Tender Value
₹51.4 L
EMD Value
₹1.0 L
Closing Date
17 Apr 2026, 6:00 pmClosed
MUNICIPAL COMMISSIONER AMC
Repair work of Wear & Tear of C.C Surface by high performance, fast setting and curing free Geo polymer mortar and Repair of Patch and Pothole repair by high performance, fast setting and curing free geo polymer concrete at Different Road of Different ward of Central Zone (ARC)
290255
25-26
Open
Miscellaneous Goods
Ahmedabad
3 documents required · 3 mandatory
₹2,400
Municipal Commissioner - Ahmedabad
₹1.0 L
26 Mar 2026
26 Mar 2026
26 Mar 2026
17 Apr 2026
26 Mar 2026
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.51,360/-)
3. Earnest Money 1% (D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs. Demand Draft of Rs.2400/-
Required registration Register “D” Class Contractor or above with any AMC/State
Government / Central Government / PSU / Local Body.
If successful bidder is not registered with AMC, they will have to
register before submitting his Running Bill No.
5 % of Contract Value to be submitted in the form of Bank
Guarantee. Bank Guarantee shall be from approved list of AMC
of banks and the issuing branch of bank guarantee shall be of
Amdavad City only. The validity of the Security Deposit shall be
up to valid till 90 days beyond Date of completion of work. The
Security Deposit shall be payable in 15 days from date of receipt
of LOI failing which interest @4% per annum will be charged by
6. Time-Limit 12 months (Excluding Monsoon)
180 days from the last date of submission of Tender. it should
7. Tender validity period be valid for 180 days from the last date of online tender
(i) Last Date of Online
Submission of the Tender
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected outright.
(iii) Description essential to be a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening of Tender Dt. 18/04/2026, 16:00 hrs.
Tender Fee & EMD should Submitted physically on Date.
18/04/2026 up to 15.00 hrs. along with tender documents as
described in the invitation of tender should be submitted to
10. Place of Submission of Tender Assistant Manager- Project, 2nd Floor, C – Wing, Sardar Patel
Bhavan, Danapith, Amdavad-380001.
Bid submitted without bid security & tender fee shall be treated
as non responsive and shall be summarily rejected.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
11. Penalty Due to Delay of work
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs) but not more then 10% of running / final bill
The Defect Liability Shall be as follows:
For individual roads, the DLP shall be 2 year from the date of
12. Defect Liability
completion mentioned in the completion certificate issued by
Authority for each road
Whenever a work is allotted by Engineering staff, whether minor
or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
Time permitted to start parts intimation as above by contractor the contractor shall be levied
of work penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
14. GST bwsc ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets, shoes,
helmets etc. while on duty and any violation will attract a fine of
Rs. 5,000/- for each incident.
Failure to erect safety signage or trying to carry out the
works without proper precautions/safety measures as required
will attract a fine of Rs. 5,000/- for each incident.
If contractor work is not Started or not completed in time
16 Debar condition or delay or left the ongoing work so As Per AMC Debar Circular
no.74 Dated 15.10.2025 Action taken against Agency
5% amount of each running bill including price escalation shall be
deducted against defect liability / performance guarantee and
Performance Guarantee:
17 shall be refunded against BG. Such Amount shall be released only
after completion of Defect Liability period (after deductions of
performance based recovery if any.)
Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
18 Money. Such retention money shall be released in the final bill of
Labour welfare cess 1% Labour welfare cess as per the Act, 1996 (non refundable)
shall be deducted from each running bill.
Contractor's Sign Addl.C.E.(Central zone)
SCHEDULE OF BIDDING PROCESS
Event Description Date
1 Sale of Bid Documents 26/03/2026
2 Last date of Online submission
3 Last date of Physical submission
4 Pre bid meeting - N A-
5 Opening of Technical Bid 18/04/2026 at 16:00 hrs.
6 Opening of Price bid To be intimated later.
7 Validity of Bid 180 Days.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - bæg Ítul
y.Bgw.ftu. Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su btLg hSMx[uNl ^htJ<t ftuLx[t¾xh©eytuyu ztWljtuz fhe ChJt.
2. yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, xuLzh ftuve <&t yLg vwhtJt mt&u
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu. su ftuLx[tfxh©eytuyu
hSMx[uNl heLgw fhtJuj l ntug.
4. ftuLx[tfxhtuyu xuLzhbt cukfl wltb, Ft<t lkch, btEfh lkch ylu mhltBþ MvÐ yûthu jFÔþ.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzh Ve ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœ ct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu. stu ybœtJtœ rmJtg lt yLg Nnuhle ntug ylu <u cukf duhkxe
ybœtJtœ rM&< mkckr^< cukf le NtFt îtht yr^f]< fhtguj ntug <tu <uJe cukf duhkxe MJefthJtle hnuNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<&t btuctRj lkch yJ~g jFJtltu hnuNu.
ftuLx[t¾xhu vtu<&t ze.ze. xuLzh R~gw > <theF ct>lt s ytvJt.
10. Nh<e xuLzh hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bkswhe ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ œhuf
12. xuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrl.rmvj frb§h©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju r>Jmu rlg< JucmtEx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjÔþk.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mw^ele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. mœh xuLzhbtk " GST rlgb Bþsc jtøþ vzNu. " <u Bþsc dKºte fhe xuLzh ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
a. The Bidder shall furnish, a Bid Security of the amount as shown in NIT as part of his bid,
in the form of D.D. or pay order or Bank Guarantee in favour of Hon. Municipal
Commissioner, Ahmedabad valid for 180 days from the last date of online submission of
Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as
non-responsive. Any bid having bid security for lesser value and shorter validity period shall
be treated as non-responsive.
(a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be
returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders,
will be returned when the successful bidder has furnished the required security deposit and
signed the agreement.
The Bid Security of the Successful Bidder will be discharged when the bidder has signed the
Agreement and furnished the required security deposit.
The Bid Security shall be forfeited, if the Bidder withdraws the Bid after Bid opening during
the period of Bid validity; in the case of a successful Bidder, if the Bidder fails within the
specified time limit to sign the Agreement; or Furnish the required security deposit.
commence the work after signing the agreement within 15 days No interest shall be paid by
the owner on any tender guarantee. The issuing branch of the bank guarantee shall be of
Amdavad City only.
Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp
papers of requisite value in accordance with the stamp Act applicable to that particular
state of Indian Union, where executed.
The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly
indicate in (block letters) his name, designation, Power of Attorney No. / Signing Power No.
Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/ initialed
by the executing officers and the last page shall be signed in full, indicating the particulars
as aforesaid under the seal of the Bank.
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, Bþsc <btb «fthle fLMx[¾Nlle
yu¾xeJexebtk BþÏg ftuLx[t¾xh, mc ftuLx[t¾xhlt su bswhtu ftbdehe fh<t ntug <u <btb bswhtuLþk øþsht< rcÕz´d yuLz y^h
fLMx[¾Nl Jfombtk hSMxuNl fhtJÔþ VhSgt< Au.
Ahmedabad Municipal Corporation
ENGINEERING DEPARTMENT
Name of Work: - Repair work of Wear & Tear of C.C Surface by high performance, fast setting and curing
free Geo polymer mortar and Repair of Patch and Pothole repair by high performance, fast setting and
curing free geo polymer concrete at Different Road of Different ward of Central Zone (ARC)
Sr. Qty. Item Rate in Rs. Per Amount in Rs.
1 Providing and laying a high-performance, fast-
setting Concrete Resurfacing geo polymer Mortar,
completely curing-free and zero-shrinkage, in
mm thickness over the existing concrete surface
ensuring traffic mobilization within 2 hours of
work execution.
The mortar shall:
• Achieve 15 MPa compressive strength within
• Achieve 4 MPa bond strength within 24 hours.
731.00 • Be non-shrink, non-toxic, and curing-free.
The work includes:
• Cutting up to the depth of 10mm and then
surface preparation using blowers and
mechanical/wire brushing.
• Cleaning and conditioning of surface for proper
• Mixing of Geopolymer Mortar in a mechanical
• Placement, finishing & complete execution.
All work shall be carried out as per approved
specifications, technical data sheets, and
Engineer-in-Charge directions. 4759.00 Sq.mt.
2 Providing and laying treatment for wear & tear of
existing concrete or Asphalt pavement using a
premixed, high-performance, curing-free, quick-
setting geopolymer mortar for repair of patch and
pothole with minimum depth of 100 mm,
executed without cutting the panel, ensuring
traffic mobilization within 4 hours of work
The mortar shall:
• Achieve 25 MPa compressive strength within
hours. 127472.00 Cu.mt.
• Achieve 4 MPa bond strength within 24 hours.
• Be non-shrink, non-toxic, and curing-free.
The work includes :
• Surface preparation using blowers and
mechanical/wire brushing.
• Cleaning and conditioning of surface for proper
• Mixing of the inorganic phosphate-based premix
Geopolymer Mortar in a mechanical mixer.
• Placement, compaction, levelling and finishing.
All work shall be carried out as per approved
specificationsand Engineer-in-Charge directions.
Contractor’s Quoted Rate: - +
Net Tender Amount Rs................................/-
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (Central zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr.No Name of Works Approximate Bid Security Completion
value of works (Rs.) Period
1 Repair work of Wear & Tear 51,35,965.00 51,360.00 12 Month
of C.C Surface by high (Excluding
performance, fast setting and Monsoon)
curing free Geo polymer
mortar and Repair of Patch
and Pothole repair by high
performance, fast setting and
curing free geo polymer
concrete at Different Road of
Different ward of Central
2. T e n d e r (a complete set of bidding document) fee shall be Rs.2400/- in the form of
Demand Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non refundable. The
fees shall be paid at the time of submitting the tender.
3. Interested bidders shall download the tender documents from website
http://tender.nprocure.com tender fee as mentioned in clause 2 above shall be paid by the
bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as
specified in Clause of ITB (Instructions to Bidders).
All Bids must be delivered to Assistant Manager- Project, 2nd Floor, C – Wing, Sardar Patel Bhavan,
Danapith, Amdavad-380001.
Seal and Signature of the Bidder Addl. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor can not stop the work due to on availably of labour force. In
case progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for
work done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken
to mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence
of specific mention of a particular point or aspect, the provisions on these particular points,
or aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on
site or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is not approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage
or over loading of the various components of the structure during execution or after
completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (180) from opening of price bids.
SECURITY DEPOSIT
Within 15 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (Central zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month (Excluding Monsoon) period after the order to start the
works. Progress of work should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the
traffic. He shall be responsible for any damage to public. If any incident happen, during the
execution of work. In case of dispute for unseen or overlooked items the decision of the Dy. City
Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work
and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this
risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have
to prepare through of bigger size and mix the mortar in the required proportion. In on case he shall
be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him.
No claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer
on his own during the period. If any tenderer withdraw or makes any modifications or addition in
the terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the
work the penalty of Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate
bills payable to the contractor. Contractor has to make his own arrangement for procurement of
steel and cement.
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (Central zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child
Labour Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide
lines and as per the guide lines. If child labour is employed on the site work, the contractor
shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour
welfare fund. If the employer refuses to deposit then action will be taken for contempt of
Supreme Court Judgement and also will be prosecuted by concerned authority. Because of
the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as
per its Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently
decided that the actual testing charge is taken and the remaining amount is refundable at
the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register
acordingly,and has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim
shall be entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be
made by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the
tendrers enclosed along with the tender duly signed. These shall form a part of tender. The
tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM / CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form
the part of the contract documents. The full consideration shall be given to such addendum or
corrigendum or correction before submission tender duly filled in by the contractor. Therefore, the
contractor shall have to watch such addendum or corrigendum or correction published by A.M.C
through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and
enclose the same with the tender documents,failing which the tender shall be liable for rejection
and no any complaint in respect to this shall be entertained under any circumstances.
Correction of Defects during Defects liability period
a. The Engineer shall give notice to the contractor of any defects before the end of the
defects Liability Period, which begins at completion and is defined in the contract
b. Every time notice of a defect is given, the contractor shall correct the notified defect
within 7(seven) days specified by the Engineer’s notice.
c. Contractor has to rectify all the defects which are to be found during defect liability
period as suggested by PMC/Agency appointed by AMC/Engineer-in-Charge and/or
his authorized representative.
d. After satisfactory completion of work in prescribed time limit, contractor has to
conduct pavement condition survey with Engineer-in-Charge and/or his authorized
representative alongwith prescribed format in every three months also strictly check
after monsson in defect liability period and submit report with colour photographs
to concern Engineer-in-Charge and/or his authorized representative.
e. After submittion of report, if any road defects found in defect liability period,
contractor has to remedies the defect of road within prescribed time format as per
tender condition as suggested by Engineer-in-Charge and/or his authorized
representative with his own cost duly certified with testing certificate.
f. As suggested by Engineer-in-Charge and/or his authorized representative, third
party proof cheking of work and charges of proof cheking has to be born by
contractor during work and in defect liability of work.
Uncorrected Defects during Defects liability period (Risk and cost)
a. If the Contractor does not rectify or correct a defect within the time specified in the
engineer’s notice, the engineer will assess the cost of having the defect corrected, and the
contractor will bear the costs of such defective work as well as all works carried out over
such defective work until the defect is removed to the satisfaction of the Engineer. The cost
of such defective work will be recovered from the bank guarantee submitted against
performance for defect liability period.
b. Only the defects liability certificate referred to in following clause shall be deemed to
constitute the approval of the works.
c. Defects Liability Certificate: The Defects liability certificate shall be given by the Engineer-
in-Charge and/or his authorized representative to the Employer, with a copy to the
Contractor, within 28 days of the expiry of the Defects Liability Period. The Contract shall
remain incomplete until issue of the Defects Liability Certificate.
d. The defects Liability Certificate shall mention clearly that the Contractor has completed his
obligations to execute and complete the works and remedy defects therein to the
satisfaction of the Engineer.
e. Unfulfilled obligations: Despite issuance of the Defects Liability Certificate, the contract
between the Employer and the Contractor shall remain in force in respect of unperformed
obligations incurred under the provisions of the Contract prior to the issue of the Defects
Liability Certificate.
Manual for maintenance during defect liability period is attached as Annexure-X
f. If any major defects found within defect liability period of particular road, 10% of amount of
particular road work should be penalised from submitted BG (performance guarantee).
g. During execution of works and in defect liability period ,In any case if any fatal accident
(major or minor) occurs due to poor work and poor safety precautions, then it will be
completely Bidders’s responsibility and compensation for the same has to be paid by
tenderer. During execution of works and in defect liability period, If any news is published in
print/Electronic/Social media regarding inferior quality of work and poor safety precautions,
and due to inferior quality work any fatal injuries occurs, all the losses due to such accidents
and expenses of legal matters shall be borne by Bidders.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
STAMP & Mobile No.: (Central zone)
TENDER CONDITIONS
Qualifications / Eligibility Criteria
The bidder must meet all the following conditions:
1. Registration Requirement
The applicant must be registered as “D” Class Contractor or above with any State
Government / Central Government / PSU / Local Body.
The bidder must hold a valid Employees Provident Fund (EPF) registration certificate.
2. Work Experience Requirement (Past 5 Years)
The bidder should have satisfactorily completed, in any Central / State Govt. / PSU / Local Body, the
One similar completed works costing not less than the amount equal to 80% of the estimate
Two similar completed works costing not less than the amount equal to 50% of the estimate
Three similar completed works costing not less than the amount equal to 40% of the
estimate put to tender.
Definition of Similar Work
“Similar Work” shall mean any project involving repairs of potholes and patches in Cement
Concrete (CC) and / or Asphalt Roads OR repair and rehabilitation/resurfacing of horizontal
concrete surfaces using premixed, high-performance, curing-free, quick-setting geo polymer mortar
/ Concrete executed under a single contract.
3. Technical Requirement
The bidder should have executed works related to resurfacing of Cement Concrete (CC)
Roads and/or repair of patch/potholes on CC/Asphalt Roads with high performance, curing
free geo polymer material.
The bidder must submit an MoU with a manufacturer of inorganic phosphate-based curing
free, quick setting Geo polymer Concrete and manufacturer of curing free, quick setting Geo
polymer Mortar.
AHME DABAD MUNICIPAL CO RPORATION ENGINEER DEPART MENT
TECHNICAL SPECIFICATION
Name of Work ;- Repair work of Wear & Tear of C.C Surface by high performance, fast setting and
curing free Geo polymer mortar and Repair of Patch and Pothole repair by high
performance, fast setting and curing free geo polymer concrete at Different
Road of Different ward of Central Zone (ARC)
SURFACE PREPARATION
Surfaces must be chipped and remove to a minimum thickness of 100mm or more. and the edges
need to be cut to a Rectangle or geometrical shape using concrete cutting tools and break hammer.
Edges shall be prepared steep to 100mm using concrete cutting tools. Surface must be staple, dry,
sound, clean and free from loose particles or contamination to ensure proper bonding. Repair deep
areas, holes and non-moving cracks of with mortar prior to application of Geo polymer Concrete.
MIXING GUILDLINES
Geopolymer Material can be mixed in all types of conventional concrete mixers with a water
powder ratio of 0.1 to 0.12 which will have a flowable consistency. Do not add more water as
increasing the water content more than specified will drastically affect the final properties of the
product. Keep mixing for about 2 to 3 minutes. At this point pour the mortar mix in the repair area.
The Mortar mix has to be placed for a minimum thickness of 100 mm or more and to be levelled
using appropriate tools. Remember to wash off all the tools immediately after application.
1. Sprinkle water on the prepared surface till SSD (saturated surface-dry) condition prior laying
Geopolymer Concrete.
2. Pour the Geo polymer Concrete mortar on the surface and spread it evenly to the required
3. Maintain the minimum thickness of 100 mm or more.
4. Use the finish Trowel to bring the surface finish. Allow the material to set for min 2 hours and do
not disturb the same during setting.
5. Don't add water to the mix if it starts hardening. Discard the unusable material.
6. Ensure the placed mortar is protected from rain and moving vehicles for minimum 2 hours.
7. Allow the surface for usage after 2 hours.
8. No curing is required.
Product Manufacturing date and batch number
Material Test Certificate
Tools and equipment list Requirement
Manpower requirement
Time estimation for execution and return to service
Permissions required for Traffic and other services.
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Providing and laying a high-performance, fast-setting Concrete Resurfacing geo polymer Mortar,
completely curing-free and zero-shrinkage, in 10 mm thickness over the existing concrete surface
ensuring traffic mobilization within 2 hours of work execution.
The mortar shall:
• Achieve 15 MPa compressive strength within 2 hours.
• Achieve 4 MPa bond strength within 24 hours.
• Be non-shrink, non-toxic, and curing-free.
The work includes:
•Cutting up to the depth of 10mm and then surface preparation using blowers and
mechanical/wire brushing.
• Cleaning and conditioning of surface for proper bonding.
• Mixing of Geopolymer Mortar in a mechanical mixer
• Placement, finishing & complete execution.
All work shall be carried out as per approved specifications, technical data sheets, and Engineer-in-
Charge directions.
Providing and laying treatment for wear & tear of existing concrete or Asphalt pavement using a
premixed, high-performance, curing-free, quick-setting geo polymer mortar for repair of patch and
pothole with minimum depth of 100 mm, executed without cutting the panel, ensuring traffic
mobilization within 4 hours of work execution.
The mortar shall:
• Achieve 25 MPa compressive strength within 4 hours.
• Achieve 4 MPa bond strength within 24 hours.
• Be non-shrink, non-toxic, and curing-free.
The work includes :
• Surface preparation using blowers and mechanical/wire brushing.
• Cleaning and conditioning of surface for proper bonding.
• Mixing of the inorganic phosphate-based premix Geopolymer Mortar in a mechanical mixer.
• Placement, compaction, levelling and finishing.
All work shall be carried out as per approved specifications and Engineer-in-Charge directions
i. Surfaces to receive Geopolymer mix must be dry, structurally sound, clean, free of dust,
dirt, wax, oil, grease, asphalt, mastic, latex com-pounds, paints, adhesives.
ii. Clean the surface with wire brush followed by compressed air / Jet Spray.
iii. Edges shall be prepared professionally using concrete cutting tools
iv. If cracks are present in the surface it should be filled as per the standard procedure.
v. If required do chiseling until a hard concrete is encountered
vi. Surface to be repaired may be hacked & pre wetted to bring it in SSD condition to enhance
the bonding. Ensure no standing water.
vii. Geopolymer mix shall be mixed with dry clean sand and aggregates in suitable proportions
to get required concrete mix performance.
viii. Mix using a mixer blade rotating @ 500 to 800 RPM.
ix. Use any kind of suitable application equipment to place the material.
x. level and finish the mix with proper slope. And provide surface structure
xi. Allow to cure material for two hours and after two hours open for traffic.
xii. The Contractor Shall Repair the road to a minimum depth of 100 mm or any damage depth
of road and filling any damage or potholes with Geo polymer or approved base material, as
per latest IRC/MoRTH Specification and no Extra payment shall be Given for filling any
Material in base.
xiii. Polymer Mix Design to meet Latest IRC/MoRTH/ASTM Code. This Mix Design Should be
done in Presence of Engineer In charge/Appointed PMC Before the starting of Work and to
be approved as per the AMC Norms.
xiv. Quality control and testing shall be conducted in accordance with the latest relevant code
provisions and methodologies.
xv. The contractor shall test mortar /Concrete /Geopolymer material properties and
frequencies in accordance with the latest IS, IRC, MoRTH, and ASTM standards.
xvi. The Contractor must submit a Quality Assurance Plan (QAP) for approval prior to the
commencement of work, ensuring full compliance with AMC norms.
xvii. The Contractor is responsible for ensuring that the repaired surface is flush with and
aesthetically identical to the adjacent existing surface.
xviii. The contract rate is all-inclusive, covering all labour, materials, plant, and safety measures.
The Contractor shall have no claim for extra payment for any items related to the execution
xix. Every 25 Cum Contractor Shall Below Test in presence Of Engineer in charge Or Appointed
PMC and that Test Shall be Meet As per Latest Codel Provision.
Test Name latest IS/IRC/MoRTH/ ASTM
Compressive Strength IS
Flexural Strength IS
Depth Of water Penetration Under Pressure: IS
Drying Shrinkage Test IS
Hardened concrete properties IS 516 & IS 1199:2018
Pull Off Adhesion ASTM D 4541-22
Water Permeability Test EN 12390 (Part 8) -
Resistance CHLORIDE ION Penetration RCPT ASTM C 1202-2022
(Chemical Testing)
Splitting Tensile Strength As per Requirement
TECHNICAL DATA SHEET
Compressive Strength - 2 Hours: 25 MPa
Splitting Tensile Strength - 4 Hours: 30 Mpa , 28 days: 4 MPa
Shrinkage - None
Open Porosity - Less than 2.5%
Bond Strength To Concrete - 6 MPa
Unit Weight 2400 kg/m3
Seal and Signature of the Bidder Add.City Engineer(CZ)
Amdavad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
Esluh Ftðþ - xuLzhle Nh<tu
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl) bégt ctœ rœl-
15 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf duhkxe&e zevtuÍex Che fhthvºt
fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj dKJtbt
ytJNu <ub A<tk vK ftb NY fhJtbtk lrn ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 180 rœJm hnuNu.
4. xuLzh MJefthÔþk, hesu¾x fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog ytFhe
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg ftuLx[t¾xh Jtk^tu jE
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhÔþk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu LþfNtl &Nu <tu <ule
mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb >hBgtl bswh fu sl<tlt ftuE btKmlt
òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK
ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u
btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh
bsqhlu Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegtœbtk sJtcœth hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK MxtV
ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gtœelt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo. btk btLg
ftuLx[t¾xhle gtœebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu ck^lf<to hnuNu.
ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu <&t MxtVle Mþalt vK mtEx Wvh
atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl øþsht< çþf Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e
ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe s xuLzh ChÔþk.
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftgœtfeg jexeduNl yb>tJtœ Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu
mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE sJtltu Fao vK ftuLx[tfhu
CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch yu¾x
«btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle hnuNu.
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw fhJtlt hnuNu.
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo >lt Vtuxtud{tV
BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh hœ fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬tu fu J¤<hle btkdKe fhe NfNu
lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. ßgtk
ftuE atuFJx l &E ntug ðgtk btu&o/ytR.yum/yu.yum.xe.yub ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftgœt Bþsc su ftuE hfble fvt< fhJtlt nwfb mhfth©eyu fhuj ntuE <u
Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk ytJNu.
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (bæg Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
6.CC road Repair tender for CZ.pdf
Download all tender documents and submit your bid