Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.0 Cr+₹56.3 L (4.51%)Admitted-Finance 1036 B STREET 11 PATEL NAGAR GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L2 | Admitted-Finance | ||
| 3 | L3₹13.3 Cr+₹80.0 L (6.41%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹13.3 Cr+₹84.8 L (6.80%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹13.6 Cr+₹1.2 Cr (9.31%)Admitted-Finance 52 118 SECTOR 5 PRATAPNAGAR SANGANER JAIPUR 302033 | JAIPUR | RAJASTHAN | 302033 | L5 | Admitted-Finance |
Tender Value
₹14.3 Cr
EMD Value
₹28.7 L
Closing Date
20 Aug 2024, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Strengthening of road Kota Itawa Khatauli Shyopur (SH-70) in Km. 58/0 to 70/0 and 94/0 to 96/500 Distt Kota (Job No. CRIF / 1109 / RJ/ 2023-24)
2024_CEPWD_409242_3
ACE PWD ZONE KOTA NITNO-02-2024-25
Open Tender
Civil Works
Percentage
300 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE PWD DIV. ITAWA
₹28.7 L
ACE PWD ZONE KOTA
6 Sept 2024
27 Jul 2024
22 Aug 2024
27 Jul 2024
20 Aug 2024
27 Jul 2024
2 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Thorney Jungle | 7.7 | Per hectare | - | - |
| 2 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 18,433.8 | Per Cum | - | - |
| 3 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 6,871.5 | Per Cum | - | - |
| 4 | Milling of distressed road pavement Milling of distress bitumenous layer upto 70mm depth in a single pass with suitable milling machine (capable of milling @ 200&300 sqm of area per hr) fitted with loading conveyer of loading the filled material directly on the trucks i/c hauling and stock pilling the reclaiming to bring to required specification to reuse with the approval of engineer - in - charge for safe disposal; with all leads and lifts complete in all respect as directly by Engineer - in- charge.
*Note : The unutilized quality of reclaimed bituminous mix material shall be recovered. | 1,078 | Per Cum | - | - |
| 5 | Providing & laying DBM using the reclaimed to the extent of 30% cent of the required quanity after carrying out necessary checks and evaluation, adding fresh material including rejuvenation as required, grade, level and thickness, all as specified in clause 519. (5th revision) 2013 using bitumen of VG-30 (minimum bitumen's 4.50% i/c bitumen retrieved material as per job mix formula) using 100-200 TPH batch type hot mix plant with approprite arrangement for use of R.A.P. appropriable rollars and with hydraulic paver finisher with sensor control to the required grade. If bitumen required more than 4.50% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. | 323.4 | Per Cum | - | - |
| 6 | Recovery of material obtained from dismantling of existing bituminous layer has been calculated taking assumption that 80% of the theoretical material will be retrieved. The dismantling material can be used in any other item for the work after modification (bringing it to required specification) after approval from the employer. In case it is not possible to use this material on the work, the agency can take away this material. Assuming recovery of 20% residue of Bitumen. | 754.6 | Per Cum | - | - |
| 7 | Filling pot holes and patch repair with Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift | 1,617 | Per Sqm | - | - |
| 8 | Providing and applying tack coat on the prepared surface, with bitumen VG10 as per IS:8887 & manufacturer’s specifications @0.225 kg/sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification Cl. 502, 112. | 53,900 | Per Sqm | - | - |
| 9 | Providing and laying Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates (as per table 500-9, 500-10 and design mix) for base/binder course including loading of Material with F.E. loader, heating of binder (including cost of anti stripping compound, wherever required) aggregates and filler in hot mix plant (40-60 TPH), transporting the mixed Material by tippers and laying with sensor paver finisher as per clause 504.3.5 to the required level and grade, rolling by self propelled power rollers and vibratory rollers or pneumatic tyred roller, 150-250 KN. TP=0.7 Mpa, to achieve the desired density (approved by the department) but excluding primer/tack coat. (MoRTH specification : clause 505, 112). with all lead & lift (a) 50-75mm compacted thickness with 4.5% bitumen content VG30 grade | 3,180.1 | Per Cum | - | - |
| 10 | Providing and laying Bituminous Concrete as per Design Mix on prepared surface with specified graded stone aggregates as per Table 500-17, for wearing course including loading of aggregates with F.E. loader and hot mixing of binder (including cost of anti-stripping compound, wherever required) and 3% cement filler with aggregates in Hot Mix Plant 40-60 TPH, transporting the mixed Material with tipper to paver and laying with sensor paver finisher (as per clause 504-3.5) to the required level, grades and rolling with vibratory compactor and pneumatic tyred roller 150-250 kN, TP = 0.7 Mpa, to achieve the desired density (approved by the department as per job mix) excluding cost of primer/tack coat. (MoRTH specification : clause 507). with all lead & lift 30-45mm compacted with 6% binder (a) With straight run bitumen grade VG30 | 1,630.3 | Per Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.93 MB
BOQ_737117.xls
BOQ • 0.30 MB
1.SBDPart-01-SH-70.pdf
Tender Documents • 0.78 MB
1.SBDPart-02-SH-70.pdf
Tender Documents • 16.29 MB
RATE-ANALYSIS-01.pdf
Tender Documents • 7.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .