Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹14.8 L
Closing Date
12 Apr 2022, 10:30 amClosed
AGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
COMPREHENSIVE OFFLOADING FOR REFIT OF SULLAGE BARGE 2 AND SULLAGE BARGE 3
2022_NAVY_515944_1
DYT/YCS/21-22/106A/PL-IN/ SULLAGE BARGE II III/340
Open Tender
Marine Services
90 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14.8 L
Yes
NAVAL DOCKYARD MUMBAI
15 Jun 2022
31 Mar 2022
13 Apr 2022
31 Mar 2022
12 Apr 2022
6 Apr 2022
6 Apr 2022
Amount
SOW FOR SULLAGE BARGE 2 :- UTG READING TO BE TAKEN AND STEELS TO BE RENEWED BASED ON UTG READING AND SURVEYOR'S RECOMMENDATIONS AT (I) 1000 POINT ON U/W AREA INCLUDING BOOT TOPPING. (II) 600 POINT AT ENTIRE SHIP SIDE. (III) 600 POINT ON SUPERSTRUCTURE. AND (IV) 600 POINT ON WEATHER DECK AND 01 DECK. SERVICE COST.
UTG READING TO BE TAKEN AND STEELS TO BE RENEWED BASED ON UTG READING AND SURVEYOR'S RECOMMENDATIONS AT (I) 1000 POINT ON U/W AREA INCLUDING BOOT TOPPING. (II) 600 POINT AT ENTIRE SHIP SIDE. (III) 600 POINT ON SUPERSTRUCTURE. AND (IV) 600 POINT ON WEATHER DECK AND 01 DECK. MATERIAL COST.
STEEL RENEWAL- STEEL PLATE IS 2062 GRADE 'B' THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. SERVICE COST
STEEL RENEWAL- STEEL PLATE IS 2062 GRADE 'B' THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. MATERIAL COST
STEEL RENEWAL (STEEL PLATE IS 2062- GRADE ‘B’) - (I) SOLID MS ROD 30 MM OD (L - 50 M). (II) PIPE COAMING GI PIPE 65 MM OD (L - 30 M). (III) HALF ROUND SOLID BAR CARGO HATCH COAMING 80MM OD (L - 50 M). SERVICE COST.
STEEL RENEWAL (STEEL PLATE IS 2062- GRADE ‘B’) - (I) SOLID MS ROD 30 MM OD (L - 50 M). (II) PIPE COAMING GI PIPE 65 MM OD (L - 30 M). (III) HALF ROUND SOLID BAR CARGO HATCH COAMING 80MM OD (L - 50 M). MATERIAL COST.
RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 100X75X10 MM - MAT- IS 2062 GRADE 'A'. SERVICE COST
RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 100X75X10 MM - MAT- IS 2062 GRADE 'A'. MATERIAL COST
RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 250X100X8 MM. MAT - IS 2062 GRADE 'A'. SERVICE COST
RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 250X100X8 MM. MAT - IS 2062 GRADE 'A'. MATERIAL COST
RENEWAL OF T BAR STRUCTURAL STIFFENERS 220X100X8 MM. MAT - IS 2062 GRADE 'A'. SERVICE COST
RENEWAL OF T BAR STRUCTURAL STIFFENERS 220X100X8 MM. MAT - IS 2062 GRADE 'A'. MATERIAL COST
STEEL RENEWAL STRUCTURAL STIFFENERS: 'I' BEAM 100X200X100X8 MM. SERVICE COST.
STEEL RENEWAL STRUCTURAL STIFFENERS: 'I' BEAM 100X200X100X8 MM. MATERIAL COST.
PITS BUILD UP AT VARIOUS U/W AND A/W HULL AND DECKS LOCATIONS AS PER SURVEY REPORT. 1 PITS = 1 SQCM. SERVICE COST.
PITS BUILD UP AT VARIOUS U/W AND A/W HULL AND DECKS LOCATIONS AS PER SURVEY REPORT. 1 PITS = 1 SQCM. MATERIAL COST.
FOLLOWING SACRIFICIAL ANODES TO BE RENEWED (TO BE SUPPLIED BY VENDOR):- (I) 14 NOS MK-I AND (II) 06 NOS MK-VI. NOTE: SACRIFICIAL ANODE SHOULD CONFORM TO NCD 3906/3907. SACRIFICIAL ANODES TO BE SUPPLIED BY VENDOR AND BROUGHT FROM IHQ MOD(N) APPROVED VENDORS. SERVICE COST.
FOLLOWING SACRIFICIAL ANODES TO BE RENEWED (TO BE SUPPLIED BY VENDOR):- (I) 14 NOS MK-I AND (II) 06 NOS MK-VI. NOTE: SACRIFICIAL ANODE SHOULD CONFORM TO NCD 3906/3907. SACRIFICIAL ANODES TO BE SUPPLIED BY VENDOR AND BROUGHT FROM IHQ MOD(N) APPROVED VENDORS. MATERIAL COST
DRAUGHT MARKS TO BE RENEWED AND PAINTED. SERVICE COST.
DRAUGHT MARKS TO BE RENEWED AND PAINTED. MATERIAL COST
REMOVE / DISCONNECT TWO IN NO. ANCHORS / SHACKLES / ASSOCIATED FITTINGS FROM CHAIN CABLE. CHIP / CLEAN, PREPARE FOR SURVEY AND PAINT AS PER APPROVED PAINT SCHEME. SURVEY BY INSPECTIGN AGENCY. CONNECT UP ON COMPLETION (SIZE OF CHAIN CABLE 17.5 MM DIA, TOTAL LENGTH 274 M). SERVICE COST
REMOVE / DISCONNECT TWO IN NO. ANCHORS / SHACKLES / ASSOCIATED FITTINGS FROM CHAIN CABLE. CHIP / CLEAN, PREPARE FOR SURVEY AND PAINT AS PER APPROVED PAINT SCHEME. SURVEY BY INSPECTIGN AGENCY. CONNECT UP ON COMPLETION (SIZE OF CHAIN CABLE 17.5 MM DIA, TOTAL LENGTH 274 M). MATERIAL COST
REMOVE ANCHOR WINDLASS WITH MOTOR AND CARRY OUT OVERHAUL, RENEW MS FOUNDATION OF WINCH AND STOPPER, WINDLASS SIDE PLATES, BRAKE LINERS AND BOTH OPERATING HANDLES. PROVE WINDLASS UP TO SATISFACTORY LEVEL. SERVICE COST.
REMOVE ANCHOR WINDLASS WITH MOTOR AND CARRY OUT OVERHAUL, RENEW MS FOUNDATION OF WINCH AND STOPPER, WINDLASS SIDE PLATES, BRAKE LINERS AND BOTH OPERATING HANDLES. PROVE WINDLASS UP TO SATISFACTORY LEVEL. MATERIAL COST
GRP BOXES FOR SECURING FIRE HOSES OF SIZE 60X60X15 CM TO BE RENEWED AND SECURED WITH NUTS AND BOLTS ON THE SECURING BRACKETS. SECURING BRACKETS OF 2 IN X 2 IN ANGLE BAR CORRODED / THINNED TO BE RENEWED. SERVICE COST.
GRP BOXES FOR SECURING FIRE HOSES OF SIZE 60X60X15 CM TO BE RENEWED AND SECURED WITH NUTS AND BOLTS ON THE SECURING BRACKETS. SECURING BRACKETS OF 2 IN X 2 IN ANGLE BAR CORRODED / THINNED TO BE RENEWED. MATERIAL COST
CANVAS COVERS OF COMPRESSOR (1.5 MTR X 1 MTR X 1MTR), CONTROL STAND (1.5 MTR X 1 MTR X 1MTR), WINDLASS (1 MTR X 1 MTR X 1 MTR), TOWING ROPE REEL (1.5 MTR X 1.5 MTR X 1 MTR) AND CAPSTAN (1 MTR X 1 MTR X1 MTR) PERISHED. TO BE RENEWED AS PER SAMPLE. MAT-PVC COATED NYLON FABRIC. SERVICE COST
CANVAS COVERS OF COMPRESSOR (1.5 MTR X 1 MTR X 1MTR), CONTROL STAND (1.5 MTR X 1 MTR X 1MTR), WINDLASS (1 MTR X 1 MTR X 1 MTR), TOWING ROPE REEL (1.5 MTR X 1.5 MTR X 1 MTR) AND CAPSTAN (1 MTR X 1 MTR X1 MTR) PERISHED. TO BE RENEWED AS PER SAMPLE. MAT-PVC COATED NYLON FABRIC. MATERIAL COST
RENEW MS ANGLE BAR VERTICAL LADDERS. MAT-MS ANGLE BAR OF 75X75X10, MM LENGTH-22 FT AND 50 CM WIDE AND RUNGS PLACED AT 01 FOOT DISTANCE. SERVICE COST
RENEW MS ANGLE BAR VERTICAL LADDERS. MAT-MS ANGLE BAR OF 75X75X10, MM LENGTH-22 FT AND 50 CM WIDE AND RUNGS PLACED AT 01 FOOT DISTANCE. MATERIAL COST
COMPLETE OVERHAULING OF STP (MAKE - EVAC OY) INCLUDING PUMPS TO BE UNDERTAKEN AND FITMENT OF FIXED H2S SENSOR AS PER LATEST IHQ MOD POLICIES. SERVICE COST
COMPLETE OVERHAULING OF STP (MAKE - EVAC OY) INCLUDING PUMPS TO BE UNDERTAKEN AND FITMENT OF FIXED H2S SENSOR AS PER LATEST IHQ MOD POLICIES. MATERIAL COST
MUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED. SPINDLE TO BE RENEWED. SERVICE COST
MUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED. SPINDLE TO BE RENEWED. MATERIAL COST
RENEW 02 IN NOS WOODEN NAME BOARD OF CRAFT WITH MARINE PLY WITH BEADING AND PAINTED BLACK IN COLOUR. NAME LETTERS OF STAINLESS STEEL TO BE MADE AND FIXED ON BOARD. APPROX SIZE OF BOARD- 5FT X 4FT LETTERING SIZE APPROX 08 INCHES. SERVICE COST.
RENEW 02 IN NOS WOODEN NAME BOARD OF CRAFT WITH MARINE PLY WITH BEADING AND PAINTED BLACK IN COLOUR. NAME LETTERS OF STAINLESS STEEL TO BE MADE AND FIXED ON BOARD. APPROX SIZE OF BOARD- 5FT X 4FT LETTERING SIZE APPROX 08 INCHES. MATERIAL COST
01 WATER COOLER ALONG WITH AQUAGUARD WATER PURIFIER TO BE REPLACED WITH 120 LTRS COOLER WITH AQUAGUARD. FOUNDATION OF WATER COOLER IN GALLEY PERISHED. TO BE RENEWED WITH MS ANGLE BAR OF 1" X 1". WATER PIPES OF AQUAGUARD TO BE CONNECTED AND OUTLET TO BE CONNECTED TO COOLER WITH TWO ISOLATING VALVES. SIZE 1/2" GI PIPE. APPROX LENGTH-08 M. SERVICE COST.
01 WATER COOLER ALONG WITH AQUAGUARD WATER PURIFIER TO BE REPLACED WITH 120 LTRS COOLER WITH AQUAGUARD. FOUNDATION OF WATER COOLER IN GALLEY PERISHED. TO BE RENEWED WITH MS ANGLE BAR OF 1" X 1". WATER PIPES OF AQUAGUARD TO BE CONNECTED AND OUTLET TO BE CONNECTED TO COOLER WITH TWO ISOLATING VALVES. SIZE 1/2" GI PIPE. APPROX LENGTH-08 M. MATERIAL COST
RENEW 02 GREASE FILTERS OF GALLEY. MAT- BRASS WIRE MESH. SIZE- 60 CM X 40 CM. SERVICE COST.
RENEW 02 GREASE FILTERS OF GALLEY. MAT- BRASS WIRE MESH. SIZE- 60 CM X 40 CM. MATERIAL COST
WT HATCHES INCLUDING RUBBER BEADING AND BUTTERFLY NUTS CORRODED AND PERISHED. TO BE OVERHAULED. STRUCTURAL REPAIRS ALONG WITH RETAINER CLIP TO BE UNDERTAKEN AND RUBBER BEADING TO BE RENEWED. SIZE- 750 X 750 MM. CHALK TEST TO BE PROVED ON COMPLETION OF REPAIR. SERVICE COST.
WT HATCHES INCLUDING RUBBER BEADING AND BUTTERFLY NUTS CORRODED AND PERISHED. TO BE OVERHAULED. STRUCTURAL REPAIRS ALONG WITH RETAINER CLIP TO BE UNDERTAKEN AND RUBBER BEADING TO BE RENEWED. SIZE- 750 X 750 MM. CHALK TEST TO BE PROVED ON COMPLETION OF REPAIR. MATERIAL COST
RENEW NON WT DOORS INCLUDING SUNMICA AND LOCKS. SERVICE COST
RENEW NON WT DOORS INCLUDING SUNMICA AND LOCKS. MATERIAL COST
RENEW WT DOORS WITH HANDLES AND RUBBER BEADING. SERVICE COST
RENEW WT DOORS WITH HANDLES AND RUBBER BEADING. MATERIAL COST
RENEW MS BRACKETS/ CLAMPS FOR SECURING FIRE EXTINGUISHERS IN WHEEL HOUSE AS PER SAMPLE. SERVICE COST
RENEW MS BRACKETS/ CLAMPS FOR SECURING FIRE EXTINGUISHERS IN WHEEL HOUSE AS PER SAMPLE. MATERIAL COST
SEA CHEST GRATINGS TO BE OPENED. MUD BOX / SEA TUBE (MAT - MS) TO BE CHIPPED, CLEANED, REPAIRED. ANODE TO BE RENEWED INSIDE MUD BOX / SEA TUBE AND PAINTED WITH APPROVED PAINT SCHEME. SERVICE COST
SEA CHEST GRATINGS TO BE OPENED. MUD BOX / SEA TUBE (MAT - MS) TO BE CHIPPED, CLEANED, REPAIRED. ANODE TO BE RENEWED INSIDE MUD BOX / SEA TUBE AND PAINTED WITH APPROVED PAINT SCHEME. MATERIAL COST
RENEW SS W/C WITH FOUNDATION/ S TRAP / SOIL PIPE (MAT MS, DIA 100 MM, APPROX LENGTH-5MM) AND 01 OVER BOARD DISCHARGE VALVE AS PER SAMPLE. SERVICE COST.
RENEW SS W/C WITH FOUNDATION/ S TRAP / SOIL PIPE (MAT MS, DIA 100 MM, APPROX LENGTH-5MM) AND 01 OVER BOARD DISCHARGE VALVE AS PER SAMPLE. MATERIAL COST
RENEW CANVAS COVERS OF LIFE BUOYS AND PAINT WITH CRAFT NAME. SERVICE COST
RENEW CANVAS COVERS OF LIFE BUOYS AND PAINT WITH CRAFT NAME. MATERIAL COST
RENEW 01 FLUSHING PIPE WITH 01 NO FLUSHING VALVE OF SIZE - 30MM, MAT-GI APPROX LENGTH - 5 MM. SERVICE COST
RENEW 01 FLUSHING PIPE WITH 01 NO FLUSHING VALVE OF SIZE - 30MM, MAT-GI APPROX LENGTH - 5 MM. MATERIAL COST
RENEW FIXED GUARDRAILS WITH STANCHIONS ON WEATHER DECK, WHEEL HOUSE AND WHEEL HOUSE TOP DECK, PIPA DIA - 65 NB, (MS) APPROX RUNNING LENGTH - 100M. SERVICE COST
RENEW FIXED GUARDRAILS WITH STANCHIONS ON WEATHER DECK, WHEEL HOUSE AND WHEEL HOUSE TOP DECK, PIPA DIA - 65 NB, (MS) APPROX RUNNING LENGTH - 100M. MATERIAL COST
RENEW MS CHAIN ON NO 1 DECK, WHEEL HOUSE TOP DECK ASSOCIATED WITH GUARDRAIL STANCHIONS. SERVICE COST
RENEW MS CHAIN ON NO 1 DECK, WHEEL HOUSE TOP DECK ASSOCIATED WITH GUARDRAIL STANCHIONS. MATERIAL COST
RENEW MS LIFE RAFT STAND FOR SECURING LIFE RAFT. SERVICE COST
RENEW MS LIFE RAFT STAND FOR SECURING LIFE RAFT. MATERIAL COST
RENEW BREATHER PIPE INCLUDING GOOSE NECK ( DIA OF PIPE 50MM, MAT GI). SERVICE COST
RENEW BREATHER PIPE INCLUDING GOOSE NECK ( DIA OF PIPE 50MM, MAT GI). MATERIAL COST
RENEW MS VENTILATION SUPPLY AND EXHAUST TRUNK INCLUDING WIRE MESH ON UPPER DECK. SERVICE COST
RENEW MS VENTILATION SUPPLY AND EXHAUST TRUNK INCLUDING WIRE MESH ON UPPER DECK. MATERIAL COST
REPAIR MANHOLE DOOR COVER OF TANKS AND VOID SPACE INCLUDING SECURING STUDS / NUT BOLTS AND RUBBER JOINTS. RENEW RUBBER JOINTS. SERVICE COST.
REPAIR MANHOLE DOOR COVER OF TANKS AND VOID SPACE INCLUDING SECURING STUDS / NUT BOLTS AND RUBBER JOINTS. RENEW RUBBER JOINTS. MATERIAL COST
MATTRESS OF CREW MESS, MASTER CABIN, ENGINEER CABIN TO BE RENEWED WITH KURL-ON MAKE MATTRESS AND CLOTH COVERS OF FIRE RETARDANT MATERIAL. SIZE 2.5 x 6 FT EACH. SERVICE COST
MATTRESS OF CREW MESS, MASTER CABIN, ENGINEER CABIN TO BE RENEWED WITH KURL-ON MAKE MATTRESS AND CLOTH COVERS OF FIRE RETARDANT MATERIAL. SIZE 2.5 x 6 FT EACH. MATERIAL COST
REPLACE CHAIRS AND UPHOLSTERY OF CABINS WITH ISI STANDARD MAKE. SERVICE COST
REPLACE CHAIRS AND UPHOLSTERY OF CABINS WITH ISI STANDARD MAKE. MATERIAL COST
TYRE FENDERS TO BE RENEWED AND SECURED WITH CHAIN CABLE OF 32 INCH DIA AND LENGTH 2 M EACH. SERVICE COST
TYRE FENDERS TO BE RENEWED AND SECURED WITH CHAIN CABLE OF 32 INCH DIA AND LENGTH 2 M EACH. MATERIAL COST
CORRUGATED GI SHEET ON FOXLE AND QUATER DECK TO BE RENEWED WITH CORRUGATED PVC AND SECURED WITH J-BOLTS. SERVICE COST
CORRUGATED GI SHEET ON FOXLE AND QUATER DECK TO BE RENEWED WITH CORRUGATED PVC AND SECURED WITH J-BOLTS. MATERIAL COST
RENEW DECK EYES AS PER IS 6203. SERVICE COST
RENEW DECK EYES AS PER IS 6203. MATERIAL COST
RENEW CREW MESS LOCKERS LOCK. SERVICE COST.
RENEW CREW MESS LOCKERS LOCK. MATERIAL COST
DECK COVERING IN MASTER CABIN, ACCOMMODATION SPACE, WHEEL HOUSE AND CREW BATHROOM CRACKED TO BE RENEWED WITH IHQ(MOD) APPROVED DECK COVERING. SERVICE COST.
DECK COVERING IN MASTER CABIN, ACCOMMODATION SPACE, WHEEL HOUSE AND CREW BATHROOM CRACKED TO BE RENEWED WITH IHQ(MOD) APPROVED DECK COVERING. MATERIAL COST
RENEW MFMB LAGGING AND PANELLING ON BULK HEADS AND DECK HEADS IN WHEEL HOUSE, MASTER CABIN AND LOBBY. SERVICE COST.
RENEW MFMB LAGGING AND PANELLING ON BULK HEADS AND DECK HEADS IN WHEEL HOUSE, MASTER CABIN AND LOBBY. MATERIAL COST
SHIPS BELL TO BE ELECTROPLATED. SERVICE COST
RENEW FOLLOWING ITEMS IN CREW TOILET, MASTER CABIN TOILET AND ENGINEERING CABIN TOILET:- (A) FRESH WATER PIPELINE OF GI OF 1/2" DIA APPROX LENGTH OF GI PIPE -30M. (B) 10 BIB COCKS. (C) 10 ISOLATING VALVES. (D) 04 SHOWERS. (E) 10 STOP COCKS (F) 04 IN NO. W/C OF STAINLESS STEEL. (G) 04 IN NO WASH BASINS PILLAR COCKS OF STAINLESS STEEL. SERVICE COST
RENEW FOLLOWING ITEMS IN CREW TOILET, MASTER CABIN TOILET AND ENGINEERING CABIN TOILET:- (A) FRESH WATER PIPELINE OF GI OF 1/2" DIA APPROX LENGTH OF GI PIPE -30M. (B) 10 BIB COCKS. (C) 10 ISOLATING VALVES. (D) 04 SHOWERS. (E) 10 STOP COCKS (F) 04 IN NO. W/C OF STAINLESS STEEL. (G) 04 IN NO WASH BASINS PILLAR COCKS OF STAINLESS STEEL. MATERIAL COST.
RENEW RUBBER COAMING OF 10 IN NOS SCUTTLES, DIA 300MM. SERVICE COST.
RENEW RUBBER COAMING OF 10 IN NOS SCUTTLES, DIA 300MM. MATERIAL COST
REPAIR 02 IN NOS SINGLE BOLLARD AND 08 IN NOS TWIN BOLLARD OF THE BARGE ALONG WITH PAD AND FOUNDATION. SERVICE COST.
REPAIR 02 IN NOS SINGLE BOLLARD AND 08 IN NOS TWIN BOLLARD OF THE BARGE ALONG WITH PAD AND FOUNDATION. MATERIAL COST
COMPLETE UNDER WATER AREA TO BE HYDRO BLASTED TO ACHIEVE SURFACE SA2.5 FOR UNDERWATER HULL SURVEY. SERVICE COST
COMPLETE UNDER WATER AREA TO BE HYDRO BLASTED TO ACHIEVE SURFACE SA2.5 FOR UNDERWATER HULL SURVEY. MATERIAL COST
UNDER WATER AREA:- BARGE TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INSPECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. PAINT SCHEME FOR THE BARGE IS AS FOLLOWS. (I) SURFACE PREPARATION BY ULTRA-HYDROJET PRESSURE AND VACCUM BLASTING TO SA 2.5 STANDARD. (II) ONE COAT OF PRIMER INTERGARD 269.DFT 50 MICRON.(N8010-P009678). (III) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(ALUMINIUM). DFT 150 MICRON. (N8010-P061977). (IV) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(BRONZE). DFT 150 MICRON. (N8010-P061944). (V) ONE COAT OF TIE COAT INTERGARD 263. DFT 125 MICRON. (N8010-P009601). (VI) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (VII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (DARK RED). DFT 150 MICRON. (N8010-P009603). (VIII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (IX) ONE COAT OF ANTIFOULING(BOOT TOP) INTERSMOOTH 360 (BLACK). DFT 150 MICRON. (N8010-P009604). SERVICE COST.
UNDER WATER AREA:- BARGE TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INSPECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. PAINT SCHEME FOR THE BARGE IS AS FOLLOWS. (I) SURFACE PREPARATION BY ULTRA-HYDROJET PRESSURE AND VACCUM BLASTING TO SA 2.5 STANDARD . (II) ONE COAT OF PRIMER INTERGARD 269.DFT 50 MICRON.(N8010-P009678). (III) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(ALUMINIUM). DFT 150 MICRON. (N8010-P061977). (IV) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(BRONZE). DFT 150 MICRON. (N8010-P061944). (V) ONE COAT OF TIE COAT INTERGARD 263. DFT 125 MICRON. (N8010-P009601). (VI) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (VII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (DARK RED). DFT 150 MICRON. (N8010-P009603). (VIII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (IX) ONE COAT OF ANTIFOULING(BOOT TOP) INTERSMOOTH 360 (BLACK). DFT 150 MICRON. (N8010-P009604). MATERIAL COST.
WEATHER DECKS:- TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) ONE COAT OF INTERGARD PRIMER 269 TO ACHIEVE DFT OF 50 MICRON. (III) ONE COAT OF INTERSHIELD 300 TO ACHIEVE A DRY FILM THICKNESS OF 200 MICRONS. (IV) ONE COAT OF INTERSHIELD 852 TO ACHIEVE A DRY FILM THICKNESS OF 800 MICRONS. SERVICE COST
WEATHER DECKS:- TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) ONE COAT OF INTERGARD PRIMER 269 TO ACHIEVE DFT OF 50 MICRON. (III) ONE COAT OF INTERSHIELD 300 TO ACHIEVE A DRY FILM THICKNESS OF 200 MICRONS. (IV) ONE COAT OF INTERSHIELD 852 TO ACHIEVE A DRY FILM THICKNESS OF 800 MICRONS. MATERIAL COST.
GENERAL SURFACES IN DRY COMPARTMENT INCLUDING INTERNAL DECKHEAD AND BULKHEAD TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE TO BE PREPARED TO ST-3 STANDARD. (II) ONE COAT OF EPOXY RED OXIDE PRIMER TO ACHIEVE A DRY FILM THICKNESS OF 50 MICRONS. (III) TWO COATS OF FR WHITE PAINT TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. SERVICE COST
GENERAL SURFACES IN DRY COMPARTMENT INCLUDING INTERNAL DECKHEAD AND BULKHEAD TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE TO BE PREPARED TO ST-3 STANDARD. (II) ONE COAT OF EPOXY RED OXIDE PRIMER TO ACHIEVE A DRY FILM THICKNESS OF 50 MICRONS. (III) TWO COATS OF FR WHITE PAINT TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. MATERIAL COST
CABLE LOCKER AND FORE PEAK TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURAFACE PREPARATION TO SA 2.5 STANDARD GRIT BLASTING.(II) PRISMATIC UNIVERSAL, ALUMINIUM / RT TO ACHIEVE DRY FILM THICKNESS OF 150 MICRONS. (III) PRISMATIC UNIVERSAL, ALUMINIUM TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. SERVICE COST.
CABLE LOCKER AND FORE PEAK TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURAFACE PREPARATION TO SA 2.5 STANDARD GRIT BLASTING.(II) PRISMATIC UNIVERSAL, ALUMINIUM / RT TO ACHIEVE DRY FILM THICKNESS OF 150 MICRONS. (III) PRISMATIC UNIVERSAL, ALUMINIUM TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. MATERIAL COST.
SHIP SIDE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & QC(HULL) AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. SERVICE COST.
SHIP SIDE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & QC(HULL) AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. MATERIAL COST.
SUPERSTRUCTURE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. SERVICE COST.
SUPERSTRUCTURE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. MATERIAL COST
FUEL TANK / LUB OIL TANK / FODS TANK / DIRTY OIL TANK /SLUDGE TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS OF ST3. FUEL OIL AND LUB OIL TANKS TO BE SMEARED WITH OM 750.:- I) TO BE THOROUGHLY CLEANED AND DRIED. (II) APPLY THREE COATS OF ANTI-CORROSIVE PAINT (INTERLINE 704 / N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (TANKGUARD HB CLASSIC/ N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COAT OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720/ N8010-007655) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. SERVICE COST
FUEL TANK / LUB OIL TANK / FODS TANK / DIRTY OIL TANK /SLUDGE TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS OF ST3. FUEL OIL AND LUB OIL TANKS TO BE SMEARED WITH OM 750.:- I) TO BE THOROUGHLY CLEANED AND DRIED. (II) APPLY THREE COATS OF ANTI-CORROSIVE PAINT (INTERLINE 704 / N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (TANKGUARD HB CLASSIC/ N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COAT OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720/ N8010-007655) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. MATERIAL COST
ENGINE ROOM BILGES / STORE BILGES / VOID SPACES / COFFERDAM / FOREPEAK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION ST 3. (II) INTERGARD 269 - 50 MICRON. (III) INTERSHIELD 300 (ALUMINIUM) - 1 X 150 MICRONS.(IV) INTERSHIELD 300 (BRONZE) - 1 X 150 MICRONS. SERVICE COST.
ENGINE ROOM BILGES / STORE BILGES / VOID SPACES / COFFERDAM / FOREPEAK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION ST 3. (II) INTERGARD 269 - 50 MICRON. (III) INTERSHIELD 300 (ALUMINIUM) - 1 X 150 MICRONS.(IV) INTERSHIELD 300 (BRONZE) - 1 X 150 MICRONS. MATERIAL COST.
FRESH WATER TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) TWO COATS OF ANTI-CORROSIVE PAINT (INTERLINE 850 / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (PENGUARD HB / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720 / N8010-007652) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. SERVICE COST.
FRESH WATER TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) TWO COATS OF ANTI-CORROSIVE PAINT (INTERLINE 850 / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (PENGUARD HB / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720 / N8010-007652) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. MATERIAL COST.
DECKS AND DADOES OF DRY COMPARTMENT TO BE PAINTED WITH MENTIONED PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. I) SURFACE PREPARATION OF ST 3 STANDARD. (II) TWO COATS OF DS CAT NO 8010-000113 YELLOW ZINC CHROMATE PRIMER. (III) TWO COATS OF DS CAT NO 8010-000298 MIDDLE BROWN FINISHING TO SHADE NO 411 TO IS 5 OR DS CAT NO 8010-000299 MIDDLE BURNS WICK GREEN FINISHING PAINT TO SHADE NO 266 OF IS 5. SERVICE COST.
DECKS AND DADOES OF DRY COMPARTMENT TO BE PAINTED WITH MENTIONED PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. I) SURFACE PREPARATION OF ST 3 STANDARD. (II) TWO COATS OF DS CAT NO 8010-000113 YELLOW ZINC CHROMATE PRIMER. (III) TWO COATS OF DS CAT NO 8010-000298 MIDDLE BROWN FINISHING TO SHADE NO 411 TO IS 5 OR DS CAT NO 8010-000299 MIDDLE BURNS WICK GREEN FINISHING PAINT TO SHADE NO 266 OF IS 5. MATERIAL COST.
SERVICEABILITY CHECKS AND REFILLING OF FOLLOWING EXTINGUISHERS. A) 9 LT AFFF EXTINGUISHERS - 08 NOS. B) 10 KGS DCP EXTINGUISHER - 03 NOS. C) 2 KGS CO2 EXTINGUISHER - 08 NOS. SERVICE COST.
SERVICEABILITY CHECKS AND REFILLING OF FOLLOWING EXTINGUISHERS. A) 9 LT AFFF EXTINGUISHERS - 08 NOS. B) 10 KGS DCP EXTINGUISHER - 03 NOS. C) 2 KGS CO2 EXTINGUISHER - 08 NOS. MATERIAL COST.
02 IN NOS GREAVES ENGINE NOT WORKING. DISMANTLE INTAKE AND EXHAUST MANIFOLD. CHECK ALL CYLINDER AND PROVE THE SYSTEM. SERVICE COST
02 IN NOS GREAVES ENGINE NOT WORKING. DISMANTLE INTAKE AND EXHAUST MANIFOLD. CHECK ALL CYLINDER AND PROVE THE SYSTEM. MATERIAL COST
DIESEL ALTERNATORS. MAKE: CUMMINS. MODEL: NT-743. CARRY OUT 1500 HOURLY ROUTINES. RENEW ALL SENSORS WITH CABLING AND GAUGES. CHEMICAL CLEANING OF COOLERS. PROVE THE SYSTEM ONBOARD FOR OPTIMUM PERFORMANCE. SERVICE COST.
DIESEL ALTERNATORS. MAKE: CUMMINS. MODEL: NT-743. CARRY OUT 1500 HOURLY ROUTINES. RENEW ALL SENSORS WITH CABLING AND GAUGES. CHEMICAL CLEANING OF COOLERS. PROVE THE SYSTEM ONBOARD FOR OPTIMUM PERFORMANCE. MATERIAL COST
OVERHAUL OF 60TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. SERVICE COST.
OVERHAUL OF 60TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. MATERIAL COST
OVERHAUL OF 37TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: MODY, TYPE: DC8Y-DE. SERVICE COST.
OVERHAUL OF 37TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: MODY, TYPE: DC8Y-DE. MATERIAL COST
OVERHAUL OF 20TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. SERVICE COST.
OVERHAUL OF 20TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. MATERIAL COST
REPAIR 20TPH SUBMERSIBLE PUMP. MAKE: MODY. SERVICE COST.
REPAIR 20TPH SUBMERSIBLE PUMP. MAKE: MODY. MATERIAL COST
RENEW 01 IN NO 40TPH AND 02 IN NOS 20 TPH SUBMERSIBLE PUMP WITH STARTER AND 100M CABLE. MAKE: MODY. SERVICE COST
RENEW 01 IN NO 40TPH AND 02 IN NOS 20 TPH SUBMERSIBLE PUMP WITH STARTER AND 100M CABLE. MAKE: MODY. MATERIAL COST
FOLLOWING SYSTEM PIPES TO BE REMOVED, REPAIRED ALONG WITH THE END FITTINGS (IF REQUIRED MAT FOR END FITTING FOR MS GALV. PIPES - MS AND FOR CUNI PIPES - BRASS), PRESSURE TESTED, COLOURED AS PER COLOUR CODE, REFITTED AND PROVED THE SYSTEM FOR OPTIMUM PERFORMANCE. (A) MAIN SEA SUCTION PIPE TO BE REPAIRED DIA APPROX - 200 MM (OD 219 X THK 5.4 MM), LENGTH -APPROX - 04 MTRS, NOS OF FLANGES - 14, MATERIAL FOR PIPE - MS GALV (IS-3589 OR ASTM A-106, GR-B), FLANGES-MS, TP-3.5 KG/SQ.CM. (B) DG SEA SUCTION PIPE, DIA -50MM LENGTH APPROX - 15 MTRS, QTY - 08, MAT- MS GALV. TP-3.5 KG/SQ.CM. (C) DECK CONNECTION FILLING PIPES / AIR VENT PIPES OF VARIOUS TANKS UPROUTING FROM UPPER DECK TO BE RENEWED IF REQUIRED, DIA APPROX - 40MM TO 60 MM, LENGTH APPROX - 10 MTRS, QTY-20, MAT-MS, TP-3.5 KG/SQ.CM. (D) FUEL SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM.( E) LO SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM. (F) FW PUMP DISCHARGE PIPES, DIA-40MM, LENGTH APPROX-05 MTR, QTY-02, MAT-CUNI, TP-3.5 KG/SQ.CM. SERVICE COST
FOLLOWING SYSTEM PIPES TO BE REMOVED, REPAIRED ALONG WITH THE END FITTINGS (IF REQUIRED MAT FOR END FITTING FOR MS GALV. PIPES - MS AND FOR CUNI PIPES - BRASS), PRESSURE TESTED, COLOURED AS PER COLOUR CODE, REFITTED AND PROVED THE SYSTEM FOR OPTIMUM PERFORMANCE. (A) MAIN SEA SUCTION PIPE TO BE REPAIRED DIA APPROX - 200 MM (OD 219 X THK 5.4 MM), LENGTH -APPROX - 04 MTRS, NOS OF FLANGES - 14, MATERIAL FOR PIPE - MS GALV (IS-3589 OR ASTM A-106, GR-B), FLANGES-MS, TP-3.5 KG/SQ.CM. (B) DG SEA SUCTION PIPE, DIA -50MM LENGTH APPROX - 15 MTRS, QTY - 08, MAT- MS GALV. TP-3.5 KG/SQ.CM. (C) DECK CONNECTION FILLING PIPES / AIR VENT PIPES OF VARIOUS TANKS UPROUTING FROM UPPER DECK TO BE RENEWED IF REQUIRED, DIA APPROX - 40MM TO 60 MM, LENGTH APPROX - 10 MTRS, QTY-20, MAT-MS, TP-3.5 KG/SQ.CM. (D) FUEL SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM.( E) LO SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM. (F) FW PUMP DISCHARGE PIPES, DIA-40MM, LENGTH APPROX-05 MTR, QTY-02, MAT-CUNI, TP-3.5 KG/SQ.CM. MATERIAL COST
FOLLOWING SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED(PT) AND REFITTED. MAT-GM. (A) FIRE MAIN SYSTEM (SDSL) VALVES (PT:15.5 KG/SQ.CM.), DIA 100MM, QTY -05 NOS. (B) EMERGENCY COOLING VALVES FOR DG (PT:4.5 KG/SQ.CM), DIA 50MM, QTY - 02 NOS. (C)FIRE HYDRANT VALVES (PT: 10.5 KG/SQ.CM), DIA 65 MM, QTY -05 NOS. (D) FUEL SUCTION QUICK CLOSING VALVES (PT: 3.5 KG/SQ.CM), DIA 40MM, QTY -02 NOS. (E) FUEL SUPPLY QUICK CLOSING VALVES (PT-3.5 KG/SQ.CM), DIA-20MM, QTY - 02 NOS. (F) FUEL DRAIN VALVES SELF CLOSING TYPE (PT:3.5 KG/SQ.CM), DIA 15MM, QTY - 02 NOS. (G) LUB / FUEL OIL SYSTEM VALVES (PT:3.5KG/SQ.CM), DIA 20 MM, QTY - 02 NOS. SERVICE COST.
FOLLOWING SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED(PT) AND REFITTED. MAT-GM. (A) FIRE MAIN SYSTEM (SDSL) VALVES (PT:15.5 KG/SQ.CM.), DIA 100MM, QTY -05 NOS. (B) EMERGENCY COOLING VALVES FOR DG (PT:4.5 KG/SQ.CM), DIA 50MM, QTY - 02 NOS. (C)FIRE HYDRANT VALVES (PT: 10.5 KG/SQ.CM), DIA 65 MM, QTY -05 NOS. (D) FUEL SUCTION QUICK CLOSING VALVES (PT: 3.5 KG/SQ.CM), DIA 40MM, QTY -02 NOS. (E) FUEL SUPPLY QUICK CLOSING VALVES (PT-3.5 KG/SQ.CM), DIA-20MM, QTY - 02 NOS. (F) FUEL DRAIN VALVES SELF CLOSING TYPE (PT:3.5 KG/SQ.CM), DIA 15MM, QTY - 02 NOS. (G) LUB / FUEL OIL SYSTEM VALVES (PT:3.5KG/SQ.CM), DIA 20 MM, QTY - 02 NOS. MATERIAL COST
CLEAN, PRESSURE TEST AND REPAINT CO2 CYLINDERS. CHECK CO2 SYSTEM, RENEW DEFECTIVE GAUGES AND PROVE THE SYSTEM ONBOARD (BOTH LOCAL AND REMOTE) FOR OPTIMUM PERFORMANCE. MAKE: M/S SHM SHIPCARE. SERVICE COST
CLEAN, PRESSURE TEST AND REPAINT CO2 CYLINDERS. CHECK CO2 SYSTEM, RENEW DEFECTIVE GAUGES AND PROVE THE SYSTEM ONBOARD (BOTH LOCAL AND REMOTE) FOR OPTIMUM PERFORMANCE. MAKE: M/S SHM SHIPCARE. MATERIAL COST
RENEW TANK CONTENT GAUGE. MAKE: NIVO CONTROL PVT LTD. SERVICE COST.
RENEW TANK CONTENT GAUGE. MAKE: NIVO CONTROL PVT LTD. MATERIAL COST
RENEW FLOWMETER. MAKE: M/S ROCKWIN. SERVICE COST.
RENEW FLOWMETER. MAKE: M/S ROCKWIN. MATERIAL COST
OVERHAUL HAND PUMP. MAKE: M/S VENUS PUMP & ENGINEERING WORK. REPLACE GASKET, GLAND AND BEARING. SERVICE COST.
OVERHAUL HAND PUMP. MAKE: M/S VENUS PUMP & ENGINEERING WORK. REPLACE GASKET, GLAND AND BEARING. MATERIAL COST
20 KVA, 415V, 3PH, 50HZ ALTERNATOR TO BE OVERHAULED AND LOAD TRIALS TO BE CARRIED OUT AS PER STANDARD NORMS. ALTERNATOR MAKE: CROMPTON GREAVES. 1) CHECK INSULATION OF WINDINGS. 2) IMPROVE INSULATION OR RENEW WINDINGS IF REQUIRED. 3) RENEW BEARING DE & NDE. 4) REPLACE AVR. SERVICE COST.
20 KVA, 415V, 3PH, 50HZ ALTERNATOR TO BE OVERHAULED AND LOAD TRIALS TO BE CARRIED OUT AS PER STANDARD NORMS. ALTERNATOR MAKE: CROMPTON GREAVES. 1) CHECK INSULATION OF WINDINGS. 2) IMPROVE INSULATION OR RENEW WINDINGS IF REQUIRED. 3) RENEW BEARING DE & NDE. 4) REPLACE AVR. MATERIAL COST
OVERHAUL, REPAIR AND PROVE MAIN SWITCH BOARD ONBOARD. RENEW FOLLOWING:- (A) 3- PHASE, 100AMPS,CIRCUIT BREAKER, MAKE: SCHNEIDERELECT., MSB MAKE:- PR ENETRPRISE. QTY - 04 NOS. (B) VOLTMETER: 0 TO 500 V. QTY - 03 NOS (C) VOLTMETER: 0 TO 300 V. QTY -01 NOS. (D) HZ METER: 45 TO 55. QTY -03 NOS (E) POWER FACTOR METER: 0.5-1-0.5. QTY - 03 NOS (F) KW METER: 0 TO 30 QTY - 01 NOS (G) KW METER: 0 TO 12. QTY - 01 NOS (H) AMMETER: 0-50. QTY - 02 NOS (J) AMMETER: 0-30. QTY - 02 NOS (K) 3- PHASE, 3 POLE, MCCB- 10 AMPS. QTY - 06 NOS (L) 3- PHASE, 3 POLE, MCCB- 16 AMPS. QTY - 02 NOS (M) 3- PHASE, 3 POLE, MCCB- 20AMPS. QTY - 02 NOS (N) 2- POLE, MCCB- 06 AMPS. QTY - 05 NOS. SERVICE COST.
OVERHAUL, REPAIR AND PROVE MAIN SWITCH BOARD ONBOARD. RENEW FOLLOWING:- (A) 3- PHASE, 100AMPS,CIRCUIT BREAKER, MAKE: SCHNEIDERELECT., MSB MAKE:- PR ENETRPRISE. QTY - 04 NOS. (B) VOLTMETER: 0 TO 500 V. QTY - 03 NOS (C) VOLTMETER: 0 TO 300 V. QTY -01 NOS. (D) HZ METER: 45 TO 55. QTY -03 NOS (E) POWER FACTOR METER: 0.5-1-0.5. QTY - 03 NOS (F) KW METER: 0 TO 30 QTY - 01 NOS (G) KW METER: 0 TO 12. QTY - 01 NOS (H) AMMETER: 0-50. QTY - 02 NOS (J) AMMETER: 0-30. QTY - 02 NOS (K) 3- PHASE, 3 POLE, MCCB- 10 AMPS. QTY - 06 NOS (L) 3- PHASE, 3 POLE, MCCB- 16 AMPS. QTY - 02 NOS (M) 3- PHASE, 3 POLE, MCCB- 20AMPS. QTY - 02 NOS (N) 2- POLE, MCCB- 06 AMPS. QTY - 05 NOS. MATERIAL COST.
RENEW CONTROL TRANSFORMER. MAKE: INDUSHREE, INPUT- 415V OUTPUT 220V:- (I) 04 IN NOS 100 VA. (II) 01 IN NOS 200 VA. SERVICE COST.
RENEW CONTROL TRANSFORMER. MAKE: INDUSHREE, INPUT- 415V OUTPUT 220V:- (I) 04 IN NOS 100 VA. (II) 01 IN NOS 200 VA. MATERIAL COST.
RENEW (I) CREW ACCOMMODATION VENTILATION BLOWER MOTOR 230V,3PH, 1HP. QTY - 1 NOS (II) PUMP ROOM EXHAUST FAN MOTOR, 3PH, 415V, 1HP. QTY - 1 NOS (III) STP PLANT MOTOR 3PH, 2.2 KW. QTY - 2 NOS (IV) E/R VENTILATION BLOWER MOTOR STARTER 3PH. QTY - 1 NOS (V) PUMP ROOM EXHAUST FAN MOTOR STARTER 3 PH. QTY - 01 NOS. SERVICE COST.
RENEW (I) CREW ACCOMMODATION VENTILATION BLOWER MOTOR 230V,3PH, 1HP. QTY - 1 NOS (II) PUMP ROOM EXHAUST FAN MOTOR, 3PH, 415V, 1HP. QTY - 1 NOS (III) STP PLANT MOTOR 3PH, 2.2 KW. QTY - 2 NOS (IV) E/R VENTILATION BLOWER MOTOR STARTER 3PH. QTY - 1 NOS (V) PUMP ROOM EXHAUST FAN MOTOR STARTER 3 PH. QTY - 01 NOS. MATERIAL COST
O/H BATTERY CHARGER CUM DC DISTRIBUTION BOARD, MAKE: PR ENTERPRISE AND PROVE ON BOARD FOR OPTIMUM PERFORMANCE. SERVICE COST.
O/H BATTERY CHARGER CUM DC DISTRIBUTION BOARD, MAKE: PR ENTERPRISE AND PROVE ON BOARD FOR OPTIMUM PERFORMANCE. MATERIAL COST.
NAVIGATION PANEL 230V AND 24V WITH 07 IN NO. EACH NAVIGATION LIGHT CONTROL PCB TO BE OVERHAULED, REPAIRED AND TESTED ONBOARD. ALL LIGHT FITTINGS TO BE REPLACED. SERVICE COST.
NAVIGATION PANEL 230V AND 24V WITH 07 IN NO. EACH NAVIGATION LIGHT CONTROL PCB TO BE OVERHAULED, REPAIRED AND TESTED ONBOARD. ALL LIGHT FITTINGS TO BE REPLACED. MATERIAL COST
220V WINDOW WIPER MOTOR WITH ASSEMBLY TO BE REPLACED, OVERHAULED AND TESTED ONBOARD. MAKE: SPEIOH, GERMANY. SERVICE COST.
220V WINDOW WIPER MOTOR WITH ASSEMBLY TO BE REPLACED, OVERHAULED AND TESTED ONBOARD. MAKE: SPEIOH, GERMANY. MATERIAL COST
FOLLOWING PANELS TO BE OVERHAULED, REPAIRED AND TO BE TESTED ON LOAD: (A) FIRE DETECTION CUM CO2 PANEL-01 NO. MAKE: FIRE DEFENCE. (B) SLUDGE TANK INDICATOR PANEL-01 NO. MAKE: NIVO CONTROL PVT. LTD. INDIA, INDORE. (C) I.V CONVERTOR 230V AC, 50HZ - 01 NOS. SERVICE COST.
FOLLOWING PANELS TO BE OVERHAULED, REPAIRED AND TO BE TESTED ON LOAD: (A) FIRE DETECTION CUM CO2 PANEL-01 NO. MAKE: FIRE DEFENCE. (B) SLUDGE TANK INDICATOR PANEL-01 NO. MAKE: NIVO CONTROL PVT. LTD. INDIA, INDORE. (C) I.V CONVERTOR 230V AC, 50HZ - 01 NOS. MATERIAL COST
SHIELDED SHORE SUPPLY CABLE TO BE PROVIDED 3 CORE X 16 SQ MM. SERVICE COST.
SHIELDED SHORE SUPPLY CABLE TO BE PROVIDED 3 CORE X 16 SQ MM. MATERIAL COST
RENEW FOLLOWING ITEMS:- (A) 15/5 AMPS MULTI-PIN SOCKET - 25 NOS. (B) 15 AMPS SWITCH - 15 NOS. (C) MINI TUBELIGHT FOR BED SIDE, 230V - 04 NOS. (D) CFL 20W (ACCOM.) - 8 NOS. (E) CFL 10W (TOILET). - 2 NOS (F) 20W TWIN TUBE LIGHT FITTING. - 12 NOS. (G) DECK SIDE LIGHT FITTING 230V. - 20 NOS. (H) EMERGENCY 24V LIGHT FITTING. - 12 NOS. SERVICE COST.
RENEW FOLLOWING ITEMS:- (A) 15/5 AMPS MULTI-PIN SOCKET - 25 NOS. (B) 15 AMPS SWITCH - 15 NOS. (C) MINI TUBELIGHT FOR BED SIDE, 230V - 04 NOS. (D) CFL 20W (ACCOM.) - 8 NOS. (E) CFL 10W (TOILET). - 2 NOS (F) 20W TWIN TUBE LIGHT FITTING. - 12 NOS. (G) DECK SIDE LIGHT FITTING 230V. - 20 NOS. (H) EMERGENCY 24V LIGHT FITTING. - 12 NOS. MATERIAL COST.
RENEW FOLLOWING:- (A) 01 CFL LAMP, 18W WITH FITTING AND 1 TWO WAY ON/OFF SWITCH IN BATTERY STORE - 02 NOS. (B) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN NAVAL STORE - 03 NOS. (C) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET IN DECK STORE - 02 NOS. (D) 01 24V DC LIGHT FITTING; 1 LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN PUMP STORE - 04 NOS. (E) 01 24 V DC LIGHT FITTING; 3 LAMP FITTING; 4 TWIN TUBE LIGHT FITTING 20W EACH AND 2 TWO WAY ON/OFF SWITCH IN PUMP ROOM - 12 NOS. (F) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CO2 STORE - 03 NOS. (G) 01 24V DC LIGHT FITTING; 3 CFL 18W AND LAMP FITTING AND 7 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CREW ACCOMMODATION - 12 NOS. (H) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW BATHROOM - 04 NOS. (J) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW LOBBY - 03 NOS. (K) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 COMBINED AND 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN STGR COMPT - 05 NOS. (L) 01 24V DC LIGHT FITTING; 4 CFL 18W LAMP WITH FITTING IN DECK PASSAGE - 06 NOS. (M) 01 24V DC LIGHT FITTING; 3 CFL 18W WITH LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN WHEEL HOUSE - 05 NOS. (N) 01 24V DC LIGHT; 4 CFL LAMP, 18W WITH LAMP FITTING IN UPPER DECK - 05 NOS. (P) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 14-27 COMPT - 03 NOS. (Q) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 27-40 COMPT - 03 NOS. (R) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 40-54 COMPT - 03 NOS. (S) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 54-58 COMPT - 03 NOS. SERVICE COST.
RENEW FOLLOWING:- (A) 01 CFL LAMP, 18W WITH FITTING AND 1 TWO WAY ON/OFF SWITCH IN BATTERY STORE - 02 NOS. (B) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN NAVAL STORE - 03 NOS. (C) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET IN DECK STORE - 02 NOS. (D) 01 24V DC LIGHT FITTING; 1 LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN PUMP STORE - 04 NOS. (E) 01 24 V DC LIGHT FITTING; 3 LAMP FITTING; 4 TWIN TUBE LIGHT FITTING 20W EACH AND 2 TWO WAY ON/OFF SWITCH IN PUMP ROOM - 12 NOS. (F) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CO2 STORE - 03 NOS. (G) 01 24V DC LIGHT FITTING; 3 CFL 18W AND LAMP FITTING AND 7 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CREW ACCOMMODATION - 12 NOS. (H) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW BATHROOM - 04 NOS. (J) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW LOBBY - 03 NOS. (K) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 COMBINED AND 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN STGR COMPT - 05 NOS. (L) 01 24V DC LIGHT FITTING; 4 CFL 18W LAMP WITH FITTING IN DECK PASSAGE - 06 NOS. (M) 01 24V DC LIGHT FITTING; 3 CFL 18W WITH LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN WHEEL HOUSE - 05 NOS. (N) 01 24V DC LIGHT; 4 CFL LAMP, 18W WITH LAMP FITTING IN UPPER DECK - 05 NOS. (P) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 14-27 COMPT - 03 NOS. (Q) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 27-40 COMPT - 03 NOS. (R) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 40-54 COMPT - 03 NOS. (S) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 54-58 COMPT - 03 NOS. MATERIAL COST.
O/H, REPAIR AND TEST ONLOAD E/R LIGHTING TRANSFORMER BANK. CAPACITY 6 KVA=2KVA X 3+1 SPARE, I/P-415 V,3PH, 50HZ. MAKE: AUTOMATIC ELECTRONIC CONTROLS MFG.CO. RENEW FOLLOWING:- (A) 3-POLE MCCB- 32AMPS - 01 NOS. (B) INDICATING LAMP - 03 NOS. (C) 3-POLE MCCB- 10 AMPS - 03 NOS. SERVICE COST
O/H, REPAIR AND TEST ONLOAD E/R LIGHTING TRANSFORMER BANK. CAPACITY 6 KVA=2KVA X 3+1 SPARE, I/P-415 V,3PH, 50HZ. MAKE: AUTOMATIC ELECTRONIC CONTROLS MFG.CO. RENEW FOLLOWING:- (A) 3-POLE MCCB- 32AMPS - 01 NOS. (B) INDICATING LAMP - 03 NOS. (C) 3-POLE MCCB- 10 AMPS - 03 NOS. MATERIAL COST
REPAIR/ RENEW AND TEST INTERCOM CONTROL UNIT WITH HAND SET OF TELEPHONE EXCHANGE PHONE SOCKET BETWEEN ELECTRICAL CONTROL ROOM, PUMP ROOM, CREW ACCOM. AND WHEEL HOUSE. MAKE - TELEMATICS. SERVICE COST.
REPAIR/ RENEW AND TEST INTERCOM CONTROL UNIT WITH HAND SET OF TELEPHONE EXCHANGE PHONE SOCKET BETWEEN ELECTRICAL CONTROL ROOM, PUMP ROOM, CREW ACCOM. AND WHEEL HOUSE. MAKE - TELEMATICS. MATERIAL COST.
PROVIDE 12V, 200AH (MAKE : EXIDE) LEAD ACID BATTERIES WITH OEM WARRANTY CERTIFICATE. TEST ONBOARD ON LOAD DURING TRIALS. SERVICE COST.
PROVIDE 12V, 200AH (MAKE : EXIDE) LEAD ACID BATTERIES WITH OEM WARRANTY CERTIFICATE. TEST ONBOARD ON LOAD DURING TRIALS. MATERIAL COST.
RENEW FOLLOWING ITEMS OF 20KVA ALTERNATOR ENGINE:- 01 IN NO. 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 01 IN NO 12V BATTERY CHARGING ALTERNATOR; 01 IN NO 12V DC INDICATING LAMP; 01 IN NO 50-0-50 AMMETER AND 01 IN NO START/STOP PUSH BUTTON/SWITCH. SERVICE COST.
RENEW FOLLOWING ITEMS OF 20KVA ALTERNATOR ENGINE:- 01 IN NO. 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 01 IN NO 12V BATTERY CHARGING ALTERNATOR; 01 IN NO 12V DC INDICATING LAMP; 01 IN NO 50-0-50 AMMETER AND 01 IN NO START/STOP PUSH BUTTON/SWITCH. MATERIAL COST.
RENEW FOLLOWING ITEMS OF SLUDGE DIESEL PUMP I AND II ENGINE IN PUMP ROOM:- 02 IN NO KEY SWITCH; 02 IN NO 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 02 IN NO 12V BATTERY CHARGING ALTERNATOR; 02 IN NO 12V DC INDICATING LAMP; 02 IN NO 50-0-50 AMMETER. SERVICE COST.
RENEW FOLLOWING ITEMS OF SLUDGE DIESEL PUMP I AND II ENGINE IN PUMP ROOM:- 02 IN NO KEY SWITCH; 02 IN NO 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 02 IN NO 12V BATTERY CHARGING ALTERNATOR; 02 IN NO 12V DC INDICATING LAMP; 02 IN NO 50-0-50 AMMETER. MATERIAL COST.
RENEW, TEST AND PROVE FOLLOWING ITEMS ONBOARD:- A) 230V WIND SCREEN WIPER WITH SWITCH PANEL. MAKE: SPEICH GENEVA, ITALY - 02 NOS. (B) GENERAL ALARM PUSH BUTTON STATION TO 05 NOS GONG BELL/HORN. (C) EVAC SANITARY SYSTEM PANEL- 01 NO MAKE: EVAC DY HELSENKI, FINLAND - 01 NOS. (D) TWIN TUBE LIGHT FITTING NAME BOARD - 01 NOS. (E) 220V / 400W FLOOD LIGHT WITH CONTROL GEAR BOX - 01 NOS (F) ON UPPER DECK 415V, 3PH, 50HZ SUBMERSIBLE PUMP SWITCH/ SOCKETS - 04 NOS. SERVICE COST.
RENEW, TEST AND PROVE FOLLOWING ITEMS ONBOARD:- A) 230V WIND SCREEN WIPER WITH SWITCH PANEL. MAKE: SPEICH GENEVA, ITALY - 02 NOS. (B) GENERAL ALARM PUSH BUTTON STATION TO 05 NOS GONG BELL/HORN. (C) EVAC SANITARY SYSTEM PANEL- 01 NO MAKE: EVAC DY HELSENKI, FINLAND - 01 NOS. (D) TWIN TUBE LIGHT FITTING NAME BOARD - 01 NOS. (E) 220V / 400W FLOOD LIGHT WITH CONTROL GEAR BOX - 01 NOS (F) ON UPPER DECK 415V, 3PH, 50HZ SUBMERSIBLE PUMP SWITCH/ SOCKETS - 04 NOS. MATERIAL COST.
DOCKING IN VER- I & II FOR 30 DAYS AS PER DOCKING PLAN. JOINT INSP WITH PAINT OEM/ SS & INSP AGENCY. TO AND FRO TOWING FROM ND (MBI) TO SHIPYARD & BACK. SERVICE COST
QC COVERAGE BY IRS. SERVICE COST
VOYAGE INSURANCE OF THE VESSEL CONSIDERING COST OF VESSEL AS RS. 4.93 CRORES. SERVICE COST
WET BASIN/ WHARFAGE FACILITY FOR A DURATION OF 60 DAYS. SERVICE COST
SOW FOR SULLAGE BARGE 3 :- UTG READING TO BE TAKEN AND STEELS TO BE RENEWED BASED ON UTG READING AND SURVEYOR'S RECOMMENDATIONS AT (I) 1000 POINT ON U/W AREA INCLUDING BOOT TOPPING. (II) 600 POINT AT ENTIRE SHIP SIDE. (III) 600 POINT ON SUPERSTRUCTURE. AND (IV) 600 POINT ON WEATHER DECK AND 01 DECK. SERVICE COST.
UTG READING TO BE TAKEN AND STEELS TO BE RENEWED BASED ON UTG READING AND SURVEYOR'S RECOMMENDATIONS AT (I) 1000 POINT ON U/W AREA INCLUDING BOOT TOPPING. (II) 600 POINT AT ENTIRE SHIP SIDE. (III) 600 POINT ON SUPERSTRUCTURE. AND (IV) 600 POINT ON WEATHER DECK AND 01 DECK. MATERIAL COST.
STEEL RENEWAL- STEEL PLATE IS 2062 GRADE 'B' THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. SERVICE COST
STEEL RENEWAL- STEEL PLATE IS 2062 GRADE 'B' THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. MATERIAL COST
STEEL RENEWAL (STEEL PLATE IS 2062- GRADE ‘B’) - (I) SOLID MS ROD 30 MM OD (L - 50 M). (II) PIPE COAMING GI PIPE 65 MM OD (L - 30 M). (III) HALF ROUND SOLID BAR CARGO HATCH COAMING 80MM OD (L - 50 M). SERVICE COST.
STEEL RENEWAL (STEEL PLATE IS 2062- GRADE ‘B’) - (I) SOLID MS ROD 30 MM OD (L - 50 M). (II) PIPE COAMING GI PIPE 65 MM OD (L - 30 M). (III) HALF ROUND SOLID BAR CARGO HATCH COAMING 80MM OD (L - 50 M). MATERIAL COST.
RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 100X75X10 MM - MAT- IS 2062 GRADE 'A'. SERVICE COST
RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 100X75X10 MM - MAT- IS 2062 GRADE 'A'. MATERIAL COST
RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 250X100X8 MM. MAT - IS 2062 GRADE 'A'. SERVICE COST
RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 250X100X8 MM. MAT - IS 2062 GRADE 'A'. MATERIAL COST
RENEWAL OF T BAR STRUCTURAL STIFFENERS 220X100X8 MM. MAT - IS 2062 GRADE 'A'. SERVICE COST
RENEWAL OF T BAR STRUCTURAL STIFFENERS 220X100X8 MM. MAT - IS 2062 GRADE 'A'. MATERIAL COST
STEEL RENEWAL STRUCTURAL STIFFENERS: 'I' BEAM 100X200X100X8 MM. SERVICE COST.
STEEL RENEWAL STRUCTURAL STIFFENERS: 'I' BEAM 100X200X100X8 MM. MATERIAL COST.
PITS BUILD UP AT VARIOUS U/W AND A/W HULL AND DECKS LOCATIONS AS PER SURVEY REPORT. 1 PITS = 1 SQCM. SERVICE COST.
PITS BUILD UP AT VARIOUS U/W AND A/W HULL AND DECKS LOCATIONS AS PER SURVEY REPORT. 1 PITS = 1 SQCM. MATERIAL COST.
FOLLOWING SACRIFICIAL ANODES TO BE RENEWED (TO BE SUPPLIED BY VENDOR):- (I) 14 NOS MK-I AND (II) 06 NOS MK-VI. NOTE: SACRIFICIAL ANODE SHOULD CONFORM TO NCD 3906/3907. SACRIFICIAL ANODES TO BE SUPPLIED BY VENDOR AND BROUGHT FROM IHQ MOD(N) APPROVED VENDORS. SERVICE COST.
FOLLOWING SACRIFICIAL ANODES TO BE RENEWED (TO BE SUPPLIED BY VENDOR):- (I) 14 NOS MK-I AND (II) 06 NOS MK-VI. NOTE: SACRIFICIAL ANODE SHOULD CONFORM TO NCD 3906/3907. SACRIFICIAL ANODES TO BE SUPPLIED BY VENDOR AND BROUGHT FROM IHQ MOD(N) APPROVED VENDORS. MATERIAL COST
DRAUGHT MARKS TO BE RENEWED AND PAINTED. SERVICE COST.
DRAUGHT MARKS TO BE RENEWED AND PAINTED. MATERIAL COST
REMOVE / DISCONNECT TWO IN NO. ANCHORS / SHACKLES / ASSOCIATED FITTINGS FROM CHAIN CABLE. CHIP / CLEAN, PREPARE FOR SURVEY AND PAINT AS PER APPROVED PAINT SCHEME. SURVEY BY INSPECTIGN AGENCY. CONNECT UP ON COMPLETION (SIZE OF CHAIN CABLE 17.5 MM DIA, TOTAL LENGTH 274 M). SERVICE COST
REMOVE / DISCONNECT TWO IN NO. ANCHORS / SHACKLES / ASSOCIATED FITTINGS FROM CHAIN CABLE. CHIP / CLEAN, PREPARE FOR SURVEY AND PAINT AS PER APPROVED PAINT SCHEME. SURVEY BY INSPECTIGN AGENCY. CONNECT UP ON COMPLETION (SIZE OF CHAIN CABLE 17.5 MM DIA, TOTAL LENGTH 274 M). MATERIAL COST
REMOVE ANCHOR WINDLASS WITH MOTOR AND CARRY OUT OVERHAUL, RENEW MS FOUNDATION OF WINCH AND STOPPER, WINDLASS SIDE PLATES, BRAKE LINERS AND BOTH OPERATING HANDLES. PROVE WINDLASS UP TO SATISFACTORY LEVEL. SERVICE COST.
REMOVE ANCHOR WINDLASS WITH MOTOR AND CARRY OUT OVERHAUL, RENEW MS FOUNDATION OF WINCH AND STOPPER, WINDLASS SIDE PLATES, BRAKE LINERS AND BOTH OPERATING HANDLES. PROVE WINDLASS UP TO SATISFACTORY LEVEL. MATERIAL COST
GRP BOXES FOR SECURING FIRE HOSES OF SIZE 60X60X15 CM TO BE RENEWED AND SECURED WITH NUTS AND BOLTS ON THE SECURING BRACKETS. SECURING BRACKETS OF 2 IN X 2 IN ANGLE BAR CORRODED / THINNED TO BE RENEWED. SERVICE COST.
GRP BOXES FOR SECURING FIRE HOSES OF SIZE 60X60X15 CM TO BE RENEWED AND SECURED WITH NUTS AND BOLTS ON THE SECURING BRACKETS. SECURING BRACKETS OF 2 IN X 2 IN ANGLE BAR CORRODED / THINNED TO BE RENEWED. MATERIAL COST
CANVAS COVERS OF COMPRESSOR (1.5 MTR X 1 MTR X 1MTR), CONTROL STAND (1.5 MTR X 1 MTR X 1MTR), WINDLASS (1 MTR X 1 MTR X 1 MTR), TOWING ROPE REEL (1.5 MTR X 1.5 MTR X 1 MTR) AND CAPSTAN (1 MTR X 1 MTR X1 MTR) PERISHED. TO BE RENEWED AS PER SAMPLE. MAT-PVC COATED NYLON FABRIC. SERVICE COST
CANVAS COVERS OF COMPRESSOR (1.5 MTR X 1 MTR X 1MTR), CONTROL STAND (1.5 MTR X 1 MTR X 1MTR), WINDLASS (1 MTR X 1 MTR X 1 MTR), TOWING ROPE REEL (1.5 MTR X 1.5 MTR X 1 MTR) AND CAPSTAN (1 MTR X 1 MTR X1 MTR) PERISHED. TO BE RENEWED AS PER SAMPLE. MAT-PVC COATED NYLON FABRIC. MATERIAL COST
RENEW MS ANGLE BAR VERTICAL LADDERS. MAT-MS ANGLE BAR OF 75X75X10, MM LENGTH-22 FT AND 50 CM WIDE AND RUNGS PLACED AT 01 FOOT DISTANCE. SERVICE COST
RENEW MS ANGLE BAR VERTICAL LADDERS. MAT-MS ANGLE BAR OF 75X75X10, MM LENGTH-22 FT AND 50 CM WIDE AND RUNGS PLACED AT 01 FOOT DISTANCE. MATERIAL COST
COMPLETE OVERHAULING OF STP (MAKE - EVAC OY) INCLUDING PUMPS TO BE UNDERTAKEN AND FITMENT OF FIXED H2S SENSOR AS PER LATEST IHQ MOD POLICIES. SERVICE COST
COMPLETE OVERHAULING OF STP (MAKE - EVAC OY) INCLUDING PUMPS TO BE UNDERTAKEN AND FITMENT OF FIXED H2S SENSOR AS PER LATEST IHQ MOD POLICIES. MATERIAL COST
MUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED. SPINDLE TO BE RENEWED. SERVICE COST
MUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED. SPINDLE TO BE RENEWED. MATERIAL COST
RENEW 02 IN NOS WOODEN NAME BOARD OF CRAFT WITH MARINE PLY WITH BEADING AND PAINTED BLACK IN COLOUR. NAME LETTERS OF STAINLESS STEEL TO BE MADE AND FIXED ON BOARD. APPROX SIZE OF BOARD- 5FT X 4FT LETTERING SIZE APPROX 08 INCHES. SERVICE COST.
RENEW 02 IN NOS WOODEN NAME BOARD OF CRAFT WITH MARINE PLY WITH BEADING AND PAINTED BLACK IN COLOUR. NAME LETTERS OF STAINLESS STEEL TO BE MADE AND FIXED ON BOARD. APPROX SIZE OF BOARD- 5FT X 4FT LETTERING SIZE APPROX 08 INCHES. MATERIAL COST
01 WATER COOLER ALONG WITH AQUAGUARD WATER PURIFIER TO BE REPLACED WITH 120 LTRS COOLER WITH AQUAGUARD. FOUNDATION OF WATER COOLER IN GALLEY PERISHED. TO BE RENEWED WITH MS ANGLE BAR OF 1" X 1". WATER PIPES OF AQUAGUARD TO BE CONNECTED AND OUTLET TO BE CONNECTED TO COOLER WITH TWO ISOLATING VALVES. SIZE 1/2" GI PIPE. APPROX LENGTH-08 M. SERVICE COST.
01 WATER COOLER ALONG WITH AQUAGUARD WATER PURIFIER TO BE REPLACED WITH 120 LTRS COOLER WITH AQUAGUARD. FOUNDATION OF WATER COOLER IN GALLEY PERISHED. TO BE RENEWED WITH MS ANGLE BAR OF 1" X 1". WATER PIPES OF AQUAGUARD TO BE CONNECTED AND OUTLET TO BE CONNECTED TO COOLER WITH TWO ISOLATING VALVES. SIZE 1/2" GI PIPE. APPROX LENGTH-08 M. MATERIAL COST
RENEW 02 GREASE FILTERS OF GALLEY. MAT- BRASS WIRE MESH. SIZE- 60 CM X 40 CM. SERVICE COST.
RENEW 02 GREASE FILTERS OF GALLEY. MAT- BRASS WIRE MESH. SIZE- 60 CM X 40 CM. MATERIAL COST
WT HATCHES INCLUDING RUBBER BEADING AND BUTTERFLY NUTS CORRODED AND PERISHED. TO BE OVERHAULED. STRUCTURAL REPAIRS ALONG WITH RETAINER CLIP TO BE UNDERTAKEN AND RUBBER BEADING TO BE RENEWED. SIZE- 750 X 750 MM. CHALK TEST TO BE PROVED ON COMPLETION OF REPAIR. SERVICE COST.
WT HATCHES INCLUDING RUBBER BEADING AND BUTTERFLY NUTS CORRODED AND PERISHED. TO BE OVERHAULED. STRUCTURAL REPAIRS ALONG WITH RETAINER CLIP TO BE UNDERTAKEN AND RUBBER BEADING TO BE RENEWED. SIZE- 750 X 750 MM. CHALK TEST TO BE PROVED ON COMPLETION OF REPAIR. MATERIAL COST
RENEW NON WT DOORS INCLUDING SUNMICA AND LOCKS. SERVICE COST
RENEW NON WT DOORS INCLUDING SUNMICA AND LOCKS. MATERIAL COST
RENEW WT DOORS WITH HANDLES AND RUBBER BEADING. SERVICE COST
RENEW WT DOORS WITH HANDLES AND RUBBER BEADING. MATERIAL COST
RENEW MS BRACKETS/ CLAMPS FOR SECURING FIRE EXTINGUISHERS IN WHEEL HOUSE AS PER SAMPLE. SERVICE COST
RENEW MS BRACKETS/ CLAMPS FOR SECURING FIRE EXTINGUISHERS IN WHEEL HOUSE AS PER SAMPLE. MATERIAL COST
SEA CHEST GRATINGS TO BE OPENED. MUD BOX / SEA TUBE (MAT - MS) TO BE CHIPPED, CLEANED, REPAIRED. ANODE TO BE RENEWED INSIDE MUD BOX / SEA TUBE AND PAINTED WITH APPROVED PAINT SCHEME. SERVICE COST
SEA CHEST GRATINGS TO BE OPENED. MUD BOX / SEA TUBE (MAT - MS) TO BE CHIPPED, CLEANED, REPAIRED. ANODE TO BE RENEWED INSIDE MUD BOX / SEA TUBE AND PAINTED WITH APPROVED PAINT SCHEME. MATERIAL COST
RENEW SS W/C WITH FOUNDATION/ S TRAP / SOIL PIPE (MAT MS, DIA 100 MM, APPROX LENGTH-5MM) AND 01 OVER BOARD DISCHARGE VALVE AS PER SAMPLE. SERVICE COST.
RENEW SS W/C WITH FOUNDATION/ S TRAP / SOIL PIPE (MAT MS, DIA 100 MM, APPROX LENGTH-5MM) AND 01 OVER BOARD DISCHARGE VALVE AS PER SAMPLE. MATERIAL COST
RENEW CANVAS COVERS OF LIFE BUOYS AND PAINT WITH CRAFT NAME. SERVICE COST
RENEW CANVAS COVERS OF LIFE BUOYS AND PAINT WITH CRAFT NAME. MATERIAL COST
RENEW 01 FLUSHING PIPE WITH 01 NO FLUSHING VALVE OF SIZE - 30MM, MAT-GI APPROX LENGTH - 5 MM. SERVICE COST
RENEW 01 FLUSHING PIPE WITH 01 NO FLUSHING VALVE OF SIZE - 30MM, MAT-GI APPROX LENGTH - 5 MM. MATERIAL COST
RENEW FIXED GUARDRAILS WITH STANCHIONS ON WEATHER DECK, WHEEL HOUSE AND WHEEL HOUSE TOP DECK, PIPA DIA - 65 NB, (MS) APPROX RUNNING LENGTH - 100M. SERVICE COST
RENEW FIXED GUARDRAILS WITH STANCHIONS ON WEATHER DECK, WHEEL HOUSE AND WHEEL HOUSE TOP DECK, PIPA DIA - 65 NB, (MS) APPROX RUNNING LENGTH - 100M. MATERIAL COST
RENEW MS CHAIN ON NO 1 DECK, WHEEL HOUSE TOP DECK ASSOCIATED WITH GUARDRAIL STANCHIONS. SERVICE COST
RENEW MS CHAIN ON NO 1 DECK, WHEEL HOUSE TOP DECK ASSOCIATED WITH GUARDRAIL STANCHIONS. MATERIAL COST
RENEW MS LIFE RAFT STAND FOR SECURING LIFE RAFT. SERVICE COST
RENEW MS LIFE RAFT STAND FOR SECURING LIFE RAFT. MATERIAL COST
RENEW BREATHER PIPE INCLUDING GOOSE NECK ( DIA OF PIPE 50MM, MAT GI). SERVICE COST
RENEW BREATHER PIPE INCLUDING GOOSE NECK ( DIA OF PIPE 50MM, MAT GI). MATERIAL COST
RENEW MS VENTILATION SUPPLY AND EXHAUST TRUNK INCLUDING WIRE MESH ON UPPER DECK. SERVICE COST
RENEW MS VENTILATION SUPPLY AND EXHAUST TRUNK INCLUDING WIRE MESH ON UPPER DECK. MATERIAL COST
REPAIR MANHOLE DOOR COVER OF TANKS AND VOID SPACE INCLUDING SECURING STUDS / NUT BOLTS AND RUBBER JOINTS. RENEW RUBBER JOINTS. SERVICE COST.
REPAIR MANHOLE DOOR COVER OF TANKS AND VOID SPACE INCLUDING SECURING STUDS / NUT BOLTS AND RUBBER JOINTS. RENEW RUBBER JOINTS. MATERIAL COST
MATTRESS OF CREW MESS, MASTER CABIN, ENGINEER CABIN TO BE RENEWED WITH KURL-ON MAKE MATTRESS AND CLOTH COVERS OF FIRE RETARDANT MATERIAL. SIZE 2.5 x 6 FT EACH. SERVICE COST
MATTRESS OF CREW MESS, MASTER CABIN, ENGINEER CABIN TO BE RENEWED WITH KURL-ON MAKE MATTRESS AND CLOTH COVERS OF FIRE RETARDANT MATERIAL. SIZE 2.5 x 6 FT EACH. MATERIAL COST
REPLACE CHAIRS AND UPHOLSTERY OF CABINS WITH ISI STANDARD MAKE. SERVICE COST
REPLACE CHAIRS AND UPHOLSTERY OF CABINS WITH ISI STANDARD MAKE. MATERIAL COST
TYRE FENDERS TO BE RENEWED AND SECURED WITH CHAIN CABLE OF 32 INCH DIA AND LENGTH 2 M EACH. SERVICE COST
TYRE FENDERS TO BE RENEWED AND SECURED WITH CHAIN CABLE OF 32 INCH DIA AND LENGTH 2 M EACH. MATERIAL COST
CORRUGATED GI SHEET ON FOXLE AND QUATER DECK TO BE RENEWED WITH CORRUGATED PVC AND SECURED WITH J-BOLTS. SERVICE COST
CORRUGATED GI SHEET ON FOXLE AND QUATER DECK TO BE RENEWED WITH CORRUGATED PVC AND SECURED WITH J-BOLTS. MATERIAL COST
RENEW DECK EYES AS PER IS 6203. SERVICE COST
RENEW DECK EYES AS PER IS 6203. MATERIAL COST
RENEW CREW MESS LOCKERS LOCK. SERVICE COST.
RENEW CREW MESS LOCKERS LOCK. MATERIAL COST
DECK COVERING IN MASTER CABIN, ACCOMMODATION SPACE, WHEEL HOUSE AND CREW BATHROOM CRACKED TO BE RENEWED WITH IHQ(MOD) APPROVED DECK COVERING. SERVICE COST.
DECK COVERING IN MASTER CABIN, ACCOMMODATION SPACE, WHEEL HOUSE AND CREW BATHROOM CRACKED TO BE RENEWED WITH IHQ(MOD) APPROVED DECK COVERING. MATERIAL COST
RENEW MFMB LAGGING AND PANELLING ON BULK HEADS AND DECK HEADS IN WHEEL HOUSE, MASTER CABIN AND LOBBY. SERVICE COST.
RENEW MFMB LAGGING AND PANELLING ON BULK HEADS AND DECK HEADS IN WHEEL HOUSE, MASTER CABIN AND LOBBY. MATERIAL COST
SHIPS BELL TO BE ELECTROPLATED. SERVICE COST
RENEW FOLLOWING ITEMS IN CREW TOILET, MASTER CABIN TOILET AND ENGINEERING CABIN TOILET:- (A) FRESH WATER PIPELINE OF GI OF 1/2" DIA APPROX LENGTH OF GI PIPE -30M. (B) 10 BIB COCKS. (C) 10 ISOLATING VALVES. (D) 04 SHOWERS. (E) 10 STOP COCKS (F) 04 IN NO. W/C OF STAINLESS STEEL. (G) 04 IN NO WASH BASINS PILLAR COCKS OF STAINLESS STEEL. SERVICE COST
RENEW FOLLOWING ITEMS IN CREW TOILET, MASTER CABIN TOILET AND ENGINEERING CABIN TOILET:- (A) FRESH WATER PIPELINE OF GI OF 1/2" DIA APPROX LENGTH OF GI PIPE -30M. (B) 10 BIB COCKS. (C) 10 ISOLATING VALVES. (D) 04 SHOWERS. (E) 10 STOP COCKS (F) 04 IN NO. W/C OF STAINLESS STEEL. (G) 04 IN NO WASH BASINS PILLAR COCKS OF STAINLESS STEEL. MATERIAL COST.
RENEW RUBBER COAMING OF 10 IN NOS SCUTTLES, DIA 300MM. SERVICE COST.
RENEW RUBBER COAMING OF 10 IN NOS SCUTTLES, DIA 300MM. MATERIAL COST
REPAIR 02 IN NOS SINGLE BOLLARD AND 08 IN NOS TWIN BOLLARD OF THE BARGE ALONG WITH PAD AND FOUNDATION. SERVICE COST.
REPAIR 02 IN NOS SINGLE BOLLARD AND 08 IN NOS TWIN BOLLARD OF THE BARGE ALONG WITH PAD AND FOUNDATION. MATERIAL COST
COMPLETE UNDER WATER AREA TO BE HYDRO BLASTED TO ACHIEVE SURFACE SA2.5 FOR UNDERWATER HULL SURVEY. SERVICE COST
COMPLETE UNDER WATER AREA TO BE HYDRO BLASTED TO ACHIEVE SURFACE SA2.5 FOR UNDERWATER HULL SURVEY. MATERIAL COST
UNDER WATER AREA:- BARGE TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INSPECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. PAINT SCHEME FOR THE BARGE IS AS FOLLOWS. (I) SURFACE PREPARATION BY ULTRA-HYDROJET PRESSURE AND VACCUM BLASTING TO SA 2.5 STANDARD. (II) ONE COAT OF PRIMER INTERGARD 269.DFT 50 MICRON.(N8010-P009678). (III) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(ALUMINIUM). DFT 150 MICRON. (N8010-P061977). (IV) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(BRONZE). DFT 150 MICRON. (N8010-P061944). (V) ONE COAT OF TIE COAT INTERGARD 263. DFT 125 MICRON. (N8010-P009601). (VI) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (VII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (DARK RED). DFT 150 MICRON. (N8010-P009603). (VIII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (IX) ONE COAT OF ANTIFOULING(BOOT TOP) INTERSMOOTH 360 (BLACK). DFT 150 MICRON. (N8010-P009604). SERVICE COST.
UNDER WATER AREA:- BARGE TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INSPECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. PAINT SCHEME FOR THE BARGE IS AS FOLLOWS. (I) SURFACE PREPARATION BY ULTRA-HYDROJET PRESSURE AND VACCUM BLASTING TO SA 2.5 STANDARD . (II) ONE COAT OF PRIMER INTERGARD 269.DFT 50 MICRON.(N8010-P009678). (III) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(ALUMINIUM). DFT 150 MICRON. (N8010-P061977). (IV) ONE COAT OF ANTICORROSIVE INTERSHIELD 300(BRONZE). DFT 150 MICRON. (N8010-P061944). (V) ONE COAT OF TIE COAT INTERGARD 263. DFT 125 MICRON. (N8010-P009601). (VI) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (VII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (DARK RED). DFT 150 MICRON. (N8010-P009603). (VIII) ONE COAT OF ANTIFOULING INTERSMOOTH 360 (BROWN). DFT 150 MICRON. (N8010-P009602). (IX) ONE COAT OF ANTIFOULING(BOOT TOP) INTERSMOOTH 360 (BLACK). DFT 150 MICRON. (N8010-P009604). MATERIAL COST.
WEATHER DECKS:- TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) ONE COAT OF INTERGARD PRIMER 269 TO ACHIEVE DFT OF 50 MICRON. (III) ONE COAT OF INTERSHIELD 300 TO ACHIEVE A DRY FILM THICKNESS OF 200 MICRONS. (IV) ONE COAT OF INTERSHIELD 852 TO ACHIEVE A DRY FILM THICKNESS OF 800 MICRONS. SERVICE COST
WEATHER DECKS:- TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) ONE COAT OF INTERGARD PRIMER 269 TO ACHIEVE DFT OF 50 MICRON. (III) ONE COAT OF INTERSHIELD 300 TO ACHIEVE A DRY FILM THICKNESS OF 200 MICRONS. (IV) ONE COAT OF INTERSHIELD 852 TO ACHIEVE A DRY FILM THICKNESS OF 800 MICRONS. MATERIAL COST.
GENERAL SURFACES IN DRY COMPARTMENT INCLUDING INTERNAL DECKHEAD AND BULKHEAD TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE TO BE PREPARED TO ST-3 STANDARD. (II) ONE COAT OF EPOXY RED OXIDE PRIMER TO ACHIEVE A DRY FILM THICKNESS OF 50 MICRONS. (III) TWO COATS OF FR WHITE PAINT TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. SERVICE COST
GENERAL SURFACES IN DRY COMPARTMENT INCLUDING INTERNAL DECKHEAD AND BULKHEAD TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS.:- (I) SURFACE TO BE PREPARED TO ST-3 STANDARD. (II) ONE COAT OF EPOXY RED OXIDE PRIMER TO ACHIEVE A DRY FILM THICKNESS OF 50 MICRONS. (III) TWO COATS OF FR WHITE PAINT TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. MATERIAL COST
CABLE LOCKER AND FORE PEAK TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURAFACE PREPARATION TO SA 2.5 STANDARD GRIT BLASTING.(II) PRISMATIC UNIVERSAL, ALUMINIUM / RT TO ACHIEVE DRY FILM THICKNESS OF 150 MICRONS. (III) PRISMATIC UNIVERSAL, ALUMINIUM TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. SERVICE COST.
CABLE LOCKER AND FORE PEAK TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURAFACE PREPARATION TO SA 2.5 STANDARD GRIT BLASTING.(II) PRISMATIC UNIVERSAL, ALUMINIUM / RT TO ACHIEVE DRY FILM THICKNESS OF 150 MICRONS. (III) PRISMATIC UNIVERSAL, ALUMINIUM TO ACHIEVE A DRY FILM THICKNESS OF 150 MICRONS. MATERIAL COST.
SHIP SIDE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & QC(HULL) AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. SERVICE COST.
SHIP SIDE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & QC(HULL) AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040(BLACK) TO ACHIEVE ADRY FILM THICKNESS OF 40 MICRONS. MATERIAL COST.
SUPERSTRUCTURE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. SERVICE COST.
SUPERSTRUCTURE TO BE PAINTED WITH JOTUN PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. :- I) SURFACE PREPARATION SA 2.5 STANDARD. (II) PILOT PRIMER, RED TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (III) PILOT PRIMER, GREY TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (IV) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. (V) CORREX, RAL 7040 (BLACK) TO ACHIEVE A DRY FILM THICKNESS OF 40 MICRONS. MATERIAL COST
FUEL TANK / LUB OIL TANK / FODS TANK / DIRTY OIL TANK /SLUDGE TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS OF ST3. FUEL OIL AND LUB OIL TANKS TO BE SMEARED WITH OM 750.:- I) TO BE THOROUGHLY CLEANED AND DRIED. (II) APPLY THREE COATS OF ANTI-CORROSIVE PAINT (INTERLINE 704 / N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (TANKGUARD HB CLASSIC/ N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COAT OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720/ N8010-007655) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. SERVICE COST
FUEL TANK / LUB OIL TANK / FODS TANK / DIRTY OIL TANK /SLUDGE TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS OF ST3. FUEL OIL AND LUB OIL TANKS TO BE SMEARED WITH OM 750.:- I) TO BE THOROUGHLY CLEANED AND DRIED. (II) APPLY THREE COATS OF ANTI-CORROSIVE PAINT (INTERLINE 704 / N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (TANKGUARD HB CLASSIC/ N8010-007655) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COAT OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720/ N8010-007655) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. MATERIAL COST
ENGINE ROOM BILGES / STORE BILGES / VOID SPACES / COFFERDAM / FOREPEAK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION ST 3. (II) INTERGARD 269 - 50 MICRON. (III) INTERSHIELD 300 (ALUMINIUM) - 1 X 150 MICRONS.(IV) INTERSHIELD 300 (BRONZE) - 1 X 150 MICRONS. SERVICE COST.
ENGINE ROOM BILGES / STORE BILGES / VOID SPACES / COFFERDAM / FOREPEAK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION ST 3. (II) INTERGARD 269 - 50 MICRON. (III) INTERSHIELD 300 (ALUMINIUM) - 1 X 150 MICRONS.(IV) INTERSHIELD 300 (BRONZE) - 1 X 150 MICRONS. MATERIAL COST.
FRESH WATER TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) TWO COATS OF ANTI-CORROSIVE PAINT (INTERLINE 850 / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (PENGUARD HB / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720 / N8010-007652) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. SERVICE COST.
FRESH WATER TANK TO BE PAINTED WITH AKZO NOBAL PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. (I) SURFACE PREPARATION SA 2.5 STANDARD. (II) TWO COATS OF ANTI-CORROSIVE PAINT (INTERLINE 850 / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (PENGUARD HB / N8010-007652) TO ACHIEVE MINIMUM DFT OF 300 MICRONS OR APPLY TWO COATS OF ANTI-CORROSIVE PAINT (SIGMAGUARD 720 / N8010-007652) TO ACHIEVE A MINIMUM DFT OF 300 MICRONS. MATERIAL COST.
DECKS AND DADOES OF DRY COMPARTMENT TO BE PAINTED WITH MENTIONED PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. I) SURFACE PREPARATION OF ST 3 STANDARD. (II) TWO COATS OF DS CAT NO 8010-000113 YELLOW ZINC CHROMATE PRIMER. (III) TWO COATS OF DS CAT NO 8010-000298 MIDDLE BROWN FINISHING TO SHADE NO 411 TO IS 5 OR DS CAT NO 8010-000299 MIDDLE BURNS WICK GREEN FINISHING PAINT TO SHADE NO 266 OF IS 5. SERVICE COST.
DECKS AND DADOES OF DRY COMPARTMENT TO BE PAINTED WITH MENTIONED PAINT SCHEME IN PRESENCE OF PAINT OEM & INPSECTING AGENCY AND A CERTIFICATE TO BE OBTAINED FROM THE PAINT OEM FOR APPLICATION PROCEDURE AFTER EACH AND EVERY COAT INCLUDING SURFACE PREPARATIONS. I) SURFACE PREPARATION OF ST 3 STANDARD. (II) TWO COATS OF DS CAT NO 8010-000113 YELLOW ZINC CHROMATE PRIMER. (III) TWO COATS OF DS CAT NO 8010-000298 MIDDLE BROWN FINISHING TO SHADE NO 411 TO IS 5 OR DS CAT NO 8010-000299 MIDDLE BURNS WICK GREEN FINISHING PAINT TO SHADE NO 266 OF IS 5. MATERIAL COST.
SERVICEABILITY CHECKS AND REFILLING OF FOLLOWING EXTINGUISHERS. A) 9 LT AFFF EXTINGUISHERS - 08 NOS. B) 10 KGS DCP EXTINGUISHER - 03 NOS. C) 2 KGS CO2 EXTINGUISHER - 08 NOS. SERVICE COST.
SERVICEABILITY CHECKS AND REFILLING OF FOLLOWING EXTINGUISHERS. A) 9 LT AFFF EXTINGUISHERS - 08 NOS. B) 10 KGS DCP EXTINGUISHER - 03 NOS. C) 2 KGS CO2 EXTINGUISHER - 08 NOS. MATERIAL COST.
02 IN NOS GREAVES ENGINE NOT WORKING. DISMANTLE INTAKE AND EXHAUST MANIFOLD. CHECK ALL CYLINDER AND PROVE THE SYSTEM. SERVICE COST
02 IN NOS GREAVES ENGINE NOT WORKING. DISMANTLE INTAKE AND EXHAUST MANIFOLD. CHECK ALL CYLINDER AND PROVE THE SYSTEM. MATERIAL COST
DIESEL ALTERNATORS. MAKE: CUMMINS. MODEL: NT-743. CARRY OUT 1500 HOURLY ROUTINES. RENEW ALL SENSORS WITH CABLING AND GAUGES. CHEMICAL CLEANING OF COOLERS. PROVE THE SYSTEM ONBOARD FOR OPTIMUM PERFORMANCE. SERVICE COST.
DIESEL ALTERNATORS. MAKE: CUMMINS. MODEL: NT-743. CARRY OUT 1500 HOURLY ROUTINES. RENEW ALL SENSORS WITH CABLING AND GAUGES. CHEMICAL CLEANING OF COOLERS. PROVE THE SYSTEM ONBOARD FOR OPTIMUM PERFORMANCE. MATERIAL COST
OVERHAUL OF 60TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. SERVICE COST.
OVERHAUL OF 60TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. MATERIAL COST
OVERHAUL OF 37TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: MODY, TYPE: DC8Y-DE. SERVICE COST.
OVERHAUL OF 37TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: MODY, TYPE: DC8Y-DE. MATERIAL COST
OVERHAUL OF 20TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. SERVICE COST.
OVERHAUL OF 20TPH DIESEL DRIVEN SULLAGE PUMP INCLUDING ENGINE. RENEW PUMP BEARINGS AND SEALS. CHECK IMPELLER AND BODY. RENEW IF FOUND BER. CARRYOUT 3000 HOURLY ROUTINES OF THE ENGINE. RENEW ALL GAUGES AND SENSORS. PUMP-MAKE: BE PUMP MODEL: SH80-140-NI-DGS2-316. ENGINE- MAKE: GREAVES COTTON LTD. MODEL: 3G NNA. MATERIAL COST
REPAIR 20TPH SUBMERSIBLE PUMP. MAKE: MODY. SERVICE COST.
REPAIR 20TPH SUBMERSIBLE PUMP. MAKE: MODY. MATERIAL COST
RENEW 01 IN NO 40TPH AND 02 IN NOS 20 TPH SUBMERSIBLE PUMP WITH STARTER AND 100M CABLE. MAKE: MODY. SERVICE COST
RENEW 01 IN NO 40TPH AND 02 IN NOS 20 TPH SUBMERSIBLE PUMP WITH STARTER AND 100M CABLE. MAKE: MODY. MATERIAL COST
FOLLOWING SYSTEM PIPES TO BE REMOVED, REPAIRED ALONG WITH THE END FITTINGS (IF REQUIRED MAT FOR END FITTING FOR MS GALV. PIPES - MS AND FOR CUNI PIPES - BRASS), PRESSURE TESTED, COLOURED AS PER COLOUR CODE, REFITTED AND PROVED THE SYSTEM FOR OPTIMUM PERFORMANCE. (A) MAIN SEA SUCTION PIPE TO BE REPAIRED DIA APPROX - 200 MM (OD 219 X THK 5.4 MM), LENGTH -APPROX - 04 MTRS, NOS OF FLANGES - 14, MATERIAL FOR PIPE - MS GALV (IS-3589 OR ASTM A-106, GR-B), FLANGES-MS, TP-3.5 KG/SQ.CM. (B) DG SEA SUCTION PIPE, DIA -50MM LENGTH APPROX - 15 MTRS, QTY - 08, MAT- MS GALV. TP-3.5 KG/SQ.CM. (C) DECK CONNECTION FILLING PIPES / AIR VENT PIPES OF VARIOUS TANKS UPROUTING FROM UPPER DECK TO BE RENEWED IF REQUIRED, DIA APPROX - 40MM TO 60 MM, LENGTH APPROX - 10 MTRS, QTY-20, MAT-MS, TP-3.5 KG/SQ.CM. (D) FUEL SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM.( E) LO SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM. (F) FW PUMP DISCHARGE PIPES, DIA-40MM, LENGTH APPROX-05 MTR, QTY-02, MAT-CUNI, TP-3.5 KG/SQ.CM. SERVICE COST
FOLLOWING SYSTEM PIPES TO BE REMOVED, REPAIRED ALONG WITH THE END FITTINGS (IF REQUIRED MAT FOR END FITTING FOR MS GALV. PIPES - MS AND FOR CUNI PIPES - BRASS), PRESSURE TESTED, COLOURED AS PER COLOUR CODE, REFITTED AND PROVED THE SYSTEM FOR OPTIMUM PERFORMANCE. (A) MAIN SEA SUCTION PIPE TO BE REPAIRED DIA APPROX - 200 MM (OD 219 X THK 5.4 MM), LENGTH -APPROX - 04 MTRS, NOS OF FLANGES - 14, MATERIAL FOR PIPE - MS GALV (IS-3589 OR ASTM A-106, GR-B), FLANGES-MS, TP-3.5 KG/SQ.CM. (B) DG SEA SUCTION PIPE, DIA -50MM LENGTH APPROX - 15 MTRS, QTY - 08, MAT- MS GALV. TP-3.5 KG/SQ.CM. (C) DECK CONNECTION FILLING PIPES / AIR VENT PIPES OF VARIOUS TANKS UPROUTING FROM UPPER DECK TO BE RENEWED IF REQUIRED, DIA APPROX - 40MM TO 60 MM, LENGTH APPROX - 10 MTRS, QTY-20, MAT-MS, TP-3.5 KG/SQ.CM. (D) FUEL SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM.( E) LO SYSTEM PIPES, DIA - 32/20 MM, LENGTH APPROX - 12 MTR, QTY - 06, MAT-MS, TP- 10.5 KG/SQ.CM. (F) FW PUMP DISCHARGE PIPES, DIA-40MM, LENGTH APPROX-05 MTR, QTY-02, MAT-CUNI, TP-3.5 KG/SQ.CM. MATERIAL COST
FOLLOWING SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED(PT) AND REFITTED. MAT-GM. (A) FIRE MAIN SYSTEM (SDSL) VALVES (PT:15.5 KG/SQ.CM.), DIA 100MM, QTY -05 NOS. (B) EMERGENCY COOLING VALVES FOR DG (PT:4.5 KG/SQ.CM), DIA 50MM, QTY - 02 NOS. (C)FIRE HYDRANT VALVES (PT: 10.5 KG/SQ.CM), DIA 65 MM, QTY -05 NOS. (D) FUEL SUCTION QUICK CLOSING VALVES (PT: 3.5 KG/SQ.CM), DIA 40MM, QTY -02 NOS. (E) FUEL SUPPLY QUICK CLOSING VALVES (PT-3.5 KG/SQ.CM), DIA-20MM, QTY - 02 NOS. (F) FUEL DRAIN VALVES SELF CLOSING TYPE (PT:3.5 KG/SQ.CM), DIA 15MM, QTY - 02 NOS. (G) LUB / FUEL OIL SYSTEM VALVES (PT:3.5KG/SQ.CM), DIA 20 MM, QTY - 02 NOS. SERVICE COST.
FOLLOWING SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED(PT) AND REFITTED. MAT-GM. (A) FIRE MAIN SYSTEM (SDSL) VALVES (PT:15.5 KG/SQ.CM.), DIA 100MM, QTY -05 NOS. (B) EMERGENCY COOLING VALVES FOR DG (PT:4.5 KG/SQ.CM), DIA 50MM, QTY - 02 NOS. (C)FIRE HYDRANT VALVES (PT: 10.5 KG/SQ.CM), DIA 65 MM, QTY -05 NOS. (D) FUEL SUCTION QUICK CLOSING VALVES (PT: 3.5 KG/SQ.CM), DIA 40MM, QTY -02 NOS. (E) FUEL SUPPLY QUICK CLOSING VALVES (PT-3.5 KG/SQ.CM), DIA-20MM, QTY - 02 NOS. (F) FUEL DRAIN VALVES SELF CLOSING TYPE (PT:3.5 KG/SQ.CM), DIA 15MM, QTY - 02 NOS. (G) LUB / FUEL OIL SYSTEM VALVES (PT:3.5KG/SQ.CM), DIA 20 MM, QTY - 02 NOS. MATERIAL COST
CLEAN, PRESSURE TEST AND REPAINT CO2 CYLINDERS. CHECK CO2 SYSTEM, RENEW DEFECTIVE GAUGES AND PROVE THE SYSTEM ONBOARD (BOTH LOCAL AND REMOTE) FOR OPTIMUM PERFORMANCE. MAKE: M/S SHM SHIPCARE. SERVICE COST
CLEAN, PRESSURE TEST AND REPAINT CO2 CYLINDERS. CHECK CO2 SYSTEM, RENEW DEFECTIVE GAUGES AND PROVE THE SYSTEM ONBOARD (BOTH LOCAL AND REMOTE) FOR OPTIMUM PERFORMANCE. MAKE: M/S SHM SHIPCARE. MATERIAL COST
RENEW TANK CONTENT GAUGE. MAKE: NIVO CONTROL PVT LTD. SERVICE COST.
RENEW TANK CONTENT GAUGE. MAKE: NIVO CONTROL PVT LTD. MATERIAL COST
RENEW FLOWMETER. MAKE: M/S ROCKWIN. SERVICE COST.
RENEW FLOWMETER. MAKE: M/S ROCKWIN. MATERIAL COST
OVERHAUL HAND PUMP. MAKE: M/S VENUS PUMP & ENGINEERING WORK. REPLACE GASKET, GLAND AND BEARING. SERVICE COST.
OVERHAUL HAND PUMP. MAKE: M/S VENUS PUMP & ENGINEERING WORK. REPLACE GASKET, GLAND AND BEARING. MATERIAL COST
20 KVA, 415V, 3PH, 50HZ ALTERNATOR TO BE OVERHAULED AND LOAD TRIALS TO BE CARRIED OUT AS PER STANDARD NORMS. ALTERNATOR MAKE: CROMPTON GREAVES. 1) CHECK INSULATION OF WINDINGS. 2) IMPROVE INSULATION OR RENEW WINDINGS IF REQUIRED. 3) RENEW BEARING DE & NDE. 4) REPLACE AVR. SERVICE COST.
20 KVA, 415V, 3PH, 50HZ ALTERNATOR TO BE OVERHAULED AND LOAD TRIALS TO BE CARRIED OUT AS PER STANDARD NORMS. ALTERNATOR MAKE: CROMPTON GREAVES. 1) CHECK INSULATION OF WINDINGS. 2) IMPROVE INSULATION OR RENEW WINDINGS IF REQUIRED. 3) RENEW BEARING DE & NDE. 4) REPLACE AVR. MATERIAL COST
OVERHAUL, REPAIR AND PROVE MAIN SWITCH BOARD ONBOARD. RENEW FOLLOWING:- (A) 3- PHASE, 100AMPS,CIRCUIT BREAKER, MAKE: SCHNEIDERELECT., MSB MAKE:- PR ENETRPRISE. QTY - 04 NOS. (B) VOLTMETER: 0 TO 500 V. QTY - 03 NOS (C) VOLTMETER: 0 TO 300 V. QTY -01 NOS. (D) HZ METER: 45 TO 55. QTY -03 NOS (E) POWER FACTOR METER: 0.5-1-0.5. QTY - 03 NOS (F) KW METER: 0 TO 30 QTY - 01 NOS (G) KW METER: 0 TO 12. QTY - 01 NOS (H) AMMETER: 0-50. QTY - 02 NOS (J) AMMETER: 0-30. QTY - 02 NOS (K) 3- PHASE, 3 POLE, MCCB- 10 AMPS. QTY - 06 NOS (L) 3- PHASE, 3 POLE, MCCB- 16 AMPS. QTY - 02 NOS (M) 3- PHASE, 3 POLE, MCCB- 20AMPS. QTY - 02 NOS (N) 2- POLE, MCCB- 06 AMPS. QTY - 05 NOS. SERVICE COST.
OVERHAUL, REPAIR AND PROVE MAIN SWITCH BOARD ONBOARD. RENEW FOLLOWING:- (A) 3- PHASE, 100AMPS,CIRCUIT BREAKER, MAKE: SCHNEIDERELECT., MSB MAKE:- PR ENETRPRISE. QTY - 04 NOS. (B) VOLTMETER: 0 TO 500 V. QTY - 03 NOS (C) VOLTMETER: 0 TO 300 V. QTY -01 NOS. (D) HZ METER: 45 TO 55. QTY -03 NOS (E) POWER FACTOR METER: 0.5-1-0.5. QTY - 03 NOS (F) KW METER: 0 TO 30 QTY - 01 NOS (G) KW METER: 0 TO 12. QTY - 01 NOS (H) AMMETER: 0-50. QTY - 02 NOS (J) AMMETER: 0-30. QTY - 02 NOS (K) 3- PHASE, 3 POLE, MCCB- 10 AMPS. QTY - 06 NOS (L) 3- PHASE, 3 POLE, MCCB- 16 AMPS. QTY - 02 NOS (M) 3- PHASE, 3 POLE, MCCB- 20AMPS. QTY - 02 NOS (N) 2- POLE, MCCB- 06 AMPS. QTY - 05 NOS. MATERIAL COST.
RENEW CONTROL TRANSFORMER. MAKE: INDUSHREE, INPUT- 415V OUTPUT 220V:- (I) 04 IN NOS 100 VA. (II) 01 IN NOS 200 VA. SERVICE COST.
RENEW CONTROL TRANSFORMER. MAKE: INDUSHREE, INPUT- 415V OUTPUT 220V:- (I) 04 IN NOS 100 VA. (II) 01 IN NOS 200 VA. MATERIAL COST.
RENEW (I) CREW ACCOMMODATION VENTILATION BLOWER MOTOR 230V,3PH, 1HP. QTY - 1 NOS (II) PUMP ROOM EXHAUST FAN MOTOR, 3PH, 415V, 1HP. QTY - 1 NOS (III) STP PLANT MOTOR 3PH, 2.2 KW. QTY - 2 NOS (IV) E/R VENTILATION BLOWER MOTOR STARTER 3PH. QTY - 1 NOS (V) PUMP ROOM EXHAUST FAN MOTOR STARTER 3 PH. QTY - 01 NOS. SERVICE COST.
RENEW (I) CREW ACCOMMODATION VENTILATION BLOWER MOTOR 230V,3PH, 1HP. QTY - 1 NOS (II) PUMP ROOM EXHAUST FAN MOTOR, 3PH, 415V, 1HP. QTY - 1 NOS (III) STP PLANT MOTOR 3PH, 2.2 KW. QTY - 2 NOS (IV) E/R VENTILATION BLOWER MOTOR STARTER 3PH. QTY - 1 NOS (V) PUMP ROOM EXHAUST FAN MOTOR STARTER 3 PH. QTY - 01 NOS. MATERIAL COST
O/H BATTERY CHARGER CUM DC DISTRIBUTION BOARD, MAKE: PR ENTERPRISE AND PROVE ON BOARD FOR OPTIMUM PERFORMANCE. SERVICE COST.
O/H BATTERY CHARGER CUM DC DISTRIBUTION BOARD, MAKE: PR ENTERPRISE AND PROVE ON BOARD FOR OPTIMUM PERFORMANCE. MATERIAL COST.
NAVIGATION PANEL 230V AND 24V WITH 07 IN NO. EACH NAVIGATION LIGHT CONTROL PCB TO BE OVERHAULED, REPAIRED AND TESTED ONBOARD. ALL LIGHT FITTINGS TO BE REPLACED. SERVICE COST.
NAVIGATION PANEL 230V AND 24V WITH 07 IN NO. EACH NAVIGATION LIGHT CONTROL PCB TO BE OVERHAULED, REPAIRED AND TESTED ONBOARD. ALL LIGHT FITTINGS TO BE REPLACED. MATERIAL COST
220V WINDOW WIPER MOTOR WITH ASSEMBLY TO BE REPLACED, OVERHAULED AND TESTED ONBOARD. MAKE: SPEIOH, GERMANY. SERVICE COST.
220V WINDOW WIPER MOTOR WITH ASSEMBLY TO BE REPLACED, OVERHAULED AND TESTED ONBOARD. MAKE: SPEIOH, GERMANY. MATERIAL COST
FOLLOWING PANELS TO BE OVERHAULED, REPAIRED AND TO BE TESTED ON LOAD: (A) FIRE DETECTION CUM CO2 PANEL-01 NO. MAKE: FIRE DEFENCE. (B) SLUDGE TANK INDICATOR PANEL-01 NO. MAKE: NIVO CONTROL PVT. LTD. INDIA, INDORE. (C) I.V CONVERTOR 230V AC, 50HZ - 01 NOS. SERVICE COST.
FOLLOWING PANELS TO BE OVERHAULED, REPAIRED AND TO BE TESTED ON LOAD: (A) FIRE DETECTION CUM CO2 PANEL-01 NO. MAKE: FIRE DEFENCE. (B) SLUDGE TANK INDICATOR PANEL-01 NO. MAKE: NIVO CONTROL PVT. LTD. INDIA, INDORE. (C) I.V CONVERTOR 230V AC, 50HZ - 01 NOS. MATERIAL COST
SHIELDED SHORE SUPPLY CABLE TO BE PROVIDED 3 CORE X 16 SQ MM. SERVICE COST.
SHIELDED SHORE SUPPLY CABLE TO BE PROVIDED 3 CORE X 16 SQ MM. MATERIAL COST
RENEW FOLLOWING ITEMS:- (A) 15/5 AMPS MULTI-PIN SOCKET - 25 NOS. (B) 15 AMPS SWITCH - 15 NOS. (C) MINI TUBELIGHT FOR BED SIDE, 230V - 04 NOS. (D) CFL 20W (ACCOM.) - 8 NOS. (E) CFL 10W (TOILET). - 2 NOS (F) 20W TWIN TUBE LIGHT FITTING. - 12 NOS. (G) DECK SIDE LIGHT FITTING 230V. - 20 NOS. (H) EMERGENCY 24V LIGHT FITTING. - 12 NOS. SERVICE COST.
RENEW FOLLOWING ITEMS:- (A) 15/5 AMPS MULTI-PIN SOCKET - 25 NOS. (B) 15 AMPS SWITCH - 15 NOS. (C) MINI TUBELIGHT FOR BED SIDE, 230V - 04 NOS. (D) CFL 20W (ACCOM.) - 8 NOS. (E) CFL 10W (TOILET). - 2 NOS (F) 20W TWIN TUBE LIGHT FITTING. - 12 NOS. (G) DECK SIDE LIGHT FITTING 230V. - 20 NOS. (H) EMERGENCY 24V LIGHT FITTING. - 12 NOS. MATERIAL COST.
RENEW FOLLOWING:- (A) 01 CFL LAMP, 18W WITH FITTING AND 1 TWO WAY ON/OFF SWITCH IN BATTERY STORE - 02 NOS. (B) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN NAVAL STORE - 03 NOS. (C) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET IN DECK STORE - 02 NOS. (D) 01 24V DC LIGHT FITTING; 1 LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN PUMP STORE - 04 NOS. (E) 01 24 V DC LIGHT FITTING; 3 LAMP FITTING; 4 TWIN TUBE LIGHT FITTING 20W EACH AND 2 TWO WAY ON/OFF SWITCH IN PUMP ROOM - 12 NOS. (F) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CO2 STORE - 03 NOS. (G) 01 24V DC LIGHT FITTING; 3 CFL 18W AND LAMP FITTING AND 7 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CREW ACCOMMODATION - 12 NOS. (H) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW BATHROOM - 04 NOS. (J) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW LOBBY - 03 NOS. (K) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 COMBINED AND 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN STGR COMPT - 05 NOS. (L) 01 24V DC LIGHT FITTING; 4 CFL 18W LAMP WITH FITTING IN DECK PASSAGE - 06 NOS. (M) 01 24V DC LIGHT FITTING; 3 CFL 18W WITH LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN WHEEL HOUSE - 05 NOS. (N) 01 24V DC LIGHT; 4 CFL LAMP, 18W WITH LAMP FITTING IN UPPER DECK - 05 NOS. (P) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 14-27 COMPT - 03 NOS. (Q) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 27-40 COMPT - 03 NOS. (R) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 40-54 COMPT - 03 NOS. (S) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 54-58 COMPT - 03 NOS. SERVICE COST.
RENEW FOLLOWING:- (A) 01 CFL LAMP, 18W WITH FITTING AND 1 TWO WAY ON/OFF SWITCH IN BATTERY STORE - 02 NOS. (B) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN NAVAL STORE - 03 NOS. (C) 01 CFL LAMP, 18W WITH FITTING; 1 COMBINED SWITCH WITH SOCKET IN DECK STORE - 02 NOS. (D) 01 24V DC LIGHT FITTING; 1 LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN PUMP STORE - 04 NOS. (E) 01 24 V DC LIGHT FITTING; 3 LAMP FITTING; 4 TWIN TUBE LIGHT FITTING 20W EACH AND 2 TWO WAY ON/OFF SWITCH IN PUMP ROOM - 12 NOS. (F) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CO2 STORE - 03 NOS. (G) 01 24V DC LIGHT FITTING; 3 CFL 18W AND LAMP FITTING AND 7 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CREW ACCOMMODATION - 12 NOS. (H) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW BATHROOM - 04 NOS. (J) 01 24V DC LIGHT FITTING; 1 CFL 18W AND LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN CREW LOBBY - 03 NOS. (K) 01 24V DC LIGHT FITTING; 2 CFL 18W AND LAMP FITTING AND 1 COMBINED AND 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN STGR COMPT - 05 NOS. (L) 01 24V DC LIGHT FITTING; 4 CFL 18W LAMP WITH FITTING IN DECK PASSAGE - 06 NOS. (M) 01 24V DC LIGHT FITTING; 3 CFL 18W WITH LAMP FITTING AND 1 TWO WAY ON/OFF SWITCH IN WHEEL HOUSE - 05 NOS. (N) 01 24V DC LIGHT; 4 CFL LAMP, 18W WITH LAMP FITTING IN UPPER DECK - 05 NOS. (P) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 14-27 COMPT - 03 NOS. (Q) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 27-40 COMPT - 03 NOS. (R) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 40-54 COMPT - 03 NOS. (S) 01 CFL 18W LAMP FITTING; 1 COMBINED SWITCH WITH SOCKET AND 1 TWO WAY ON/OFF SWITCH IN CL VOID FR 54-58 COMPT - 03 NOS. MATERIAL COST.
O/H, REPAIR AND TEST ONLOAD E/R LIGHTING TRANSFORMER BANK. CAPACITY 6 KVA=2KVA X 3+1 SPARE, I/P-415 V,3PH, 50HZ. MAKE: AUTOMATIC ELECTRONIC CONTROLS MFG.CO. RENEW FOLLOWING:- (A) 3-POLE MCCB- 32AMPS - 01 NOS. (B) INDICATING LAMP - 03 NOS. (C) 3-POLE MCCB- 10 AMPS - 03 NOS. SERVICE COST
O/H, REPAIR AND TEST ONLOAD E/R LIGHTING TRANSFORMER BANK. CAPACITY 6 KVA=2KVA X 3+1 SPARE, I/P-415 V,3PH, 50HZ. MAKE: AUTOMATIC ELECTRONIC CONTROLS MFG.CO. RENEW FOLLOWING:- (A) 3-POLE MCCB- 32AMPS - 01 NOS. (B) INDICATING LAMP - 03 NOS. (C) 3-POLE MCCB- 10 AMPS - 03 NOS. MATERIAL COST
REPAIR/ RENEW AND TEST INTERCOM CONTROL UNIT WITH HAND SET OF TELEPHONE EXCHANGE PHONE SOCKET BETWEEN ELECTRICAL CONTROL ROOM, PUMP ROOM, CREW ACCOM. AND WHEEL HOUSE. MAKE - TELEMATICS. SERVICE COST.
REPAIR/ RENEW AND TEST INTERCOM CONTROL UNIT WITH HAND SET OF TELEPHONE EXCHANGE PHONE SOCKET BETWEEN ELECTRICAL CONTROL ROOM, PUMP ROOM, CREW ACCOM. AND WHEEL HOUSE. MAKE - TELEMATICS. MATERIAL COST.
PROVIDE 12V, 200AH (MAKE : EXIDE) LEAD ACID BATTERIES WITH OEM WARRANTY CERTIFICATE. TEST ONBOARD ON LOAD DURING TRIALS. SERVICE COST.
PROVIDE 12V, 200AH (MAKE : EXIDE) LEAD ACID BATTERIES WITH OEM WARRANTY CERTIFICATE. TEST ONBOARD ON LOAD DURING TRIALS. MATERIAL COST.
RENEW FOLLOWING ITEMS OF 20KVA ALTERNATOR ENGINE:- 01 IN NO. 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 01 IN NO 12V BATTERY CHARGING ALTERNATOR; 01 IN NO 12V DC INDICATING LAMP; 01 IN NO 50-0-50 AMMETER AND 01 IN NO START/STOP PUSH BUTTON/SWITCH. SERVICE COST.
RENEW FOLLOWING ITEMS OF 20KVA ALTERNATOR ENGINE:- 01 IN NO. 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 01 IN NO 12V BATTERY CHARGING ALTERNATOR; 01 IN NO 12V DC INDICATING LAMP; 01 IN NO 50-0-50 AMMETER AND 01 IN NO START/STOP PUSH BUTTON/SWITCH. MATERIAL COST.
RENEW FOLLOWING ITEMS OF SLUDGE DIESEL PUMP I AND II ENGINE IN PUMP ROOM:- 02 IN NO KEY SWITCH; 02 IN NO 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 02 IN NO 12V BATTERY CHARGING ALTERNATOR; 02 IN NO 12V DC INDICATING LAMP; 02 IN NO 50-0-50 AMMETER. SERVICE COST.
RENEW FOLLOWING ITEMS OF SLUDGE DIESEL PUMP I AND II ENGINE IN PUMP ROOM:- 02 IN NO KEY SWITCH; 02 IN NO 12V SELF STARTER, MAKE: LUCAS TVS AND BOSCH; 02 IN NO 12V BATTERY CHARGING ALTERNATOR; 02 IN NO 12V DC INDICATING LAMP; 02 IN NO 50-0-50 AMMETER. MATERIAL COST.
RENEW, TEST AND PROVE FOLLOWING ITEMS ONBOARD:- A) 230V WIND SCREEN WIPER WITH SWITCH PANEL. MAKE: SPEICH GENEVA, ITALY - 02 NOS. (B) GENERAL ALARM PUSH BUTTON STATION TO 05 NOS GONG BELL/HORN. (C) EVAC SANITARY SYSTEM PANEL- 01 NO MAKE: EVAC DY HELSENKI, FINLAND - 01 NOS. (D) TWIN TUBE LIGHT FITTING NAME BOARD - 01 NOS. (E) 220V / 400W FLOOD LIGHT WITH CONTROL GEAR BOX - 01 NOS (F) ON UPPER DECK 415V, 3PH, 50HZ SUBMERSIBLE PUMP SWITCH/ SOCKETS - 04 NOS. SERVICE COST.
RENEW, TEST AND PROVE FOLLOWING ITEMS ONBOARD:- A) 230V WIND SCREEN WIPER WITH SWITCH PANEL. MAKE: SPEICH GENEVA, ITALY - 02 NOS. (B) GENERAL ALARM PUSH BUTTON STATION TO 05 NOS GONG BELL/HORN. (C) EVAC SANITARY SYSTEM PANEL- 01 NO MAKE: EVAC DY HELSENKI, FINLAND - 01 NOS. (D) TWIN TUBE LIGHT FITTING NAME BOARD - 01 NOS. (E) 220V / 400W FLOOD LIGHT WITH CONTROL GEAR BOX - 01 NOS (F) ON UPPER DECK 415V, 3PH, 50HZ SUBMERSIBLE PUMP SWITCH/ SOCKETS - 04 NOS. MATERIAL COST.
DOCKING IN VER- I & II FOR 30 DAYS AS PER DOCKING PLAN. JOINT INSP WITH PAINT OEM/ SS & INSP AGENCY. TO AND FRO TOWING FROM ND (MBI) TO SHIPYARD & BACK. SERVICE COST
QC COVERAGE BY IRS. SERVICE COST
VOYAGE INSURANCE OF THE VESSEL CONSIDERING COST OF VESSEL AS RS. 4.93 CRORES. SERVICE COST
WET BASIN/ WHARFAGE FACILITY FOR A DURATION OF 60 DAYS. SERVICE COST
MODEST INFRASTRUCTURE PVT. LTD.
CHOWGULE LAVGAN SHIPREPAIR PRIVATE LIMITED
CARE MARINE AND ALLIED SERVICES
SAGAR SHIP REPAIRERS AND MARINE SERVICES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid