| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-Finance | L1 | Accepted-Finance RESPONSIVE | |
| 2 | L2₹7.9 L+₹1.2 L (17.9%)Accepted-Finance | L2 | Accepted-Finance RESPONSIVE | |
| 3 | L3₹8.1 L+₹1.4 L (21.2%)Accepted-Finance | L3 | Accepted-Finance RESPONSIVE | |
| 4 | L4₹9.7 L+₹3.0 L (45.4%)Accepted-Finance | L4 | Accepted-Finance RESPONSIVE |
Tender Value
₹10.5 L
EMD Value
₹21,000
Closing Date
3 May 2024, 4:00 pmClosed
Ex Engineer ED-Ganderbal
Office of the Ex Engineer ED-Ganderbal BEEHAMA
Renovation of 6 Nos Substation Structure for SANJY-2024
2024_PDD_248129_1
EDG-024 OF 2024-25
Open Tender
Electrical Works
Lump-sum
15 days
GANDERBAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
Ex Engineer ED-Ganderbal
₹21,000
Yes
16 May 2024
19 Apr 2024
4 May 2024
19 Apr 2024
3 May 2024
19 Apr 2024
19 Apr 2024 - 20 Apr 2024
3 No. sub station earthing by way of Excavation of Earthing Pit of Dia 650mm Dept 3000mm and instllation of GI Pipe 40 mm or GI Rod 20mm, 2.5 mtr long as per IS 1239 through GI Strip of 50X6 mm 1 no for neutral earthing and 25X3 mm 2 nos (for 2 transformer body earth, two no. pole earth, 1 no. LA Earth and 1 no. GO handle earth). Note: For LA Earth 1 pipe shall be kept separate as per IS Standard 2629/85 GI Nuts & Bolts refilling with Earth enhancement materials and earthe Chamber made of Brick Massionary with RCC Slab COver (Distribution Sub Station)
Providing and fixing of GI Channel cross-arm (100 x 50x6mm) / 75x40x40 x6mm including back clamps of 50X8 mm for fixing Cross arm and pole top bracket .
Supply, Installation, Testing and Commissioning of Un Armoured Single Core XPLE, FRLS Cable (300mm2 Havells/Polycab/Gloster or equivalent make including Al lugs of sizes..
Supply, Installation, Testing and Commissioning of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type
Supply, Installation, Testing and Commissioning of 11 kV, G.O AB Switch , 3-phase, 200A
Supply, Installation, Testing and Commissioning of 11 kV Horn, Gap Fuse 3-phase 100A
Providing and fixing of LT Distribution Box for 63 kVA DTR with 100 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits
Providing and fixing of LT Distribution Box for 100KVA DTR with 160 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits
Supply, Installation, Testing & Commissioning of DLMS Complaint HT Tri Vector Meter (Secure / LNT / or Equivalant) with CT/PT Unit (AE / Everest or equivalent) of 0.5 Accuracy class (IS 14697 ammended upto date) inside separate LV & HV Box to Cubic Cell (IS5133) alongwith all accessories and modem. The CT ratio shall be 150-75/5 for 1 MVA DT
Supply, Installation, Testing & Commissioning of 3 Core 11 kV Aluminium cable XLPE armoured 35 mm2 including cost of clamp for its fixing where ever required.
Supply, Installation, Testing & Commissioning of Cable termination kits suitable for 3 x 35 mm2 XLPE Cable (Indoor/Outdoor)
Supply, Installation, Testing & Commissioning of Earthing by way of 40 mm GI Pipe earthing . Job includes , excavation, enhancement materail and Main Hole Chamber (500x450x600)mm with frame and cover
Supply, Installation, Testing & Commissioning of Supply, Installation, Testing and Commissioning of Aluminium Thimbles of Sizes
M/S Labelle Prop. Shabir Ahmad Bhat
M/S JAZ TRADERS
mir aamir nazir
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .