GENERAL MANAGER
THE BAZPUR COOPERATIVE SUGAR FACTORY LTD BAZPUR
EXPANSION OF 50 TON SUGAR WEIGHBRIDGE
2021_BCSFL_37002_1
EXPANSION OF 50 TON SUGAR WEIGHBRIDGE
Open Tender
Miscellaneous Works
Item Wise
90 days
BAZPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
THE BAZPUR COOPERATIVE SUGAR FACTORY LTD BAZPUR
₹24,000
8 Oct 2021
1 Oct 2021
8 Oct 2021
1 Oct 2021
7 Oct 2021
1 Oct 2021
Earth work in excavation by mechanical means(Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 100 m.
R.C.C. 1: 1½ :3 Cement Course sand and 20mm.Stone Grit including all material T & P Labor etc and excluding cost of centering shuttring up to plinth level, completion of foundation work etc.
Tor steel (M.S) cutting, bending & fixing including in all labor T & P Material etc.(Labour Rate)
Dismantling work for old Brick wall and M.S.Steel Structure etc. existing site weighbridge site and desposal of above material distance 200mtr. As per direction of Engineer Inchage.
Dismantling work MS Heavy and Small Structure such MS Pralin Truss and ms columns. Including Labor T & P. including stocking of disposal scrap material etc. as per direction of Engineer Incharge up to 200Mts. Distance. (Labor Rate)
Fabrication & Erection work MS Heavy and Small Structure such MS Pralin Truss and ms columns. Including Labor T & P. including stocking of disposal scrap material etc. as per direction of Engineer Incharge up to 200Mts. Distance. (Labor Rate)
Brick Works in 1st class Brick in 1:4 Cement, Course sand motar including all material labor, T & P etc up to plinth level in foundation completion of work.
20mm. thicken Plaster 1:4 cement Course sand motar including all material labor, T & P etc up to plinth level, completion of work.
P.C.C.(1:4:8) Cement Course sand and 40mm.Stone Grit including all material T & P Labor etc and excluding cost of centering shuttring up to plinth level, completion of work. In foundation & under floor etc.
C.C. (1:2:4) Cement Course sand and 20mm.Stone Grit including all material T & P Labor etc and excluding cost of centering shuttring up to plinth level, completion of work.
BABA AND COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .