Urgent Repairing and painting of Lighthouse Tower at Pirotan Island Lighthouse Station.
2024_DGLL_810082_1
CMDVTS-03015/1/2020-Maint
Open Tender
Civil Works
Works
30 days
Pirotan Island
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,900
Deep Bhavan Gandhidham
17 Sept 2024
5 Jun 2024
31 Jul 2024
5 Jun 2024
30 Jul 2024
5 Jun 2024
29 Jul 2024
Amount
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content.With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre,as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding /Boosam chair/ Jhoola,ropes, tools & plants and all other charges etc.complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade cleaning & preparing the surface good for painting, cleaning the painting spots after painting, removal and placing of all the items in existing position and as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding /Boosam chair/ Jhoola,ropes, tools & plants and all other charges etc.complete.Two or more coats on old work -Outerside surface of LH Tower.
Providing and applying white cement based putty of average thickness 01mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface,removing old paint,cleaning even and smooth complete.as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding,tools & plants and all other charges etc.complete. where ever necessary.
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content.With water thinnable cement primer on wall surface having VOC content less than 50 grams/litreas directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding, tools & plants and all other charges etc.complete.where ever necessary.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade cleaning & preparing the surface good for painting, cleaning the painting spots after painting, removal and placing of all the items in existing position and as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding /Boosam chair/ Jhoola,ropes, tools & plants and all other charges etc.complete.Two or more coats on old work -interior surface of LH Tower.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture, including the cost of all materials, labours, tools & plants , scaffolding etc., complete. Door and Window
Repair & Repcement of G I Hand Railing top of LH Tower including the cost of dismantling carefully, fixing, filling joints with silicon, cutting, welding, and all materials,labours, tools& plants, scaffolding lifting &shifting of hiegh rise tower, all other charges etc., complete.
Dismantling of old detorated verticle member
Providing and fixing the 40mm inner dia of GI pipe hand railing at top of LH tower.
Providing & Laying cement concrete in 1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate) for foundatoin of Hand Railing,LH tower slab, staicase and roofs having slope more than 15° up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement
Applying priming coat With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works, as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding, tools & plants and all other charges etc.complete.-Steel surface (Primer)
G I pipe hand railing at top of LH tower.
MS Ladder top of roof
Trape door of Lighthouse Tower
Foundatoin of LH Tower Hand Railing
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work, as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding, tools & plants and all other charges etc.complete.-Steel surface (paint)
G I pipe hand railing at top of LH tower.
MS Ladder top of roof
Trape door of Lighthouse Tower
Foundatoin of LH Tower Hand Railing
Repairs to patch plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineerin-Charge. With cement mortar 1:4 (1 cement : 4 fine sand) old Wall surface
For sealing cracks and faulty construction joints, routed out/making U-shape groove size 25x25mm and then primed the area with integral crystalline slurry @0.05kg/running metre and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50kg/running metre. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry @0.05kg/running metre per coat. including the cost of all materials, labours, tools & plants , scaffolding etc., complete.
Providing and fixing 30mm thick shutters for Window etc-Glazed shutters : Second class teak wood including ISI marked anodized aluminium butt hinges with necessary screws, as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding, tools & plants and all other charges etc.complete.
Dismantling carefully the existing broken glass panes 4mm thick of window shutters and replacing the same with 4mm thick ( Modi / saint Gobin) new glass panes horizontal/tinted fixed with teak wooden beedings 15 mm x 15mm, nails, at all heights, as directed & as described as per condition at site including the cost of all materials,labours, tools& plants, scaffolding and all other charges etc., complete.
Providing and fixing hardware fittings and specials of approved quality and brand or ISI make as per the following items including all labour, materials etc complete and specials should be of ISI make and approved quality. including the cost of all materials, labours, tools & plants etc., complete.
Replacement of 100 mm Brass hinges (heavy duty)
Replacement of 75mm Brass hinges (heavy duty)
Replacement of 250x10mm Brass tower bolts (heavy duty)
Replacement of 150x10mm Brass tower bolts (heavy duty)
Replacement of 125 mm Brass handle (heavy duty)
Replacement of 100 mm Brass handle (heavy duty)
Brass Eye Hook 150x6mm (heavy duty)
Rent charges for generator during the Civil construction work at pirotan island, as directed & as described as per condition at site including the cost of fuel charges, oprator, tools & plants etc., complete.
Rent charges of open plot at GMB Jetty at Jamnagar Bedi Port, As per notification no. GMB/T/SOPC/12(25) /2019/262 and revised Rates w.e.f.1st may 2022, Rent for open plot at Jamnagar Bedi port. Rs. 58.962/10Sqmt per month or part of thereof. (20mtrx20mtr plot area = 400Sqmtr x 02months = 800Sqmtr,) (The Govt of Gujarat Gazette Extraordinary Published by Authority Notification , no. GMB/T/SOPC/12(25) /2019/262 and revised Rates w.e.f.1st may-22 Attached ) 800Sqmx58.962/10Sqm = Rs.4716.96
Hire chrges for mechanised boat of 10MT Capacity with small boat for transportation of material,labur and department officials for supervison purpose,Boat approved from GMB department, including crew member, Safety Guard, Disel for to & fro all other charges from Bedi port to Pirtotan Per day In The High Tide By Boat including transportation of material from bedi port to pirotan island Lighthouse.(The boat has to be made available as per Tidal condition and in The Favurable reach the site) Time period of work is 01 months.
Supply of potable water for Civil work and drinking purpose including cost of matrials,Transporation by Boat from Bedi Port to Pirotan (island) sea shore . Filling the water in barrer, loading in boat at salaya port ,Unloading at Pirotan (island), including all other charges.as directed & as described as per condition at site including the cost of all materials, labours,safety belt, scaffolding, tools & plants and all other charges etc.complete.as directed & as described as per condition at site including the cost of all materials, labours,safety belt, tools & plants and all other charges etc.complete.
Harsh Infrastructure
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .