| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹18.0 L+₹67,009.38 (3.87%)Rejected-Finance 33 6 NIRMAL VIHAR 134003 | AMBALA | AMBALA | HARYANA | 134003 | L2 | Rejected-Finance Highest | |
| 3 | L3₹18.9 L+₹1.6 L (9.24%)Rejected-Finance 256 16 MODEL TOWN 125033 | HISAR | HARYANA | 125033 | L3 | Rejected-Finance Highest | |
| 4 | L4₹19.7 L+₹2.4 L (13.8%)Rejected-Finance 147 A GOBIND NAGAR 133001 | AMBALA | AMBALA | HARYANA | 133001 | L4 | Rejected-Finance Highest |
Tender Value
₹18.9 L
EMD Value
₹38,000
Closing Date
18 Feb 2022, 5:00 pmClosed
Raj Kumar
Executive Engineer, Provl.Divn. No.1, PWD B and R Br. Ambala Cantt.
Construction of Oxygen Gas Plant in the Campus of Civil Hospital at Ambala City in Ambala District
2022_HRY_207984_1
PWD/AMB/AMB-1/110153
Open Tender
Construction Works
Works
60 days
Ambala Cantt.
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹38,000
Yes
3 Apr 2022
12 Feb 2022
18 Feb 2022
12 Feb 2022
18 Feb 2022
12 Feb 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. (HSR 4.12.1) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, cum plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m..(HSR 4.32)
Excavating, supplying and filling of local earth (including royalty) cum by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.(HSR 4.33)
Cement Concrete 1:8:16 with stone aggregate 40 mm size in cum foundation and plinth.(HSR 10.100.2)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: (HSR 6.1.6) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for (HSR 6.30.1) Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level : (HSR 6.14.1) 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: (HSR 7.21.2) Cement Mortar 1:6 (1 cement: 6 coarse sand).
Providing and laying damp-proof course with cement concrete 1 :2:4 (1 cement : 2 coarse sand (zone-Ill): 4 graded stone aggregate 12.5mm nominal size) (HSR 6.8.1) 50 mm thick
Providing and laying of screed of 50 mm thick cement concrete 1 :8:16 to be laid below the topping. (HSR 10.4)
Providing and laying of conglomerate floor 50mm thick cement concrete topping 1 :2:4 (HSR 10.7)
Centering and shuttering including strutting, propping etc. and removal of form for (HSR 6.30.5) Lintels, beams, plinth beams, girders, bressumers and cantilevers First storey
Centering and shuttering including strutting, propping etc. and removal of form for (HSR 6.30.6) Columns, Pillars, Piers, Abutments, Posts and Struts First storey
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : (HSR 6.15.1) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 cum graded stone aggregate 20 mm nominal size) First storey
Reinforced cement concrete work in beams, suspended floors roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size). (HSR 6.16) First storey
Providing and fixing Hi, Rib profiled sheets 0.60mm TT (Total Thickness) only± 0.2mm tolerance allowed) Hi Tensile galvalume/Zincalume steel sheet of the approved make having a hot dip metallic Zinc-Aluminium alloy (AZ-150) coating of minimum (150 gms/sqm) with 550 Mpa yield strength of approved blue colour (RAL-5012) the colour coating shall be as per IS 15965 of SMP or Super Durable Polyester Paint XRW fixed with hex head self-drilling screw sloping roof without curvature as per approved specification, drawing and design. (HSR 9.31)
Plastering on walls12 mm cement plaster of mix 1 :4 (1 cement: 4 fine sand) : (HSR 11.5.3) First storey
Plastering on walls 15 mm cement plaster on the rough side of single or half brick wall of mix 1 :6 (1 cement: 6 fine sand) : (HSR 11.6.2) First storey
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. (HSR 11.78)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade: (HSR 11.64.1) New work (two or more coats) over and including water thinnable priming coat with cement primer
Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gmnitre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. (HSR 11.98.1) New work (Two or more coats applied@ 1.43 litre/ 10 sqm Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm
Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete (HSR 11.58)
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. (HSR 13.30.2) Hot finished seamless type tubes.
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 6.34.6) Thermo-Mechanically Treated bars of grade Fe-500D or more.
M S Raj Associates
JAGDEEP SINGH
HARISH CHANDER
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .