GENERAL CONDITIONS OF TENDER
Due Date/Time : 25.09.2023 / 15:00 Hrs
FILLING AND SUBMITTING TENDERS:
1. Quotations should be submitted only in the prescribed tender schedule
forms supplied by the Company together with Drawings and General
Conditions of Tender duly signed by the tenderer along with a Bank Draft,
the amount mentioned or before the due date/time of closing of the tender.
Quotations received after the due date/time will not be considered.
2. EMD equivalent to 5% of quoted value, maximum Rs. 5000/- and
maximum Rs. 1,00,000/- should be submitted by way of demand in favour
of Bharat Petroleum Corporation Ltd, payable at Ahmedabad. Xerox
copy of demand draft should be uploaded and physical copy of demand
draft should be deposited at Depot Office before due date of tender:
BHARAT PETROLEUM CORPORATION LTD
NAVAGAM TOP, Village Kanera, NH-8,
District Kheda, Gujarat-387540,
3. BPCL registered vendor need not to submit EMD, if quoted value of tender
is within his registration limit, they should upload copy of registration letter.
4. MSME/SSI unit need not to submit EMD, they should upload copy of their
registration certificate.
5. All documents i.e. General Terms & Conditions, Special Terms &
Conditions, Scope of work etc. uploaded in tender should be downloaded
by the vendor and signed & sealed copy should be uploaded in
confirmation of acceptance of tender conditions.
6. Before submitting the online tender please check that all required
documents has been correctly uploaded and are legible. Also check the
price bid has been correctly filled by using “TEST” facility provided in
7. The tenderer should study all the tender documents carefully and
understand the conditions, drawings specifications etc. before quoting. If
there are any doubts, he should obtain clarifications, but this shall not be
justification for late submission or extension of opening date/time of the
8. The tenderer should visit the site and acquaint himself with site conditions,
availability of water, electricity, approach road, construction materials as
per specifications, shelter for his staff etc. since these are to be
provided/arranged by the tenderer (unless otherwise specified) at his cost.
9. The tenderer should quote for all items in the tender schedule. The rates
should be expressed both in figures- and in words: where discrepancy
exists between the two, the rates expressed in words will prevail. Similarly
if there is any discrepancy exists between the unit rate and the amount,
the unit rate will prevail. The final amount again should be both in words
10. The rates should be quoted in the same units as mentioned in the tender
11. All entries in the Tender Documents should be in Ink/Typed. Corrections, if
any, should be attested by full signature of the Tenderer. Use of white fluid
is not permitted.
12. Every page of the tender documents shall be signed by the tenderer or his
authorized representative.
13. The tenderer should indicate the time required to complete the entire work
from the date of receiving the order. The time indicated in tender may
have a bearing on awarding the contract.
14. The rates quoted should be inclusive of all material, labour, water,
electricity, power equipment, tools / tackles, catering, shoring, lifts,
scaffolding, excise / customs / octroi duties, sales tax etc., All materials
are to be supplied by the tenderer unless otherwise stated.
No excise duty is leviable on erection/ Fabrication of the storage tanks /
LPG spheres /bullets / structural and the corporation will neither entertain any
claim nor reimburse any such amount paid by the contractor
(a) Contractor is required to quote the tender in conformity with our terms and
conditions and no deviating condition whatsoever will be entertained.
Conditional offers will be rejected without any reason.
15. The rate quoted should be inclusive of all material, labour, water,
electricity, power equipment tools/ tackles, centering, shoring, lifts, leads,
scaffolding etc. Once the quotation is accepted, the rates quoted shall be firm
till the entire work is completed in all respects.
ACCEPTANCE OF TENDER:
16. Incomplete/Conditional tender quotations or without valid EMD (whenever
applicable) those received late and/not confirming to the standard terms
and conditions, the tender documents will be rejected.
17. The Company reserves the right to reject any or every tender without
assigning any reason whatsoever and/or to negotiate with the tenderer (s)
in the manner the Company considers suitable
EARNEST MONEY DEPOSIT / SECURITY DEPOSIT: (Applicable
only for work costing Rs.50, 000/- and above in value).
18. The tenderer shall be required to submit along with this quotation a Bank
Draft in favors of Bharat Petroleum Corporation Ltd. for a sum equivalent
to 5% of the total tendered value of works as earnest money deposit,
subject to a minimum of Rs. 5,000/- and a maximum of Rs.l,00,000/-.
The earnest money deposit shall be returned to the unsuccessful
tenderer/s within one month after due date for opening of the tender. The
earnest money deposit of the successful tenderer will be retained till the
commencement of the work. Thereafter the tenderer may opt to adjust the
earnest money deposit against security deposit as a money deposit or
request return of the earnest money deposit. No interest will be payable on
earnest money deposit.
Security Deposit: (Applicable only for works costing Rs. 50,000/- and above
19. The successful tenderer before commencement of the work, shall have to
provide to the Company, by way of security, a money deposit or a Bank
Guarantee in the standard format provided by the Company, for an
amount equivalent to 5% of the total tendered value of the works, subject
to a minimum of Rs. 5,000/- and a maximum of Rs. l,00,000/. The tenderer
shall have the option to adjust the earnest money towards security deposit
if he so desires.
The security deposit will be retained till the successful completion of the work. In
the case of security deposit in the form of a Bank Guarantee, the same shall be
kept valid by the tenderer at his cost till the completion of the work under contract
and shall be extended from time to time. No interest will be payable on security
20. EXECUTION OF AGREEMENT:
The successful tenderer shall within 15 days of the Company’s
communication to him of the acceptance of his tender, execute a formal
Agreement with the Company, on the Company’s format and on the stamp paper
of appropriate value.
21. EXECUTION OF WORKS:
The successful tenderer should submit detailed construction programme
adhering to the completion time quoted in the Agreement. The programme will
form part of the contract. However, the Company reserves the right to alter the
programme, if necessary, from time to time and no claim of successful tenderer
on account of such alteration will be entertained.
All materials required for the execution of work should conform to the
standard specification and approved by the Engineer in Charge before actually
put to use. Commencement of work without prior approval shall be entirely at the
risk and cost of the contractor. No delay due to non-availability of materials, tools,
equipment etc. will be entertained by the Company. In the case of certain
machinery/equipment, the Company’s site Engineer may inspect the items for
approval before they are brought to the site.
The responsibility for the safety, security and accounting of the materials
and equipment brought or installed by the successful tenderer or handed over to
him by the Company for completion of the work will remain with him till the
acceptance of the work by the Company. Any damage caused to the material/
equipment during the execution of work will be made good by the successful
tenderer at his cost. The Company may require the successful tenderer to have
guarantee/indemnity bond executed for the value of the materials supplied to him
free of cost, as per terms of the Agreement.
Quantities shown in the Tender Schedule are approximate and payment shall be
made as per actual measurements. The successful tenderer is not entitled for
any sort of compensation toward materials procured/stored in excess of the
measured quantities.
The Company reserves the right to increase or decrease the tendered quantity or
revise specifications, drawing, designs of any or every item or delete them at any
stage of work. The successful tenderer’ s claim for compensation or damages on
account of these shall not be entertained. Such deviations will be adjusted at the
rates contained in the Agreement or at prevailing market rates, if the rates are
not available in the Agreement, by issuing variation order (s). In case it becomes
necessary for the Company to temporarily suspend or postpone the work, partly,
or fully due to unforeseen circumstances, the Company shall not be liable for any
compensation on account of resultant delays.
The entire work will be carried out under the supervision of the authorized
representative of the Company, but this will not detract successful tenderer’s) full
responsibility for quality/period of execution of work.
Detailed measurements of works carried out shall be taken jointly by the
successful tenderer and our site Engineer at every stage of work, before
proceeding to the next stage. All works shall be measured as per the procedure
laid down. Payments will be made as per measured quantities and not as per
Tender Schedule quantities.
The successful tenderer shall submit to the office which has awarded the
contract, periodic progress reports of his work as stipulated by our Site Engineer.
The successful tenderer shall not undertake himself any change in specifications
mentioned in the lender documents. In case of doubts he will refer the matter in
writing to the Company and act as per clarifications given by the Company. Any
changes in the work involving changes in original specifications
quantities/additional items of work should be covered by obtaining suitable
variation order (s) form the Company immediately.
If the performance of the successful tenderer is found to be unsatisfactory, the
Company reserves the right to cancel in part or the whole of the contract and get
the work executed through alternative means at the entire risk and cost of the
successful tenderer.
If the successful tenderer does not complete the work in the stipulated time, the
Company reserves the right to recover liquidated damages at 0.5% of the total
contract value for every week of delay or part there of subject to a maximum of
5% of the total contract value until the work is satisfactorily completed and
handed over. However for delay in completion of a specific urgent job the
maximum compensation will be increased to 15% of the total contract value.
Such damages may be deducted by the Company from any money due to the
tenderer and any further amount due from the tenderer shall be paid by the
tenderer to the company forthwith.
The successful tenderer should ensure the safety of adjoining property and shall
make good any loss to product / property resulting from his negligence.
Hot work is carried out only in the areas earmarked for the purpose, after
required safety precautions have been taken and only after obtaining written
permission from the Site Engineer. Any provision required to be made e.g. wind
screens of G.C.I. Sheets etc. to make the area safe for hot work, will be made
the successful tenderer at his own cost.
The work in the existing Company’s premises should be carried out during the
Company’s normal working hours and without obstructing day-to-day work in the
establishment. If any work is required to be carried out beyond normal working
hours, prior permission should be obtained before undertaking such work.
In the event of the successful tenderer failing to complete the work
within the stipulated time, the Company shall have the right to employ any other
agency to complete the remaining work at the risk & cost of the successful
It will be the successful tenderer’ s responsibility to get the works approved and
obtain all certificates for plumbing, electrical, civil works from local, municipal,
Governmental or other required authorities.
Tanks, Pumps, pipelines, Posts, Equipments and/or any other materials to be
supplied by the Company will be supplied any where within the site premises.
Safekeeping, transporting and handling of the same to actual location of the site
will be the successful tenderer’ s responsibility for which no extra payment will be
During execution of work if it is found necessary to dismantle a portion of existing
bund wall, enclosure wall, compound wall, fencing etc. to facilitate the movement
of materials and equipment, the same shall be carried out after obtaining
permission in writing from Company’s authorized representative and also made
good by the contractor at his own cost.
If the work is required to be carried out in a working Depot, Installation, retail
outlet etc. the progress of work is likely to be interrupted on account of operations
in such units. Stowage of work under such circumstances shall not entitle the
successful tenderer to claim any compensation for idling, machinery etc. during
such interruptions.
The successful tenderer shall arrange for at least one competent supervisor to be
present at site at all limes during the progress of the work, which shall be duly
authorized to take instructions and execute them on his behalf.The successful
tenderer and his man shall abide by all security / Safety rules / regulations in
force at locations and the laws, bye laws, and statues of Government, semi-
Government and other local authorities such as requirements / liability under
enactment like the workmen’s Compensation Act, Contract Labour Act etc. and
the Company shall stand indemnified against any claims on these scores. The
successful tenderer and his men shall strictly abide by “No Smoking” and other
petroleum regulations on the premises.
Contractor will be responsible to provide all statutory benefits to the employees
appointed by them and in case the Corporation is liable to make payment of any
such statutory benefits to the employees of the Contractor as the principle
employer, the contractor will be liable to indemnify the damage and loss suffered
by the Corporation to that extent and corporation shall have liberty, without
referring to the contractor to deduct such sum as may be suffered as loss or
damage due to the aforesaid reason out of the pending bills of the contractor
lying with the Corporation.
The successful tenderer shall arrange for at least one competent
supervisor to be present at site at all times during the progress of the work, who
shall be duly authorized to take instructions and executive them on his behalf.
29. INTERIM PAYMENTS:
At the sole discretion of the Company, the contractor can receive up to
90% of the payment for the cost of work done. Interim bills should be duly
supported by the measurements of work actually done. (All payments shall
be subjected to deduction of Income Tax and any other statutory
deduction as may be applicable from time to time).
30. FINAL BILLS / RETENTION MONEY:
a. On completion of the work to the satisfaction of the Company’s authorized
representative and after clearing the debris, tools, tackles, shoring, centering,
materials etc. from the site and obtaining necessary certificates as required
from the local authorities, the successful tenderer shall submit his final bill
based on the jointly recorded measurements of actual work done.
b. The final bill of the job done should be raised, unless otherwise agreed by the
Corporation in writing, within one month from the date of completion of the
total job as per contract. Whether the job has been completed or not will be
decided at the sole discretion of the Corporation. Payments of the final bill will
be made after adjusting interim payments and retention amount deducted and
c. The Corporation will be entitled to deduct 3% value of all Interim/running bills
and in final bills as Retention Money for all jobs exceeding Rs.l,00,000/- and
no interest will be paid on money retained by the Company.
d. The said retention money will be retained for a period of one year and paid to
the Contractor after adjusting any dues of the Corporation against the
Contractor under the workmanship/materials provided to the Contractor
and/or against any other claims for any reason whatsoever under the
Agreement which may arise within the said period of one year. The retention
period of one year will commence from the date of completion of the job (as
reckoned by BPCL).
e. Retention money shall be released against Performance Bank Guarantee of
equivalent value, provided the tenderer opts for the same at the time
submission of tender.
f. The successful tenderer shall not subject or assign any part of the work to
another party, without the prior written consent of the Company. In any event
the successful tenderer will be solely responsible for the work so sublet or
g. The Contractor undertakes to ensure due and complete compliance with all
laws regulations, rules etc. whether of the Central Government or the State
Government or any other competent authority applicable to the workmen
employed or whose services are otherwise availed of by the Contractor,
whether in connection with the construction work at the site or otherwise. The
Employer shall have the right to inspect the records maintained by the
Contractor concerning such workman from time to time and the Contractor to
produce of the Employer’s inspection in order to ascertain whether or not the
requirements of all such laws regulations, rules etc. have been complied by
the Contractor. In the event of the any contravention of such laws, regulations
rules etc. coming to light whether as a result of such inspection or otherwise,
the Employer shall have the right to require the Contractor to effect such
compliance within such time as the Employer may prescribe in that behalf and
in the event of the Contractor failing to effect such compliance within the time
prescribed by the Employer then the Employer shall without prejudice to his
rights be entitled to withhold from the amount payable to the Contractor any
amount payable to the workmen under any such laws, regulations or rules
and to make payment thereof to the workmen. The Employer shall also have
in that event the right to terminate the contract with immediate effect and to
exercise powers reserved to the Employer under the contract as result of
h. Special conditions, if any, pertaining to the tender is shown in Tender
Tenderer should mention estimate of time for Weeks/ Months:
completing the work shown in the tender.
I/We have read carefully the above terms and Conditions of Tender and agree to abide
Signature of the Contractor.......................... (Or his Authorized representative)
Name / Seal of the Contractor:
STAMP & SIGNATURE OF BIDDER
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
14506.pdf
pdf • 0.10 MB
BUDGETDOC_14506.pdf
pdf • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .