| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.9 LAccepted-AOC | ₹13.9 L | 1 | Accepted-AOC Lowest bidder |
| 2 | 2₹14.5 L+₹60,677.05 (4.38%)Rejected-AOC | ₹14.5 L+₹60,677.05 (4.38%) | 2 | Rejected-AOC Highest bidder |
Tender Value
₹14.6 L
EMD Value
₹36,552
Closing Date
16 Jul 2026, 5:00 pmClosed
Assistant Executive Engineer
Electrical Sub Division kuttiady ,673508
Utility shifting at ES Thottilpalam section under KIIFB fund
2026_KSEB_857570_1
ESD/Ktdy/e-Tender-03/2026-27 dtd 25/06/2026
Open Tender
Electrical Works
Percentage
180 days
Thottilpalam to Kunduthode
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹36,552
24 Jul 2026
29 Jun 2026
18 Jul 2026
2 Jul 2026
16 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Stay for LT poles
including digging & back filling pit in
ordinary soil. | 25 | No | 938.82 | ₹23,470.5 |
| 2 | Additional rate for excavation of
one Pit for LT Pole/LT Stay in Laterite. | 44 | No | 217.45 | ₹9,567.8 |
| 3 | Transporting poles by hired
vehicle to a distance upto 5km and
carrying upto 4 numbers of poles
excluding loading& unloading charges. | 20 | Trip | 3,142.26 | ₹62,845.2 |
| 4 | Providing one Coil Earth using
No.8 GI-earth wire (50mm dia, 115
turns) including digging separate pit
(0.45x0.45x1.5m) at standard distance
away from the pole/structure in ordinary
soil & backfilling | 45 | No | 1,086.23 | ₹48,880.35 |
| 5 | Providing WP support with PSC
pole including digging & back filling pit
in ordinary soil. excluding transportation
of poles. | 16 | No | 1,943.5 | ₹31,096 |
| 6 | Labour charges for loading LT
PSC pole from the stacking place and
unloading the same at work site
(transportation by any vehicle) | 41 | No | 478.82 | ₹19,631.62 |
| 7 | Stringing, shackling, fitting cross
arms, insulators and binding, giving
jumper connection etc. using ACSR
Rabbit for Phase and ACSR Weasel for
Neutral & Street Main, for one km LT
3ph 5 wire line including cutting and
removing tree branches wherever
necessary and conveyance of all materials (except poles) from stacking
place. | 2.76 | km | 38,753.95 | ₹1,06,960.9 |
| 8 | Dismantling (without damage) one
LT PSC/RCC pole after disconnecting
stays, strut etc. attached thereon and
stacking the same | 24 | No | 1,923.64 | ₹46,167.36 |
| 9 | Dismantling one section fuse from
structure and bringing back to section
store. | 3 | No | 192.36 | ₹577.08 |
| 10 | Dismantling one damaged LT
PSC/RCC pole after disconnecting stays,
strut etc. attached thereon and stacking
the same. | 16 | No | 1,008.86 | ₹16,141.76 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
DOCUMENTS.pdf
Tender Documents • 0.75 MB
ESTIMATE.pdf
Other Document • 0.07 MB
BOQ_1449675.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .