| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.2 L+₹3,694 (0.09%)Rejected-AOC NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹44.5 L+₹2.3 L (5.49%)Rejected-AOC 232 RAJENDRA NAGAR STREET 7 KAULAGARH ROAD DEHRADUN | L3 | Rejected-AOC L3 | |
| 4 | L4₹49.5 L+₹7.3 L (17.4%)Rejected-AOC DEHRADUN | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
19 May 2021, 5:00 pmClosed
Superintending Engineer,Contract and Procurement-I
VCV Gabar Singh Urja Bhawan
Construction of line for given 645KW(760KVA) Load to EE, Peyjal Nirman Nigam (Yantrik Sakha) Dehradun at site (Marod, Ubau, Kandoi and Bisoi) Nagthat Under 33/11KV S/S Nagthat Under EDSD, Dakpathar on semi turnkey basis
2021_UPCLC_32501_1
CCP-I/2/2021-2022
Open Tender
Electrical Works
Turn-key
90 days
As per tender specification
As per tender specification
6 documents required · 6 mandatory
₹5,900
Executive Engineer, ESD, UPCL
₹1.1 L
VCV Gabar Singh Urja Bhawan
8 Jun 2021
26 Apr 2021
20 May 2021
26 Apr 2021
19 May 2021
5 May 2021
28 Apr 2021
Amount
PP Clamp SP-23 With N&B
PP Clamp SP-33 With N&B
Stay Clamp SP-23 With N&B
Stay Clamp SP-33 With N&B
Earth wire clamp SP-23 pole with N&B
Earth wire clamp SP-33 pole with N&B
Top bracing clamp SP-23 pole with N&B
Bottom bracing clamp SP-23 pole with N&B
Top bracing clamp SP-33 pole with N&B
Bottom bracing clamp SP-33 pole with N&B
Description of Work / Item(s)
Amount
Carriage of material from store D.Dun to worksite including loading & unloading at both ends (0-150 km.)
(i) 11 KV VCB FDR 350/500 MVA 400/200/5A, 110 V AC
(ii) ST Pole SP-23
(iii) ST Pole SP-33
(iv) Stock materials
Head load carriage from road site to pit site (0 to3 km)
(i) 11 KV VCB FDR 350/500 MVA 400/200/5A, 110 V AC
(ii) ST Pole SP-23
(iii) ST Pole SP-33 (0 to 1 km)
(iv) Stock materials
Erection of single Pole SP-23 by excavation of pit of size 0.9x0.6xx1/6 th length of pole in mixed soil including grouting in size 0.45x0.45x1/9 th of support in CC ratio 1:4:8 with cost of grouting material & fixing all the accessories.
Erection of double Pole SP-23 by excavation of pit of size 0.9x0.6xx1/6 th length of pole in mixed soil including grouting in size 0.45x0.45x1/9 th of support in CC ratio 1:4:8 with cost of grouting material & fixing all the accessories.
Erection of double Pole SP-33 by excavation of pit of size 0.9x0.6xx1/6 th length of pole in mixed soil including grouting in size 0.45x0.45x1/9 th of support in CC ratio 1:4:8 with cost of grouting material & fixing all the accessories.
Erection of four Pole SP-23 by excavation of pit of size 0.9x0.6xx1/6 th length of pole in mixed soil including grouting in size 0.45x0.45x1/9 th of support in CC ratio 1:4:8 with cost of grouting material & fixing all the accessories.
Erection of four pole structure on ST pole SP-23 with fabrication & fixing of top channel/dropper channel & other fitting etc with construction of special plinth with cement, sariya & stone concrete foundation of size 5x3.5x3.5 mtr, the base of plinth of size 3.5x3.5 mtr constructed by using cement, concrete & sariya and the area between the walls(height 5 Mtr) constructed with stone & concrete top of the plingth made as above covered with linter of 3.5x3.5 mtr with sariya & cement
Muffing of SP 23/33 pole
Erection of stay set by excavation of pit size 0.6x0.6x1.2 mtr in all types of soil & back filling of pit with mud boulders including nozzling both ends with grouting of stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 including cost of grouting material.
Laying, sagging & stringing of ACSR rabbit conductor of 11 KV line circuit
Making section on double pole
Making section on four pole
Mounting & fixing of TPMO making complete connections
Mounting & fixing Fuse Set making complete connections
Digging of trench and laying of underground 11 KV XLPE cable 3x240 and 3x120 sq mm complete work
Fixing of Earth Rod complete work
Fixing of L/A set complete
Fabrication of MS Channel/ MS Angle
Route clearance by cutting of tree branches
T off connection complete 11 KV
Providing & fixing of danger board plates
Guarding of 11 KV line on road crossing
Painting of SP 23/33 pole
Jointing & fixing of 11 KV cable jointing kit I/D/O/D
Erection of 11 KV VCB in all respect
Installation of 11 KV metering cubical in all respect making all connections
Loading/unloading of LT PRMC including carriage
Construction of mtetering room for metering cubical at S/s end including cost of building material and cost of gate(15x15)''= 225 Sq feet
Chemical earthing of new installed VCB & 11 KV double pole structure at yard
MS SHYAM SINGH
P M ELECTRICAL COMPANY
PARTH POWER COMPANY
M/s Jai Bhadraj Electricals
MS SHYAM SINGH
PARTH POWER COMPANY
M/s Jai Bhadraj Electricals
P M ELECTRICAL COMPANY
PARTH POWER COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .