Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAccepted-AOC | ₹38.4 L Quoted ₹32.3 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹33.0 LRejected-Finance | ₹33.0 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹36.3 LRejected-Finance | ₹36.3 L | L3 | Rejected-Finance L3 bidder |
| 4 | L3₹36.3 LRejected-Finance AT KANTAPAHADA P S PO BANKI GHOLAPUR DIST CUTTACK | ₹36.3 L | L3 | Rejected-Finance L3 bidder |
| 5 | L3₹36.3 LRejected-Finance | ₹36.3 L | L3 | Rejected-Finance L3 bidder |
Tender Value
₹36.7 L
EMD Value
₹36,659
Closing Date
4 Apr 2026, 5:00 pmClosed
PA ITDA, Phulbani
ITDA, Phulbani
Construction of PA quarter at Phulbani under Phulbani Block
2026_STSCD_127596_3
PA ITDA PLB 07 of 2025-26
Open Tender
Civil Works - Buildings
180 days
Office of the PA, ITDA, Phulbani
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹36,659
Yes
8 Jun 2026
26 Mar 2026
6 Apr 2026
26 Mar 2026
4 Apr 2026
26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation of Hard soil in foundation within 50m. initial lead and 1.50m. initial lift including rough dressing and breaking the clods to maximum 5cm. to 7cm. laying layers not exceeding 0.30m. in depth and as per direction of the Engineer-in-charge. | |||||
| 2Filling foundation and plinth with sand including watering and ramming including cost, conveyance and royality and taxes of all materials and labour with T&P required for the work etc. complete as per specification and direction of Engineer-in-Charge. | |||||
| 3Cement concrete in (1:4:8) using 40mm size Hard Granite hand Broken metal including watering and curing,cost,conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete and as per specification and direction of Engineer in Charge. | |||||
| 4Rigid smooth centering and shuttering for Mass concrete including dismantling them after csting including all cost, conveyance, taxes of materials and labour with T&P required for the work etc. A) Mass Concrete | |||||
| 5Fly Ash Brick Masonry work in C.M. (1:6) in F&P using 23cm x 11cm x 8cm size C.B. Brick including watering and curing, cost, conveyance,taxes and royalties and labour etc complete. | |||||
| 6RCC work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips incuding watering and curing etc. complete as per direction of Engineer-in charge. a) Columns Footing | |||||
| 6.01 | b) Plinth Beam | - | Cum | - | - |
| 6.02 | c) Columns | - | Cum | - | - |
| 6.03 | d) Lintel Bend | - | Cum | - | - |
| 6.04 | e) Chajja | - | Cum | - | - |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
Tendernotice_2.pdf
PDF • 1.43 MB
BOQ_586299.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid