Tender Value
₹38.2 L
EMD Value
₹76,360
Closing Date
19 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DFO Special Forest Division Tangmarg
Office of the Divisional Forest Officer Special Forest Division Tangmarg, Kashmir, Jammu and Kashmir
Construction of Forest Check Post at Hanjiwera Pattan. Special Forest Division Tangmarg.
2026_FD_327465_2
e-NIT NO 11 OF 2026-27 (Tangmarg Forest Division)
Open Tender
Civil Works
Percentage
700 days
Tangmarg
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Centralized Pooling Account No. 0110010200001102
₹76,360
8 Oct 2026
8 Oct 2026
21 Oct 2026
8 Oct 2026
19 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 129.89 | CUM | 479.3 | ₹62,256.28 |
| 2 | Providing & laying dry stone solling, sand/dust including ramming, dressing etc complete in foundations and under floors, including Mech. Carriage & Head load charges up to site of work complete. | 62.56 | CUM | 1,000 | ₹62,560 |
| 3 | Providing & laying in position cement concrete (1cement: 4 coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. All work upto plinth level. | 13.57 | CUM | 5,202.9 | ₹70,603.35 |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work for. Foundations, footings, bases of columns etc. | 92.7 | SM | 286.35 | ₹26,544.65 |
| 5 | Centering and shuttering including strutting, propping etc and removal of form work for. Columns, pillars, piers, abutments, posts and struts. | 43.45 | SM | 742.55 | ₹32,263.8 |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work for. Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 300.88 | SM | 577.55 | ₹1,73,773.24 |
| 7 | RCC Plinth Beam | - | - | - | - |
| 8 | RCC Beam under slab connecting all Columns. Tie Beam | - | - | - | - |
| 9 | Centering and shuttering including strutting, propping etc and removal of form work for. Suspended Floors | 114.78 | SM | 718.2 | ₹82,435 |
| 10 | Centering and shuttering including strutting, propping etc and removal of form work for. Edges of Slabs | 44.82 | RM | 262.2 | ₹11,751.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_1107894.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .