Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC Agreement No 09/EE/2025-26 | |
| 2 | L2₹9.2 L+₹1,089.26 (0.12%)Rejected-Finance | L2 | Rejected-Finance L2 In Financial Bid | |
| 3 | L3₹9.3 L+₹8,679.60 (0.94%)Rejected-Finance | L3 | Rejected-Finance L3 In Financial Bid |
| Sl No | Description | Qty | Unit | PIYUSH CONTRACTORS L2 | M/S SAVERA BUILDCON L3 | SUKHAVINDER SINGH THEKEDAR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in ordinary soil for structure i/c all lead and req lift as per site requirement and proper disposal of earth as directed by engg.in charge | 172.09 | M3 | 110 ₹18,929.9 | 111 ₹19,101.99 | 109 ₹18,757.81 Lowest |
| 2.00 | Earth work in filling in all type of soil with all lift and lead upto 600m. Including ramming, dressing and manual compaction etc. all cost of earth and T&P etc.complete. | 487.5 | M3 | 199 ₹97,012.5 | 200 ₹97,500 | 198 ₹96,525 Lowest |
| 3.00 | Centering and shuttering for RCC work i/c all cost of labour and T&P etc. for complete for proper completion of work. | 27.75 | M2 | 679 ₹18,842.25 | 680 ₹18,870 | 678 ₹18,814.5 Lowest |
| 4.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 17.39 | M3 | 5,931 ₹1,03,140.09 | 5,940 ₹1,03,296.6 | 5,930 ₹1,03,122.7 Lowest |
| 5.00 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 55.02 | M3 | 5,428 ₹2,98,648.56 | 5,440 ₹2,99,308.8 | 5,427 ₹2,98,593.54 Lowest |
| 6.00 | Shuttering for PCC work i/c all cost of labour and T&P etc. for complete for proper completion of work. | 22.14 | M2 | 244 ₹5,402.16 | 250 ₹5,535 | 243 ₹5,380.02 Lowest |
| 7.00 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete | 12.32 | M3 | 7,357 ₹90,638.24 | 7,360 ₹90,675.2 | 7,356 ₹90,625.92 Lowest |
| 8.00 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 1.06 | MT | 96,264 ₹1,02,039.84 | 96,280 ₹1,02,056.8 | 96,263 ₹1,02,038.78 Lowest |
| 9.00 | P.C.C.1:6:12 including all cost of material, labour and T&P etccomplete. | 12.56 | M3 | 5,506 ₹69,155.36 | 5,520 ₹69,331.2 | 5,505 ₹69,142.8 Lowest |
| 10.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 36.42 | M2 | 105 ₹3,824.1 | 108 ₹3,933.36 | 104.5 ₹3,805.89 Lowest |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
25 Mar 2026, 3:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 04 CONSTRUCTION OF V.R.B AT KM 9.300 OF HANDALPUR MINOR OF MGC STAGE-II
2026_UPIDC_1120808_20
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹19,000
6 Apr 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation in foundation in ordinary soil for structure i/c all lead and req lift as per site requirement and proper disposal of earth as directed by engg.in charge | |||||
| 2Earth work in filling in all type of soil with all lift and lead upto 600m. Including ramming, dressing and manual compaction etc. all cost of earth and T&P etc.complete. | |||||
| 3Centering and shuttering for RCC work i/c all cost of labour and T&P etc. for complete for proper completion of work. | |||||
| 4Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | |||||
| 5M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | |||||
| 6Shuttering for PCC work i/c all cost of labour and T&P etc. for complete for proper completion of work. | |||||
| 7R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete | |||||
| 8Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | |||||
| 9P.C.C.1:6:12 including all cost of material, labour and T&P etccomplete. | |||||
| 10Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.87 MB
TD04.pdf
Tender Documents • 2.99 MB
Retenderlot04.pdf
Additional Documents • 0.50 MB
BOQ_2104466.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .