicant shall have to obtain the specific prior written permission of the
Service Provider for change in installing any pipe line and / or modification
/ alteration/ transfer of the Connection.
3.3 The Applicant shall not discharge the solid waste from any other Site or
permit any other person or party to use the solid waste connection.
4. CONNECTION OF SOLID WASTE:
4.1 On submission of the Application and payment of the security deposit
charges as per the tariff card, the Service Provider or its representative will
carry out a technical survey of the Site.
4.2 On completion of the technical survey, the Service Provider shall determine
the location and manner of laying discharge valves & temporary storage for
discharge of solid waste as per the prevailing engineering norms. The ap-
plicant shall make necessary arrangement for discharge of solid waste into
main Automated Waste Collection System pipeline (outside the building
but in / out of the utility trench) of the service provider. The applicant shall
be required to comply with the standard engineering norms and practices
for the connection and shall also follow the instruction as may be given by
the Service Provider. If at the time of connection or subsequently any dam-
age caused to the property / pipeline/ system of the service provider it shall
www.giftgujarat.in 50 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
be repaired by the applicant at his own cost as per the satisfaction of the
service provider.
4.3 The solid waste connection will be provided subject to necessary approval
and permission being received along with the payments of the applicable
charges, received from the Applicant as charges towards the cost of provid-
ing the connection as well as payment of security deposit.
5. CHARGES/CONTRIBUTION:
5.1 The solid waste connection shall be valid only after receipt of security de-
posit and completion of all formalities by the Applicant.
5.2 The solid waste connection charges in various segments like Commercial,
residential, institutional will be determined by the Service Provider. These
charges may be subject to revisions form time to time, without prior notice
to the Applicant.
5.3 All cess, taxes, duties, assessments and any other levies imposed or to be
imposed in future by any State or Central Government or any Statutory Au-
thority in relation to the discharge of solid waste shall be passed on and be
payable by the Applicant.
5.4 For any extension / modification, rectification / alteration of the pipeline /
meter / regulator or any part of the Connection, the Applicant shall request
the Service Provider in the format prescribed by the Service Provider or by
a written request. The request shall be considered by the Service Provider
and subject to the technical feasibility and receipts of advance payment for
the said charges are undertaken by the Service Provider. The charges for
www.giftgujarat.in 51 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
the same may be decided by the Service Provider. In no case, the Applicant
shall have the right to modify / alter the Connection without prior consent
of the Service Provider. In the event if it is found that the Connection has
been modified / altered / tampered in part of whole, the Service Provider at
its sole discretion may discontinue the services and shall forfeit the regis-
tration fees. The decision of the Service Provider shall be final and binding
upon the Applicant.
6. BILLING AND PAYMENT:
6.1 The solid waste disposal charges shall be billed on the basis of the total
built up area and /. The decision of the Service Provider as for the charges
to the Applicant shall be final.
6.2 A Bill shall be sent for charges on a monthly basis i.e. once in a month or
as determined by the Service Provider at the prevailing rate of charges for
solid waste disposal in the particular period. (The Bill will include all other
taxes, cess, duties and levies) payable for the relevant period by the Appli-
6.3 The Service Provider reserves its right to vary the period / frequency and
manner of billing from time to time without prior notice to the Applicant.
Every Bill issued by the Service Provider shall be paid in full or before its
due date by the Applicant or else Service Provider has the right to stop the
services without any prior notice to the Applicant.
6.4 In case of payment after due date, the Applicant shall have to pay delayed
payment charge at rates, as decided by the Service Provider from time to
www.giftgujarat.in 52 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
6.5 In case of dishonor of any cheque for any charges payable to the Service
Provider, the Applicant shall without prejudice to the other rights of Service
Provider hereunder or in law, be liable to pay to Service Provider such
6.6 Applicant shall bound to make payment of bill in full or before the due date
even in the cases where the Applicant has lodged complaint or raised any
dispute with respect to the solid waste charges or otherwise In case of any
dispute or any discrepancy with respect to amount of bill, the Applicant
shall be required to lodge his complaint within 7 (seven) days after the pay-
ment is made. Service Provider reserves the right to stop services without
any prior notice in case of non-compliance with the above by the Applicant.
6.7 If the due date for making payment of any charges is falling either on Sun-
day or holiday then the same shall be considered to be due on the previous
day of the holiday.
6.8 The Applicant shall at all times from the date of connection of solid waste
till the expiry or termination of this Agreement will pay and maintain pay-
ment of security deposit to the Service Provider. The Service Provider
would not pay any interest on the security deposit to the Applicant.
6.9 The security deposit shall be as per Tariff Card.
6.10 The Service Provider would adjust any unpaid amount from security de-
posit, if the Applicant fails to pay any sum due and payable by the Applicant
under this Agreement. The decision of the Service Provider shall be final
and binding upon the Applicant.
www.giftgujarat.in 53 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
6.11 Subject to no unpaid amount from the Applicant, the security deposit will
be refunded to the Applicant after on termination of the Agreement, or any
such matter without any interest on this amount.
7. OBLIGATION OF THE APPLICANT:
7.1 Prior to the commencement of solid waste connection, the Applicant shall
at its own cost obtain all necessary consents, approvals and permissions
from all relevant authorities as may be required to obtain the Solid Waste
Connection. It will be the sole responsibility of the Applicant to obtain all
such “No Objection Certificates” (NOCs).
7.2 The applicant has to make necessary provision for internal chute, discharge
valve, temporary storage etc. for discharge of solid waste into the main
pipeline of automated waste collection system (outside the building in/out
of the trench) at its own cost & shall comply with the standards provided
by the service provider.
7.3 The Applicant shall permit the Service Provider’s authorized representative
to access the Site for the purpose of laying pipelines and undertaking in-
stallation and also to alter or replace any pipeline, undertaken any inspec-
tion, installation of equipment if the Service Provider in its discretion de-
termines the same to be necessary or expedient.
7.4 The Service Provider reserves the right to discontinue the Services in the
event of any dispute between the Applicant and the Service Provider.
7.5 The Applicant shall take all adequate precautions and adopt all safety
measures to safeguard pipeline, valves and other equipments installed by
www.giftgujarat.in 54 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
the Service Provider for solid waste connection. In case the Applicant car-
ries out any unauthorized repair, alteration, modification, directly or indi-
rectly, in the pipeline, valves, equipments installed for the purpose of solid
waste connection, the same shall be deemed to be breach of the contractual
terms contained therein and in case of any accident, the Applicant shall be
solely responsible for the same. Service Provider shall not take any respon-
sibility on account of the same. Service Provider has the right to stop the
services immediately in such cases.
8 PROPERTY/OWNERSHIP:
8.1 Pipe fittings and other installations used for the purpose of discharge of
solid waste up to the main pipeline of automated solid waste collection sys-
tem (outside the building in/out of the trench) shall be done by the Appli-
cant and the Applicant shall maintain the pipelines up to automated solid
waste collection system, in working condition.
8.2 The manner and mode of discharge of solid waste is at the absolute discre-
tion of the Service Provider.
8.3 The Applicant shall permit the authorized representative of the Service Pro-
vider to enter upon the property/Site for the purpose of inspection and
maintenance checkups. The Applicant shall verify the identification of such
authorized representative prior to permitting such persons access upon the
property/Site. The Service Provider shall not be liable/responsible for the
entry by any unidentified person or any imposter or person claiming to rep-
resent our act on behalf of the Service Provider.
www.giftgujarat.in 55 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
8.4 The Applicant shall not tamper or interfere, nor permit any tampering or
interference with the pipes, equipment and other installations for the pur-
pose of solid waste collection. Service Provider shall, without prejudice to
its other rights, be entitled to disconnect the Services without giving any
prior notice and shall be entitled to recover suitable compensation for any
damages caused by the Applicant.
8.5 The Applicant shall not adjust, clean, repair, replace or otherwise handle
any of the pipes, equipment and other installation. Any damage or break-
down in the pipes, installations and equipment shall be immediately inti-
mated by the Applicant to the Service Provider.
9. SOLID WASTE DISPOSAL BY THE SERVICE PROVIDER:
9.1 The Service Provider will endeavor to provide the Applicant with con-
sistent and regular Services for solid waste disposal.
9.2 The Service Provider reserves the right to revise solid waste collection
charges from time to time without any prior notice.
9.3 The Service Provider will collect the solid waste from the main pipeline of
automated waste collection system outside the building in/out of the utility
9.4 There shall be no rebate provided to the Applicant in case of any loss due
to breakage in the upstream of the main pipeline. The Service Provider upon
intimation by the Applicant shall rectify the problem in the main pipeline
however shall not be liable for any compensation.
www.giftgujarat.in 56 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
10. TERMINATION:
10.1 Without prejudice to the other rights of the Service Provider in law other-
wise, the Service Provider may at any time, immediately and without notice
disconnect the Services and terminate the Agreement with the Applicant,
(i) The Applicant fails to pay the Service Provider any sum due to the Ser-
vice Provider under the terms and conditions and/or otherwise within
30 days from the due date of payment thereof.
(ii) The Applicant fails to comply with any of its obligations and/or com-
mits any breach of the covenant or conditions on his part to be observed,
performed of fulfilled.
(iii) The particulars as furnished by the Applicant in the Application are
found to be false or incorrect.
(iv) The solid waste connection is used by the Applicant for any other pur-
(v) The Applicant tampers/modifies/alters the Connection without the con-
sent of the Service Provider.
10.2 The Applicant may, by written notice of one month to the Service Provider
requests Termination of solid waste connection.
(i) In such case, no charges/contributions paid by the Applicant to the Ser-
vice Provider shall be refunded except the Security Deposit, without
www.giftgujarat.in 57 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
any interest, subject to settlement of all pending bills and dues by the
10.3 In the event of Termination of the solid waste Connection, without preju-
dice to the other rights of the Service Provider:
(i) The Service Provider shall suspend the Services.
(ii) The Applicant shall be liable to pay the Service Provider all amounts
due till that date of Termination of this Agreement.
11. RECONNECTION:
11.1 If after termination the Applicant applies for the restart of the solid waste
connection, all (“Reconnection”) charges like Connection / commissioning
(as determined by the Service Provider) shall be borne and paid by the Ap-
plicant and Applicant has to complete all formalities related to new Con-
11.2 Reconnection of solid waste will be at the sole discretion of the Service
Provider and the Service Provider may refuse the same, without assigning
any reasons whatsoever.
12. TRANSFER OF THE CONNECTION:
12.1 The Service Provider permits transfer of the solid waste connection from
one name to another name in the event of transfer or assignment of the
leasehold rights of the Building, The transfer will be permitted subject to
the payment of such charges as may be decided by the Service Provider,
from time to time. The transfer of solid waste connection from one name to
www.giftgujarat.in 58 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
another name is subject to submission of fresh application and necessary
documents, as may be required by the Service Provider and will be affected
only upon full satisfaction by the Service Provider.
13. LIABILITY / INDEMNITY:
13.1 The Applicant shall not use the solid waste connection for any illegal or
unlawful activity or purpose. In case of any offense under or violation of
any law, statute or regulation by the Applicant, the Applicant alone shall be
responsible and liable for the said offense or violation and the Applicant
agrees to indemnify and keep indemnified the Service Provider from and
against any loss, claim, action or proceeding that may be suffered or in-
curred by the Service Provider as a result of any such offense or violation
by the Applicant.
13.2 The Applicant shall be liable for any loss or damage caused to pipes equip-
ment or installations whether caused on account of negligence by the Ap-
plicant or its associates or agents or due to theft, sabotage or otherwise how-
13.3 The Applicant shall be deemed to be in exclusive possession and control of
the solid waste up to the main pipeline of Automated Waste Collection Sys-
tem outside the building in / out of the utility trench and the Applicant shall
be liable for any damage caused to any person or property as a result
thereof. Accordingly, the Applicant shall protect, indemnify and hold the
Service Provider harmless against all claims, demands, actions, suits, pro-
ceedings, judgments and all liabilities, costs, expenses, damages or losses
www.giftgujarat.in 59 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
arising out of resulting from or incidental or in connection with the dis-
charge of solid waste.
13.4 The indemnity provisions will be enforceable notwithstanding termination
of Services for solid waste disposal.
13.5 The Service Provider will put in his best endeavor to cause minimum dam-
age to garden, lawn, plants, decorations, tiles and any other decorative sur-
face within the premises of the Applicant both on the ground and on the
walls. Accordingly, the Applicant shall protect, indemnify, and hold the
Service Provider harmless against all claims, demands, action, suits, pro-
ceedings, judgments and all liabilities costs, expenses, damages or losses
arising out of resulting from or incidental to or connection with the disposal
of solid waste.
14. FORCE MAJURE
The Service Provider shall not be liable for any loss / damage, costs,
charges or expenses whatsoever that may be caused to or occasioned by the
Applicant or another person on account of failure to perform or for the delay
in performing any provisions of this Agreement if the same is caused or
results due to acts of God, War, Revolt, Fire, Tempest, Flood, Earthquake,
Lighting, direct or indirect consequences of God (declared/undeclared)
Sabotage, Hostilities, National emergencies, civil disturbances, commo-
tion, embargo or any other law promulgation, regulation or ordinance
whether Central or State or Municipal, breakage bursting or freezing of
pipeline or occurrence of any event beyond the control of the Service Pro-
vider provided further that the Service Provider shall not be responsible
www.giftgujarat.in 60 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
and/or liable for any losses direct or consequential caused to the Applicant
if the same is caused due to the reasons stated hereinabove.
The Service Provider may at any time amend, add to or delete any or all
these terms and conditions with immediate effect and in such case, the
amended terms and conditions shall be informed to the Applicant and shall
be binding on the Applicant.
16. TERMS BINDING ON SUCCESSORS:
These terms and conditions shall be binding on the heirs, administrator,
successor and assigns of the Applicant.
Any notice to the Applicant will be sent to the address of the Applicant
stated in its Application.
18. ARBITRATION:
All disputes arising out of this Agreement shall be referred to the sole arbi-
trator appointed by the M.D/CEO of the Service Provider and the provi-
sions of The Arbitration and Conciliation Act 1996 shall be applicable. The
award of the Sole Arbitrator shall be final and binding on both the Service
Provider and the Applicant. The seat of arbitration shall be at Gandhinagar
However, in case of any application or appeal to be preferred. The courts at
Gandhinagar would only have the exclusive jurisdiction.
www.giftgujarat.in 61 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
I confirm that I am authorized to make this Agreement with GIFTCL for supply
of Water. I do hereby declare that I have read and understood the above terms and
conditions including the charges as applicable from time to time. I hereby accept
the above stated terms and conditions in its entirety, irrevocably and uncondition-
ally and accordingly put and subscribe my hand to these terms and conditions.
Name of the Applicant/Developer Sign and seal of the Representative
of Applicant/Developer
www.giftgujarat.in 62 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Tariff Structure
I. Permanent New Connection Charges:
(The Connection charges/ tariff structure is subject to change from time to time
by the Service Provider.)
I. New connection charges:
This one-time charge is in the form of connection charges which is fixed, non-
2. Cost Recovery
I. Recovery of connection charges includes cost of followings:
1) Inside Garbage room: Air Valve, Discharge Valve, Storage Section, Con-
trol cables, Level Sensors, Control panel.
2) Up to 50 meters of AWCS pipeline from bottom of the DV.
Il. Cost recovered through DR charges includes followings infrastructure de-
1) After 50 meters of AWCS pipeline from garbage room to Central Waste
Handling Facility (CWHF) through utility tunnel
www.giftgujarat.in 63 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
2) Development of CWHF
3) Treatment plant and disposal
Security Deposit (interest free)
Sr. No. Consumer Category Solid Waste (INR)
3 months X Collection Charges as applicable for
4 months X Collection Charges as applicable for
2 Non - Domestic
Collection Tariff
Charges for FY 2025-26 i.e. from 1st April 2025 to 31st March
Sr. Consumer Cate-
Sq. Ft. of BUA)
2 Non - Domestic
www.giftgujarat.in 64 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
Phasing of Collection Tariff
Timeline after issuing Occu-
Sr. No. pancy Certificate (OC) to Charges as per BUA
10% of BUA or actual occu-
1 0 months to 12 months
pancy whichever is higher
30% of BUA or as per actual
2 12 months to 24 months BUA occupied whichever is
60% of BUA or as per actual
3 24 months to 36 months BUA occupied whichever is
4 > 36 months 100% of BUA
Delay Payment Charges
Sr. No. Penalty
1 Domestic 18% interest per an-
num of the bill
Non – Do- amount payment after
mestic due date
The manual collection of solid waste will be treated as per non-domestic
charges/tariff.
www.giftgujarat.in 65 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
All the above rates/ charges/ tariff mentioned are exclusive of all taxes
The billing will commence from the date of connection.
The above charges are subject to change from time to time by the Service Provider.
Penalty/ Cost recovery from developers for violation/ misuse of system
www.giftgujarat.in 66 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
ANNEXURE – III TYPICAL CHUTE DRAWING
www.giftgujarat.in 67 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
ANNEXURE – IV GARBAGE ROOM ARRANGEEMNT AT GROUND
www.giftgujarat.in 68 Ready Reckoner for solid waste connection
GIFT City (Solid Waste Connection)
ANNEXURE – V GARBAGE ROOM ARRANGEEMNT AT BASEMENT
www.giftgujarat.in 69 Ready Reckoner for solid waste connection
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GIFTCL Pricing and Allotment Policy.pdf
Notification GST Exemption.pdf
Schedule - II Infrastructure details.pdf
Schedule - IV Handbook for Developers _ July 2021.pdf
Schedule - X -GIFT City IBMS Guidelines.pdf
ScheduleXI Basic Cabling Services Guidelines in GIFT City.pdf
Schedule - XII - Telecom IBMS Checklist for Developer.pdf
Schedule-IX DCS_Ready Reckoner_V4.pdf
Schedule-V Electrical_Ready Reckoner_V7_compressed.pdf
Schedule-VI Water Connection_Ready Reckoner_V4.pdf
Schedule-VII Sewage Connection_Ready Reckoner_V4.pdf
Schedule-VIII Solid Waste Connection_Ready reckoner_V4.pdf
1 . 22-3-2011-GOG-Revenu Dept-Gujarati-662 Acre.pdf
2 . 22-3-2011-GOG-Revenu Dept-Gujarati-11 Acre JAGADHA.pdf
3. 15-4-2011-GOG-Collector-Gujarati.pdf
4. 7-6-2011-GOG-Revenu Dept-Gujarati.pdf
5. 10-6-2011-GOG-Collector-Gujarati.pdf
6. 01.03.2014-GOG-Registration Fee Exemption.pdf
7. 01.03.2014-GOG-Registration Fee Exemption_2.pdf
Collectors Order-02.06.2022.pdf
GR-22.04.2022.pdf
01_Tariff Card_Water.pdf
02_Tariff Card_Sewage connection.pdf
03_Tariff Card_AWCS.pdf
04_Tariff Card_DCS.pdf
GIFTPCL-Tariff Order-2026-27.pdf
RFP_Mall.pdf
Download all tender documents and submit your bid