Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 CrAccepted-AOC F A ROAD KUMARPARA PANCHALI KUMARPARA GUWAHATI PIN 781001 | KAMRUP METRO | ASSAM | 781001 | ₹16.5 Cr | L1 | Accepted-AOC Lowest rate quoted |
| 2 | L2₹39 CrRejected-Finance | ₹39 Cr | L2 | Rejected-Finance High rate quoted |
| 3 | Rejected-Technical P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
Refer Docs
EMD Value
₹9.3 L
Closing Date
16 May 2023, 6:00 pmClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl , Mizoram
SSI, DESIGN INCLG PROOF CHECKING AND CONSTN OF MAJ PMT BRIDGE OF SPAN 75 M OVER TUISA RIVER AT KM 22.50 ON RD K-V-K WITH STEEL SUPERSTRUCTURE (THROUGH TYPE) ON WELL FDN UNDER 71 RCC/ 24 BRTF UNDER PROJECT PUSHPAK IN MIZORAM STATE (2ND CALL)
2023_BRO_587907_1
NIT-25 OF 2022-23
Open Tender
Civil Works
730 days
KM 22.500 ON KVK ROAD
As per Tender document
8 documents required · 8 mandatory
₹0
₹9.3 L
Yes
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl , M
5 Sept 2023
31 Mar 2023
18 May 2023
31 Mar 2023
16 May 2023
15 Apr 2023
1 Apr 2023 - 14 Apr 2023
8 Apr 2023
Amount
SSI, Design and proof checking and construction of 75.00 m Single span Major Pmt bridge with Steel Truss Superstructure (Through type) on well foundation over Tuisa River at Km 22.50 on Khaungphah-New Vaikhawtlang-Kawlebem Road under 71RCC / 24BRTF Project Pushpak in Mizoram State with span arrangement as per NIT Drg and based on hydraulic data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, return wall, placing of bearings, Fabrication and erection of steel truss (through type) superstructure, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, foot paths, kerbs, RCC hand rails, RCC Crash barrier, drainage spout, approach slab protective works ,Painting, back filling behind abutments, temporary river training works and diversion and all other items of works required for the completion of the bridge including curing and load testing.
Gammon Engineers and Contractors Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid