Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC WARD NO 02 JAMUNA COLLIERY DISTT ANUPPUR MP | JAMUNA COLLIERY | ANUPPUR | MADHYA PRADESH | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical WARD NO 11 NEAR CENTRAL SCHOOL MOUHARPARA MANENDRAGARH CHHATTISGARH 497442 | MANENDRAGARH | KOREA | CHHATTISGARH | 497442 | - | Rejected-Technical L3 | |
| 3 | Rejected-Technical ATAL CHOWK CHANWARIDAND MANENDERGARH KOREA CHHATTISGARH 497442 | MANENDRAGARH | KOREA | CHHATTISGARH | 497442 | - | Rejected-Technical L2 |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
25 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer ENM
OFFICE OF THE GENERAL MANAGER SECL BAIKUNTHPUR AREA
Repairing/ Rewinding of various capacity motors of Baikunthpur Area.
2022_SECL_249830_1
SECL/GM/BKP/ENM/eTender/22-23/ 05
Open Tender
Civil Works - Others
Item Rate
60 days
Baikunthpur
As per NIT
7 documents required · 7 mandatory
₹5,300
19 Oct 2022
12 Jul 2022
26 Jul 2022
13 Jul 2022
25 Jul 2022
13 Jul 2022
13 Jul 2022 - 18 Jul 2022
Amount
Item Description/ Heading : Repairing/ Rewinding of various capacity motors of Baikunthpur Area.
(A) 1. Rewinding of 02 Nos 90 KW, 550 V, 50 Hz, 1480 RPM GEC make Motor Sl. No. KTN/M/05 and KTN/M/07 of Katkona 1&2 Incline 2. Rewinding of 01 No.90 KW, 550 V, 50 Hz, 1480 RPM Marathan make Motor Sl. No. KTN/M/11 of Katkona 1&2 Incline 3. Rewinding of 01 No.90 KW, 550 V, 50 Hz, 1480 RPM Crompton Greaves make Motor Sl. No. KTN/M/12 of Katkona 1&2 Incline (i) Cost of Copper Wire (Specification of Copper Wire 18 SWG - 27 Kg and 17 SWG - 35 KG for each Motor)
(ii) Insulation Cost
(iii) Repairing, Testing and Supervission Charge
(iv) Less Scrap Material
(B) 1. Rewinding of 01 No. 37 KW, 550 V, 1480 RPM Crompton Greaves make Motor Sl. No. PP/37KW/M-11 of Pabdavpara Mine 2. Rewinding of 01 No. 37 KW, 550 V, 980 RPM Crompton Greaves make Motor Sl. No. PP/37KW/M-2 of Pabdavpara Mine 3. Rewinding of 01 No. 37 KW, 550 V, 1480 RPM Crompton Greaves make Motor Sl. No. PP/37KW/M-20 of Pabdavpara Mine (i) Cost of Copper Wire (Specification of Copper Wire 18 SWG for each Motor)
(ii) Insulation Cost
(iii) Repairing, Testing and Supervission Charge
(iv) Less Scrap Material
(C) Rewinding of 02 Nos 22 KW, 550 V, 3 Phase, 1480 RPM Crompton Greaves make Motor Sl. No. PP/M-38 and PP/M-3 of Pandavpara Mine (i) Cost of Copper Wire (Specification of Copper Wire 18 SWG for each Motor)
Insulation Cost
Repairing, Testing and Supervission Charge
Less Scrap Material
(D) Rewinding of 02 Nos 15 KW, 550 V, 3 Phase, Auxiliary Fan Motor Ventvell make Sl. No. 11 and 15 of Churcha Mine (RO) (i) Cost of Copper Wire (Specification of Copper Wire 18 SWG for each Motor)
Insulation Cost
Repairing, Testing and Supervission Charge
Less Scrap Material
Total impact of GST for the purpose of CTC
GURU ENTEREPRISES
MANISH KUMAR JHA
stage.html
html • 0.04 MB
techsummary_258116.pdf
PDF • 0.19 MB
finsummary_258116.pdf
PDF • 0.19 MB
LOA24.pdf
PDF • 0.99 MB
finance_258116.pdf
PDF • 0.16 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .