Loading…
Loading…
Tender Value
₹2.9 Cr
EMD Value
₹1 L
Closing Date
18 Jun 2026, 3:00 pm4d left
Superintending Engineer, Buildings North Circl
Superintending Engineer, Buildings North Circle
The Building have total plinth area of 778.30 sqm,368.00 sqm Ground floor, 368.00sqm First floor and 42.30 sqm Head room are provided
2026_PWD_855564_1
PWD/BLDG/TR/2938/2026_23_2_1/1
Open Tender
Civil Works - Buildings
365 days
Thavinjal
Please refer Tender documents.
10 documents required · 10 mandatory
₹8,270
Yes
₹1 L
Yes
12 Jun 2026
12 Jun 2026
20 Jun 2026
12 Jun 2026
18 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Detailed Estimate(Civil work) | ||||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | 16.97 | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.4 | cum | 240.45 | ₹95.94 | BI01010001010000000000000515BI0100001115 |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.6 | cum | 122.28 | ₹73.25 | BI01010001010000000000000515BI0100001116 |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.6 | cum | 7,404.03 | ₹4,435.01 | BI01010001010000000000000515BI0100001117 |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 0.6 | sqm | 360.41 | ₹216.25 | BI01010001010000000000000515BI0100001118 |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.6 | sqm | 941.31 | ₹564.79 | BI01010001010000000000000515BI0100001119 |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.4 | sqm | 712.02 | ₹284.1 | BI01010001010000000000000515BI0100001120 |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.8 | sqm | 897.16 | ₹716.83 | BI01010001010000000000000515BI0100001121 |
| 1.009 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 0.8 | sqm | 953.81 | ₹763.05 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
SBDcompositmerged.pdf
Tender Documents • 4.35 MB
BOQ_1445955.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid