| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹8,754.44 (4.93%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹17,528.37 (9.88%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical NIT no. and S no. of work not mention ON CDR |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
9 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
PLS REFER NIT
2026_RDPR_323038_60
e-NIT No. 71 REW Rajouri of 2026 Dated 22-08-2026
Open Tender
Civil Works
Percentage
90 days
RAJOURI
PLS REFER BOQ
2 documents required · 2 mandatory
₹300
Revenue Head
₹4,000
Yes
2 Oct 2026
2 Sept 2026
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundations,drains,pipes,cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc.getting out excavated earth and disposal of surplus excavated earth as directed:80%AKS & 20 ordinary rock | 9.72 | Cum | 568.4 | ₹5,524.85 |
| 2 | Reinforced cement concrete in beams ,suspended floors.roofs having slopes upto 15 degree landings,balconies,shelves,chajjas,lintels,bands,plain windows sills,stair cases and spiral stair cases upto 5 level including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size) | 2.18 | Cum | 9,821.85 | ₹21,411.63 |
| 3 | Steel Reinforcement for RCC Work including straightening,cutting,bending,placing in position and binding all complete above plinth level . Thermomechanically treated bars of grade Fe-500D or more | 250 | kg | 123.2 | ₹30,800 |
| 4 | Centering and shuttering including strutting,propping etc and removal of form forWalls(any thickness)including attached pilasters,buttresses,plinth and string courses etc. | 43.44 | sqm | 573.85 | ₹24,928.04 |
| 5 | Centering and shuttering including strutting,propping etc and removal of form foroundations,footings,bases of columns etc.for mass concrete | 3.66 | sqm | 286.35 | ₹1,048.04 |
| 6 | Centering and shuttering including strutting,propping etc and removal of form Suspended floors,Roofs,Landings,Balconies and access platforms | 6 | SQM | 718.2 | ₹4,309.2 |
| 7 | Centering and shuttering including strutting,propping etc and removal of form for Edges of slabs and breks in floors and walls (above 20 cm wide | 2.64 | SQM | 1,145.1 | ₹3,023.06 |
| 8 | supplying and laying of stone | 5.46 | cum | 937.9 | ₹5,120.93 |
| 9 | Filling available excavated earth (excluding rock) in trenches ,plinth sides of foundations etc.in layers 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50 m | 21 | Cum | 218.4 | ₹4,586.4 |
| 10 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 0.9 | Cum | 4,826.5 | ₹4,343.85 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_1086976.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .