Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 LRejected-Finance | ₹2.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | NIYAS E L2 | SHIHABUDHEEN E. L1 |
|---|---|---|---|---|---|
| 1.00Building | |||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.11 | cum | 2,057.97 ₹232.55 | 2,057.97 ₹232.55 |
| 1.00 | OD545361/2024-2025:Dismantling and stacking laterite useful for reuse including all cost conyence and all labour charges etc complete as per specification. (modified 60.7.3) | 0.22 | cum | 442.15 ₹95.50 | 442.15 ₹95.50 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.35 | cum | 298.84 ₹1,000.52 | 298.84 ₹1,000.52 |
| 1.00 | OD545185/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 3.35 | cum | 3,513.36 ₹11,762.73 | 3,513.36 ₹11,762.73 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.3 | cum | 7,249.92 ₹9,395.90 | 7,249.92 ₹9,395.90 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 0.38 | cum | 9,142.08 ₹3,437.42 | 9,142.08 ₹3,437.42 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 53.58 | kilogram | 98.92 ₹5,299.64 | 98.92 ₹5,299.64 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 3 | sqm | 653.88 ₹1,961.64 | 653.88 ₹1,961.64 |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 2.95 | cum | 6,665.3 ₹19,675.97 | 6,665.3 ₹19,675.97 |
Tender Value
₹1.7 L
EMD Value
₹4,237
Closing Date
10 Apr 2025, 5:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER OFFICE MANJERI MUNICIPALITY
Annual Plan-2024-25 Manjeri Municipality, Project No- 1456-Maintenance of Muttipalam Anganwadi center no62 in ward no 30-General Civil Work
2025_LSGD_757293_5
2716147/24/9/2
Open Tender
Civil Works - Roads
180 days
MANJERI
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹4,237
Yes
26 May 2026
31 Mar 2025
11 Apr 2025
31 Mar 2025
10 Apr 2025
31 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1230269.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid