| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC E I HOUSE ERTHUMKADAVU MUTATHODY POST KASARAGOD 671121 | KASARAGOD | KASARAGOD | KERALA | 671121 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹5,551.33 (1.50%)Rejected-Finance MASTIKUNDU MULIYAR KASARAGOD | KANNUR | KERALA | 670511 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical tender document not submitted | |
| 4 | Rejected-Technical | - | Rejected-Technical tender document not submitted |
Tender Value
₹4.5 L
EMD Value
₹11,141
Closing Date
15 Jan 2020, 4:00 pmClosed
ASST EXE ENGINEER.PWD BUILDINGS SUBDIVISION KASARA
ASST EXE ENGINEER.PWD BUILDINGS SUBDIVISION KASARA
CIVIL STATION KASARAGOD- RENOVATION WORKS TO PARKING SHEDNEAR CANTEEN BUILDING
2020_PWD_334431_1
D2/15/e-tender/2019-20
Open Tender
Civil Works - Buildings
Item Rate
180 days
VIDYANAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹985
online
₹11,141
Yes
19 Aug 2020
6 Jan 2020
18 Jan 2020
6 Jan 2020
15 Jan 2020
6 Jan 2020
Amount
Appendix A
od53317/2019_2020 : Chipping and removing old spalled / defective concrete and exposing the defective /corroded reinforcement of the concrete , Removal of the defective concrete across the bar should be atleast 2mm beyond the defective bar so that the reinfocing bar can be cleaned with emery ribbon , wirebrush etc. after cleaning the bar wash the bar with clean water and collect all the spalled / fallen concrete.measurement is calculated for whole exposed area. Including cost of materials, labour charges, conveyance of materials to site hire charges of tools etc complete.
od53318/2019_2020 : Cleaning of reinforcement in spalled / damaged concrete and applying one coat of corrosion inhibitant nitrozinc two component primer. Care should be taken to ensure that zink rich primer coat should make an unbrocken continuous film on the bars. After priming the bar applying one coat of bonding agent Nitobond SBR. in spalled / damaged concrete area.including cost of materials, labour charges,conveyance of materials to site hire charges of tools, scaffolding etc complete.
od53319/2019_2020 : Applying high build polymer modified cementitious reinstatement mortar Renderoc HB29 kg/1sqm prefeable with hand using wet on method to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the spalled concrete are cleaned and primed previously Including cost of meterials, labour charges,conveyance of meterials to site hire charges of tools, scaffolding etc complete.
od53320/2019_2020 : Plastering the rectified concrete surface with modified mortar, modified with polymer like Nitobond AR ( 10 ltrs polymer in 50 kg cement ) to an average thickness of 15mm. Including cost of meterials,labour charges,conveyance of meterials to site high charges of tools, scaffolding etc complete.
14.1.1 : Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
od53321/2019_2020 : Repairing and refixing of rolling shutters after necessory maintenance works including all labour charges etc complete.
10.6.1 : Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
10.7 : Providing and fixing ball bearing for rolling shutters.Providing and fixing ball bearing for rolling shutters.
14.43 : Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
14.44 : Distempering with dry distemper of approved brand and manufacture ( one or more coats ) and of required shade on old work to give an even shade.Distempering with dry distemper of approved brand and manufacture ( one or more coats ) and of required shade on old work to give an even shade.
14.53.1 : Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
13.7.2 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
muhammed shafi A.B
Basheer
edneer labour contract co operative society
Bidder Name
E I MUHAMMED
Basheer
edneer labour contract co operative society
muhammed shafi A.B
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_466168.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .