| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC | ₹18.8 L | L1 | Accepted-AOC ok |
| 2 | L2₹18.9 LRejected-Finance VPO BHATGAON TEHSIL AND DISTT SONEPAT 131001 | SONEPAT | SONEPAT | HARYANA | 131001 | ₹18.9 L | L2 | Rejected-Finance HIGHER |
| 3 | L3₹19.6 LRejected-Finance | ₹19.6 L | L3 | Rejected-Finance HIGHER |
| 4 | L4₹21.2 LRejected-Finance GANAUR SUNIL BUILDING MATERIAL SOTRE MC ROAD GANAUR DISTT SONIPAT | GANAUR | SONIPAT | HARYANA | ₹21.2 L | L4 | Rejected-Finance HIGHER |
Tender Value
₹25.0 L
EMD Value
₹50,100
Closing Date
14 Jan 2026, 10:00 amClosed
Vishal Garg
Muncipal Corporation Sonipat
1189 - Estimate for construction of various streets with IPB tile in village in Indra colony ,sidharth enclave and sec 26/26A in ward 7 under MC Sonipat.
2026_HRY_495353_1
2026FFCB9028 98AE 4E40 B2F1 6FA1448A9F23292ULB
Open Tender
Civil Works
180 days
Sonepat
2 documents required · 2 mandatory
₹5,000
₹50,100
Yes
3 Mar 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
7 Jan 2026 - 9 Jan 2026
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means [Through Rate]
[17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.8]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 8. 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]
[6.34.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
Credit (Recovery) of Dismantled IPB TILES bats
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_573843.xls
BOQ • 0.29 MB
AD0147778.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid