Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.9 L+₹2.1 L (55.6%)Rejected-AOC | ₹5.9 L+₹2.1 L (55.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.3 L+₹3.5 L (93.3%)Rejected-AOC | ₹7.3 L+₹3.5 L (93.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹7.4 L+₹3.6 L (94.8%)Rejected-AOC | ₹7.4 L+₹3.6 L (94.8%) | L4 | Rejected-AOC L4 |
| 5 | L5₹7.7 L+₹3.9 L (103.8%)Rejected-AOC VPO KESHUPURA TEHSIL ELLENABAD DISTT SIRSA HARYANA 125055 | ELLENABAD | SIRSA | HARYANA | 125055 | ₹7.7 L+₹3.9 L (103.8%) | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
16 Feb 2021, 1:00 pmClosed
Devinder Kumar
C-1, Infocity, Gurugram
Providing and fixing of open gym equipment for Ward No 8, Zone II, Gurugram
2021_HRY_159120_1
MCG/EEH2/2021/3488
Open Tender
Civil Works - Others
Works
90 days
Sector 34 Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹20,000
21 Apr 2022
8 Feb 2021
17 Feb 2021
8 Feb 2021
16 Feb 2021
8 Feb 2021
Amount
N.S. Item
Arm and ShoulderWheel:-Providing, and fixing Arm and Shoulder Wheel of size 130X '1200 X 1350 mm make of Green Gym or Equivaletfabricated with main post of 140 mm dia and 3.0 mm thicrest of the pipes are 40mm dia and 2.5 mm thick all pipcmade up of hot roiled tubular steel and hot dippegalvanized, and powder coated using Akzo Nobel cequivalent of 80-120 micron thick. All welding joints of pipare robotic welded with joints scalloped as necessary andressed off removing sharp edges and burrs. Zinc primepaint to be applied at all welding points prior to finishinkPadals shall be made up of Nylon alloy with rounded edgof prevent any impact of injury and seat to be made frorvirgin LLDPE manufactured by rotational moulding witminimum thickness of plastic 4.00mm, colourful andresistant environmental friendly. Bearing used shall bmaintenance fire, duly oiled sealed and self lubricated madbY reputed company to be approved by Officer -in-ChargeEquipment to be fitted within built limiters to prevenunwanted movements. All open ends of pipe to be colourelby GI/LLDPE caps for user safety. The equipment to bfixed on ground with concrete of minimum strength M2:nd J shaped welded bolts and once the concrete is set, ft;he equipment on to it and cover nuts and bolts with the basMate cover, all complete as per direction and approval
Double Cross Walker/ Cross trainer double:-Providing, and fixing Double Cross Walker of size 1600 X600 X 1600 mm make of Green Gym or Equivalent fabricated with main post of 140 mm dia and 3.0 mm thick rest of the pipes are 40 mm dia and 2.5 mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Officer -in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength N425 and J shaped welded bolts and once the concrete is
Pull Chair:-Providing, and fixing of Pull pair of size 2500 X 800 X2000 mm make of Green Gym or Equivalent fabricated withmain post of 140 mm dia and 3.0 mm thick rest of the pipesare 40mm dia and 3.0 mm thick all pipes made up of hotroiled tubular steel and hot dipped galvanized, and powdercoated using Akzo Nobel or equivalent of 80-120 micronthick. All welding joints of pipe are robotic welded withjoints scalloped as necessary and dressed off removing sharpedges and burrs. Zinc .primer paint to be applied at allwelding points prior to finishing. Pedals shall be made upof Nylon alloy with rounded edge of prevent any impact ofinjury and seat to be' made from virgin LLDPEmanufactured by rotational moulding with minimumthickness of plastic 4.00mm, colourful and U V resistantenvironmental friendly. Bearing used shall be maintenancefree, duly oiled sealed and self lubricated made by reputedcompany to be approved by Officer-in-Charge. Equipment tobe fitted within built limiters to prevent unwantedmovements. All open ends of pipe to be coloured byGULLDPE caps for user safety. The equipment to be fixedon ground with concrete of minimum strength M25 and Jshaped welded bolts and once the concrete is set, fix
Horse Rider Station:- Providing, and fixing of horse rider station of size 1000 x600 x 1100 mm make of Green Gym or Equivalent fabricated with main post of 140 mm dia and 3.0 mm thick rest of the pipes are 40mm dia and 2.5 mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Alczo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Padals shall be made up Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is
Twister:-Providing, and fixing Twister of size 1700 X 1300 X 1300 mmmake of Green Gym or Equivalent fabricated with main post of140 mm dia and 3.0 mm thick rest of the pipes are 40mm diaand 2.5 mm thick all pipes made up of hot rolled tubular steeland hot dipped galvanized, and powder coated using AkzoNobel or equivalent of 80-120 micron thick. All welding jointsof pipe are robotic welded with joints scalloped as necessaryand dressed off removing sharp edges and burrs. Zinc primerpaint to be applied at all welding points prior to finishing.Padals shall be made up of Nylon alloy with rounded edge ofprevent any impact of injury and seat to be made from virginLLDPE manufactured by rotational moulding with minimumthickness of plastic 4.00mm, colourful and U V resistantenvironmental friendly. Bearing used shall be maintenancefree, duly oiled sealed and self lubricated made by reputedcompany to be approved by Officer-in-Charge. Equipment to befitted within built limiters to prevent unwanted movements. Allopen ends of pipe to be coloured by GI/LLDPE caps for usersafety. The equipment to be fixed on ground with
JASHMINE INTERNATIONAL
Shiv engineers and FRP Composites
Ravinder sharma
Ravi Contractor
Khalsa Gymnastic Works
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .