Loading…
Loading…
Tender Value
₹11.5 L
EMD Value
₹28,812
Closing Date
13 Jul 2026, 3:00 pm5d left
Assistant Executive Engineer
Office of the Assistant Executive Engineer, KIP LB Subdivision No 19 Kottiyam
GENERAL KIP LB Kottiyam Branch Canal Rectification of canal in between Ch 9600 m and Ch 9990 m of Kottiyam Branch Canal in Thrikkovilvattom grama panchayath General Civil Work
2026_Irrig_859246_1
IRR/PII/TR/5861/2024_5_1_1/1
Open Tender
Civil Works - Canal
240 days
Kannanalloor
Please refer tender documents
7 documents required · 7 mandatory
₹2,760
₹28,812
Yes
6 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Canal relining | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.003 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | - | cum | - | - |
| 1.004 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.2 | cum | - | - |
| 1.005 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 1 | sqm | - | - |
| 1.006 | 5.28:Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound in expansion joints. | 1 | per cm depth per 1 m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
AffidavitForm.pdf
Additional Documents • 0.26 MB
SBDNIT.pdf
Tender Documents • 2.42 MB
IntegrityPact.pdf
Additional Documents • 0.01 MB
EPAYMENTFORM.pdf
Additional Documents • 0.01 MB
PreliminaryAgreement.pdf
Additional Documents • 0.13 MB
BOQ_1452817.xls
BOQ • 0.30 MB
FormofTender.pdf
Additional Documents • 0.02 MB
Download all tender documents and submit your bid