Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC CHITHIRA PARAVILA H S ROAD ESLPR3043B | KOZHIKODE | KERALA | 612906 | ₹6.1 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹6.1 LRejected-AOC | ₹6.1 L | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹6.5 LRejected-AOC | ₹6.5 L | L3 | Rejected-AOC L3 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 bidder |
| Sl No | Description | Qty | Unit | RAJESH KUMAR L1 | ARAVINDAKSHAN K L2 | D Sugathan L4 | ARJUN S S L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Total of BoQ1 | 1 | Nos | 6,05,212.77 ₹6,05,212.77 | 6,08,836.8 ₹6,08,836.8 | 6,47,976.3 ₹6,47,976.3 | 6,47,251.5 ₹6,47,251.5 |
Tender Value
₹7.2 L
EMD Value
₹18,200
Closing Date
23 May 2026, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,Electrical Sub Division Chathannoor
RECONDUCTORING USING LT ABC AT KALUNGU TR AREA UNDER ELECTRICAL SECTION POOTHAKKULAM
2026_KSEB_850646_1
TENDER/2026-27/4229/7 dtd 12.05.2026
Open Tender
Electrical Works
90 days
KALUNGU TR AREA
Please refer GCC
4 documents required · 4 mandatory
₹1,500
Yes
₹18,200
Yes
1 Jul 2026
14 May 2026
30 May 2026
14 May 2026
23 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LABOUR | |||||
| 1.01 | (553) Dismantling one damaged LT PSC/RCC
pole after disconnecting stays, strut etc.
attached thereon and stacking the same. | - | No | 1,008.86 | - |
| 1.02 | (205) Providing Stay for LT poles including
digging & back filling pit in ordinary
soil. | - | No | 938.82 | - |
| 1.03 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)
including digging separate pit
(0.45x0.45x1.5m) at standard distance
away from the pole/structure in ordinary
soil & backfilling. | - | No | 1,086.23 | - |
| 1.04 | (204) Erecting one LT PSC Pole in position
including digging & back filling pit in
ordinary soil. | - | No | 2,017.73 | - |
| 1.05 | (209) Additional rate for excavation of one Pit
for LT Pole/LT Stay in Hard Laterite. | - | No | 434.91 | - |
| 1.06 | (407) Renewal of existing damaged/broken old
LT stay in existing stay rod. | - | No | 434.91 | - |
| 1.07 | (206) Providing Strut using LT PSC pole
including digging and back filling pit in
ordinary soil. | - | No | 1,887.05 | - |
| 1.08 | (421) Straightening one slanted LT pole after
unbinding the line and binding the line
after work. | - | No | 1,027.68 | - |
| 1.09 | (451) Disconnecting and lowering down the
single phase WP service connection with
guy wire from the OH line and
reconnecting the same after completing
the line work. | - | No | 96.18 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1437351.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.02 MB
BOQ_1437351.xls
BOQ • 0.30 MB
GCC.pdf
Tender Documents • 0.25 MB
AGMT.pdf
Other Document • 0.34 MB
NIT.pdf
Other Document • 0.00 MB
Download all tender documents and submit your bid