Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98 LAccepted-Finance 24 MISSION COMPOUND AJMER ROAD JAIPUR 302001 RAJ | JAIPUR | JAIPUR | RAJASTHAN | 302001 | L1 | Accepted-Finance Accept | |
| 2 | L2₹1.1 Cr+₹7 L (7.14%)Accepted-Finance | L2 | Accepted-Finance Accept | |
| 3 | L3₹1.2 Cr+₹21.4 L (21.8%)Accepted-Finance | L3 | Accepted-Finance Accept | |
| 4 | L4₹1.4 Cr+₹41.7 L (42.6%)Accepted-Finance | L4 | Accepted-Finance Accept |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
18 Feb 2020, 6:00 pmClosed
ACE (P), PHED, Region Churu
ACE (P), PHED, Region Churu
Operation and Maintenance of Kolayat Lift Canal Water Supply Project Package 01 KLC 01 District Bikaner for 3 years
2020_PHCJA_175554_1
04/2019-20
Open Tender
Miscellaneous Services
Item Wise
1095 days
Kolayat
Tender fee Proc Fee EMD Registration GST and certificate 1 to 3 and Tech document of as per TD
2 documents required · 2 mandatory
₹2,000
ACE(P), PHED, Region Churu/ MD RISL Jaipur
₹3.1 L
Yes
13 Mar 2020
28 Jan 2020
19 Feb 2020
28 Jan 2020
18 Feb 2020
28 Jan 2020
28 Jan 2020 - 6 Feb 2020
Amount
PART-A
Operation and Maintenance of all units of Kolayat Water Supply Project, package KLC-01 District Bikaner for 3 Years including round the clock O&M from outlet to ESRs to tail ends (PSP) i.e. consumers end including all related electrical, mechanical ,instrumentation, civil structures etc including administrative management, comprehensive operation, repairs, cost of lubricants,cost of chemical, consumables, spare parts etc. as per scope of work & specifications, terms and condition of contract (Excluding cost of power charges and Major spares as listed in special condition of contract) The approved total cost for 3 Years O&M shall be payable to the contractor, keeping yearly rate of increase as 5%. The rate should be quoted in increasing trend @5% per annum in case the rates are quoted in different manner the total cost for 3 Years as quoted by bidder shall be re appropriated accordingly while issuing work order.
For 12 Months of 1st year
For 12 months of 2nd year
For 12 months of 3rd year
Renewal / Replacement, renovation and repair of all civil, electrical, electromechanical, instrumentation works as per scope of work. The rates quoted for part B for major spares (Total for 3 years) should be at least 10% of total of part A and Part B otherwise total cost (Total part A and Part B) shall be re appropriated accordingly while issuing work order.
For Year 1 of O&M
For Year 2 of O&M
For Year 3 of O&M
Note 1- The rates should be quoted in increasing trend @5% per annum. In case, the rates are quoted in different manner, the total cost for 3 Years as quoted by bidder shall be re-appropriated accordingly while issuing work order 2- The rates quoted for part B '( Total for 3 Years) should be at least 10% of total of part À' and part 'B' otherwise total cost ( total of part À' and part 'B' ) shall be re-appropriated accordingly while issuing work order.
Dynamic Elecpower (P) td
KRISHAN AND COMPANY
B AND G CONSTRUCTIION CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .