| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹86.4 LAccepted-Finance | ₹86.4 L | 1 | Accepted-Finance Lowest-1 bidder |
| 2 | 2₹91.7 LRejected-Finance | ₹91.7 L | 2 | Rejected-Finance Lowest-2 bidder |
| 3 | Rejected-Technical P W D CONTRACTOR REG NO CLASS IB 1 OFF 28 11 DHAVJ ROAD NEAR OUR LADY OF MOUNT MARY CHURCH OLD GOA 403402 | NORTH GOA | GOA | 403402 | - | - | Rejected-Technical Copy of GST registration certificate Not Attached. . Hence bid is rejected. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Valid registration certificate, GST returns from July to Dec 2024 not attached. Pan Card is in name of Dilip Kumar Sharma and not in the Firm name. Required affidavit not provided. Hence bid is rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical GST Returns for the months from July to Dec 2024 not attached. Hence bid is rejected. |
| Sl No | Description | Qty | Unit | SRI SINDHU CONSTRUCTIONS L2 | V SURENDRA NAIDU L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of debris by mixed with boulders and fallen cyclopean stones, collecting the useful cyclopean stones for reuse including stacking them and disposal of the unserviceable material etc., complete as directed by the site in-charge. | 106.41 | Cum | 1,950 ₹2.1 L | 1,770 ₹1.9 L |
| 2.00 | Carefully removal of unmatched bulged out stone masonry and stacking useful materials for reuse and disposal of debris including lifting down of material up to 3.00m height as per site condition etc., complete as directed by the site in-charge. | 84.12 | Cum | 2,850 ₹2.4 L | 2,800 ₹2.4 L |
| 3.00 | Missing portion veneering stone (with Granite stone/ Sand stone/Khandolite stone) in lime mortar (1:2) and pointing stone joints in same mortar, curing including cost of all materials, loading, unloading and seigniorage Charges etc., complete as directed by the site in-charge. | 85.21 | Cum | 57,000 ₹48.6 L | 53,300 ₹45.4 L |
| 4.00 | Core filling in between the veneer Walls by using RR stone boulders of required size in Lime Mortar (1:2) as per the existing pattern including cost of all materials, loading, unloading, seigniorage charges and all taxes etc., complete as directed by the site in-charge. | 110.97 | Cum | 15,000 ₹16.6 L | 14,000 ₹15.5 L |
| 5.00 | Lime Concrete on top of the walls (1:2:4) by using 20mm Hard Broken Brick aggregate including cost, conveyance of all materials, labour charges, curing charges, beating with wooden bats, loading unloading charges, mixing charges, transport and placing and seigniorage charges etc., complete as directed by the site in-charge. | 5.8 | Cum | 13,200 ₹76,560 | 12,500 ₹72,500 |
| 6.00 | Removal of damaged old stone flooring inside the structure including labour charges and all taxes etc., complete as directed by the site in-charge. | 30.18 | Cum | 1,500 ₹45,270 | 1,150 ₹34,707 |
| 7.00 | Earth work excavation in foundation in hard rock including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil etc., complete as directed by the site in-charge. | 26.78 | Sqm | 1,400 ₹37,492 | 1,150 ₹30,797 |
| 8.00 | Laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level: (1:4:8) (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) including laying, curing etc., complete as directed by the site in charge. | 2.9 | Cum | 8,500 ₹24,650 | 7,800 ₹22,620 |
| 9.00 | Construction of Random rubble masonry with hard stone in foundation and with: Cement mortar (1:6) (1 cement: 6 coarse sand) including laying, curing etc., complete as directed by the site in-charge. | 17.42 | Cum | 8,500 ₹1.5 L | 8,300 ₹1.4 L |
| 10.00 | Construction of Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level in cement mortar (1:6) (1 cement: 6 coarse sand) including cost, conveyance of all materials, labour charges and GST etc., complete as directed by the site in charge. | 16.34 | Cum | 11,600 ₹1.9 L | 11,200 ₹1.8 L |
Tender Value
₹84.5 L
EMD Value
₹2.1 L
Closing Date
6 Aug 2025, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P)
As per Tender document
2025_ASI_869277_1
01/NIT/2025-2026/Amaravati/ Anantapuramu sub Circle
Open Tender
Civil Works
210 days
RAYADURG, ANANTAPURAMU DIST
As per Tender document
3 documents required · 3 mandatory
₹0
₹2.1 L
Yes
18 Dec 2025
17 Jul 2025
8 Aug 2025
17 Jul 2025
6 Aug 2025
17 Jul 2025
Amount
Removal of debris by mixed with boulders and fallen cyclopean stones, collecting the useful cyclopean stones for reuse including stacking them and disposal of the unserviceable material etc., complete as directed by the site in-charge.
Carefully removal of unmatched bulged out stone masonry and stacking useful materials for reuse and disposal of debris including lifting down of material up to 3.00m height as per site condition etc., complete as directed by the site in-charge.
Missing portion veneering stone (with Granite stone/ Sand stone/Khandolite stone) in lime mortar (1:2) and pointing stone joints in same mortar, curing including cost of all materials, loading, unloading and seigniorage Charges etc., complete as directed by the site in-charge.
Core filling in between the veneer Walls by using RR stone boulders of required size in Lime Mortar (1:2) as per the existing pattern including cost of all materials, loading, unloading, seigniorage charges and all taxes etc., complete as directed by the site in-charge.
Lime Concrete on top of the walls (1:2:4) by using 20mm Hard Broken Brick aggregate including cost, conveyance of all materials, labour charges, curing charges, beating with wooden bats, loading unloading charges, mixing charges, transport and placing and seigniorage charges etc., complete as directed by the site in-charge.
Removal of damaged old stone flooring inside the structure including labour charges and all taxes etc., complete as directed by the site in-charge.
Earth work excavation in foundation in hard rock including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil etc., complete as directed by the site in-charge.
Laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level: (1:4:8) (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) including laying, curing etc., complete as directed by the site in charge.
Construction of Random rubble masonry with hard stone in foundation and with: Cement mortar (1:6) (1 cement: 6 coarse sand) including laying, curing etc., complete as directed by the site in-charge.
Construction of Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level in cement mortar (1:6) (1 cement: 6 coarse sand) including cost, conveyance of all materials, labour charges and GST etc., complete as directed by the site in charge.
Pointing to CR stone dwarf wall With cement mortar (1:2) Including cost, conveyance of all materials, labour charges and GST etc. complete as directed by the site in charge.
PCC (1:2:4) using 20mm HBG metal for providing coping to the dwarf wall all-round the site (of size 120x200m) as per the design to check the stray animals and for safety and security purpose of the site including cost, conveyance of all materials, labor charges for head loads, loading and un loading, conveyance charges, placing, curing charges of concrete, GST and other applicable taxes etc., complete as directed by the site in charge..
MS Grill fencing using 50X50X6mm. 'L' Angle as vertical post and Horizontal @equal intervals and 20mm. M S Square bar at 20 Cm. C/C., 20X5mm. MS Flat for design and fixing the grill in position with Cement Concrete 1:4:8, including Digging Pit of size 0.15 X 0.15 X 0.30 m.in Existing RR Masonry for fixing grill, Painting to M S Grill with approved Enamel Paint etc. including cost of materials, Labour charges and conveyance etc., complete as directed by the site in charge.
Laying new Granite/ Khandolite/ Sand stone flooring/ apron with neatly dressed stone of sizes varying from 90 to120cm of length, 45 to 60cm of width with a thickness not less than 10cm over a bed of brick jelly lime concrete (1:2:4) (1lime:2sand:4brick aggregate of size 20mm) of 100mm thick and laying in Lime mortar (1:2) and pointing the joints with same mortar and curing etc., complete as directed by the site in-charge.
Supply and fixing of the mild steel grill gate of size 4.00 x 1.50m at the entrance including cost and conveyance of all materials, all labour charges, cutting of mild steel angles and bars in to required sizes, assembling, welding, conveyance by head loads to the work spot and dressing, fixing in position over the dwarf wall to work spot from the main access road. (For outer frame - horizontals and verticals- L angles of 50x50x6mm size, Centre MS Flat of 40x5 mm size, 12mm square bars @10cm center to center for verticals between the frame) etc., complete as directed by the site in-charge.
Fixing double scaffolding system on the exterior side, up to three story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter etc., complete as directed by the site in-charge.
SRI SINDHU CONSTRUCTIONS (BID ID -3261416)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid