Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹14.7 L+₹12,663.43 (0.87%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.9 L+₹1.3 L (9.02%)Rejected-Finance 2ND FLOOR SHAGUN PLAZA SHYAMPUR RISHIKESH DEHRADUN UTTARAKHAND | RISHIKESH | DEHRADUN | UTTARAKHAND | 249204 | L3 | Rejected-Finance L3 | |
| 4 | L4₹17.9 L+₹3.4 L (23.1%)Rejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹18.4 L+₹3.8 L (26.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MA AND SONS L4 | RS Industries L5 | Deols Enterprises L1 | S S CONSTRUCTION COMPANY L3 | M/S SAVERA BUILDCON L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 120.66 | Cum | 100 ₹12,066 | 60 ₹7,239.6 | 68 ₹8,204.88 | 54.5 ₹6,575.97 Lowest | 60 ₹7,239.6 |
| 2.00 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 32.08 | Cum | 4,200 ₹1,34,736 Lowest | 5,300 ₹1,70,024 | 4,800 ₹1,53,984 | 4,727.5 ₹1,51,658.2 | 4,600 ₹1,47,568 |
| 3.00 | Providing & Laying of R.C.C M-15 (1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 196.77 | Cum | 5,200 ₹10,23,204 | 6,000 ₹11,80,620 | 4,300 ₹8,46,111 Lowest | 5,028 ₹9,89,359.56 | 4,800 ₹9,44,496 |
| 4.00 | Providing & Laying of R.C.C M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 2.86 | Cum | 7,500 ₹21,450 | 6,500 ₹18,590 | 7,319.4 ₹20,933.48 | 5,866.5 ₹16,778.19 | 5,500 ₹15,730 Lowest |
| 5.00 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 4.49 | MT | 72,000 ₹3,23,280 | 66,000 ₹2,96,340 | 54,900 ₹2,46,501 Lowest | 60,000 ₹2,69,400 | 55,000 ₹2,46,950 |
| 6.00 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 208.97 | SQM | 450 ₹94,036.5 | 200 ₹41,794 | 245 ₹51,197.65 | 196 ₹40,958.12 Lowest | 200 ₹41,794 |
| 7.00 | P / laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 12.2 | Cum | 2,200 ₹26,840 | 2,500 ₹30,500 | 2,500 ₹30,500 | 2,200 ₹26,840 | 1,300 ₹15,860 Lowest |
| 8.00 | P / laying of pea gravel in bed and graded filter sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 2.86 | Cum | 1,800 ₹5,148 | 2,000 ₹5,720 | 2,356.7 ₹6,740.16 | 1,888.9 ₹5,402.25 | 1,400 ₹4,004 Lowest |
| 9.00 | P / laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 35.7 | Cum | 3,500 ₹1,24,950 | 2,200 ₹78,540 | 2,200 ₹78,540 | 1,963.7 ₹70,104.09 | 1,000 ₹35,700 Lowest |
| 10.00 | Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 50.7 | SQM | 150 ₹7,605 | 100 ₹5,070 | 140 ₹7,098 | 112.2 ₹5,688.54 | 90 ₹4,563 Lowest |
Tender Value
₹19.7 L
EMD Value
₹39,400
Closing Date
13 Nov 2026, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of Fall At Km. 11.030 Of Kundarki Dy. under Project M.G.C. Stage-II
2026_UPIDC_1205395_8
08/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹39,400
18 Nov 2026
4 Nov 2026
13 Nov 2026
4 Nov 2026
13 Nov 2026
4 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 120.66 | Cum | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 32.08 | Cum | - | - |
| 3 | Providing & Laying of R.C.C M-15 (1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 196.77 | Cum | - | - |
| 4 | Providing & Laying of R.C.C M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 2.86 | Cum | - | - |
| 5 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 4.49 | MT | - | - |
| 6 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 208.97 | SQM | - | - |
| 7 | P / laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 12.2 | Cum | - | - |
| 8 | P / laying of pea gravel in bed and graded filter sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 2.86 | Cum | - | - |
| 9 | P / laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 35.7 | Cum | - | - |
| 10 | Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 50.7 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.94 MB
td.pdf
Tender Documents • 2.70 MB
BOQ_2284144.xls
BOQ • 0.26 MB
corr11.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .