| Sl No | Description | Qty | Unit | RAJARSHEE DEY L1 |
|---|---|---|---|---|
| 1.00Fabrication & Installation of Target Poles and Sal Wooden Gauge Post for Hydrological Observation sites: | ||||
| 1.01 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto 1.5 m. All kinds of soil | 438.75 | Sq.m. | 500 ₹2.2 L |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains(Not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms,lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m, as directed by Engineer-in-charge.All kinds of soil. | 86.23 | Cu.m. | 500 ₹43,115 |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for: foundation, footings, bases for column. | 306.72 | Sq.m. | 500 ₹1.5 L |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level; 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 16.99 | Cu.m. | 7,000 ₹1.2 L |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level; 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 47.16 | Cu.m. | 10,000 ₹4.7 L |
| 1.06 | Seasoned sal wood gauge post of size 20cm x10cm (two side tapered in 5cm length) - 2.30m long.
Cross sectional area of wooden gauge post =(0.10*0.10)+2(1/2*0.10*0.05)=0.015 sq.m. | 6.11 | Cu.m. | 1,78,000 ₹10.9 L |
| 1.07 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,155.1 | kg. | 150 ₹1.7 L |
| 1.08 | 12 mm cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement : 3 fine sand). | 126.44 | Sq.m. | 190 ₹24,023.60 |
| 1.09 | Painting on gauge Post/target post with synthetic enamel of approved brand & manufacture to give an even shade by two or more coat and Marking the gauge posts with japan paint Red, Black & White with standard metric gradation marking of 10 mm thickness in black & white alternately & red synthetic enamel of width 10 mm at every 100 mm etc complete.(Marking done as per the instructions of site engineer) | 320.03 | Sq.m. | 145 ₹46,404.35 |
Tender Value
Refer Docs
EMD Value
₹47,400
Closing Date
26 Nov 2025, 4:00 pmClosed
Executive Engineer, Meghna Diovision, CWC, Silchar
O/o the Executive Engineer, Meghna Diovision, CWC, Silchar.
e-Tender for fabrication and installation of Target Poles and Sal Wooden Gauge Posts for Hydrological Observation sites of Meghna Sub-Division-III, CWC, Silchar under Meghna Division, CWC, Silchar.
2025_CWC_886200_1
MD/SIL/JE/HQ/08/2025/874-80
Open Tender
Civil Works - Others
60 days
Silchar
As per the NIT documents
3 documents required · 3 mandatory
₹0
₹47,400
29 Dec 2025
19 Nov 2025
27 Nov 2025
19 Nov 2025
26 Nov 2025
19 Nov 2025
Amount
Fabrication & Installation of Target Poles and Sal Wooden Gauge Post for Hydrological Observation sites:
Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto 1.5 m. All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains(Not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms,lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m, as directed by Engineer-in-charge.All kinds of soil.
Centering and shuttering including strutting, propping etc. and removal of form for: foundation, footings, bases for column.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level; 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level; 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Seasoned sal wood gauge post of size 20cm x10cm (two side tapered in 5cm length) - 2.30m long. Cross sectional area of wooden gauge post =(0.10*0.10)+2(1/2*0.10*0.05)=0.015 sq.m.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
12 mm cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement : 3 fine sand).
Painting on gauge Post/target post with synthetic enamel of approved brand & manufacture to give an even shade by two or more coat and Marking the gauge posts with japan paint Red, Black & White with standard metric gradation marking of 10 mm thickness in black & white alternately & red synthetic enamel of width 10 mm at every 100 mm etc complete.(Marking done as per the instructions of site engineer)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.78 MB
Tender Documents
Tender Documents • 2.25 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid