Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹1.8 L+₹12,883.40 (7.75%)Rejected-AOC PAYYANIL KARLATH HOUSE PAITHINIPARAMBA DOWN HILL P O MALAPPURAM | MALAPPURAM | MALAPPURAM | KERALA | L2 | Rejected-AOC Admitted | |
| 3 | L3₹1.9 L+₹20,168 (12.1%)Rejected-AOC MARATHAKAM PADAPPAKKARA P O KARIKUZHY | KARIKUZHY | THIRUVANANTHAPURAM | KERALA | 691503 | L3 | Rejected-AOC Admitted |
Tender Value
₹2.1 L
EMD Value
₹5,133
Closing Date
10 Feb 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/O Assistant Executive Engineer PWD ,Bridges subdivision Palakkad
GENERAL-Pulayanpara Bridge-Budget 2022- 2023 Investigation works to Pulayanpara Bridge at Km 2/400 of Kaikatti Pualayanpara Road in Nenmara LAC-Investigation Work
2023_PWD_555183_1
PWD/BR/TR/15132/2022_3_1_1/1
Open Tender
Civil Works - Bridges
Item Wise
120 days
Kaikatti Pualayanpara
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹5,133
Yes
11 Apr 2023
3 Feb 2023
15 Feb 2023
3 Feb 2023
10 Feb 2023
3 Feb 2023
Amount
Investigation Work
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
OD105674/2022-2023:Testing charges for CBR test of soil samples collected from the site in the laboratory including the charges of labour engaged for conducting the test in the lab etc including the collection for conducting the test in the lab etc including the collection of subgrade soil sample carefully by excavating pit for laboratory test and refilling back and compacting the excavated pit to lines and levels with excavated material as directed by the departmental officials
Road alignment
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
JAMSHAD NASEERI P.K
Lamanto T. Somervell
Bidder Name
JAMSHAD NASEERI P.K
Greeshma Nizy Eujine
Lamanto T. Somervell
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_815897.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .