| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-AOC THEERTHAM NADUVILEMURI PADANILAM POST NOORANAD ALAPPUZHA DIST KERALA 690529 | ALAPPUZHA | KERALA | 690529 | L1 | Accepted-AOC Awarded contract being lowest | |
| 2 | L2₹42.6 L+₹4.7 L (12.4%)Rejected-AOC | L2 | Rejected-AOC Rejected not being lowest |
| Sl No | Description | Qty | Unit | Green Ray Enterprises L1 | ELSOL ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Material and labour for servicing of 2 Nos 2 HP booster pumps, 230V by checking functionality, abnormality, cleaning, proper alignment of fan covers, tightening nut bolts including scrapping of rust and painting on pumps, 20 ltrs expansion tank complete all as specified and as directed. | 1 | Each Job | 16,000 ₹16,000 | 14,700 ₹14,700 Lowest |
| 2.00 | Supply & Fix in replacement of single phase computerized alternating twin pump controller suitable to operate 2 Nos 2 HP booster pumps alternatively with following features,
a) short circuit protection,
b) overload protection,
c) low voltage protection,
d) dry run protection,
e) 1 inch graphic display showing voltage, current, Auto/manual mode, pressure switch high/low
f) Both pumps bypass toggle switches,
g) Inbuilt timers for ON time/OFF time.
complete all as specified and interconnected with fioat switch/pressure switch, making electrical connections and testing at site including taking down unserivecable panel | 1 | Each | 34,000 ₹34,000 | 18,900 ₹18,900 Lowest |
| 3.00 | Supply & Fix in replacement of float switch with counter weight to interconnect with booster pump for safety of dry run complete all as specified and as directed. | 1 | Each | 800 ₹800 Lowest | 900 ₹900 |
| 4.00 | Supply & Fix in replacement of pressure switch (regulation range 2-14 bar, diff range 0.7 to 4 bar) including taking down unserivceable complete all as specified and as directed. | 1 | Each | 2,500 ₹2,500 Lowest | 2,540 ₹2,540 |
| 5.00 | Supply & Fix in replacement liquid filled pressure gauge (0-10 bar/0-150 Psi ) including taking down unserviceable complete all as specified and as directed. | 1 | Each | 2,300 ₹2,300 Lowest | 2,390 ₹2,390 |
| 6.00 | Material and labour for 3 phase centrifugal monoblock pumpset foundation alignment upto 10 HP capacity including disconnection of pumpset electrical connections/suction and delivery pipes,removing of pumpset from foundations, removing of rusted/broken foundation bolts by dismantling of PCC/RCC and making good of foundation by observing with water level indicator/ mercury level indicator maintaining asthetic view and re-fixing pumpset with new foundation bolts on re- aligned foundation and testing at site complete all as specified and as directed. | 15 | Each Job | 2,800 ₹42,000 Lowest | 4,300 ₹64,500 |
| 7.00 | All as per item No. 6 here-in-before but of capacity single phase, 1 HP pumpsets. | 35 | Each Job | 1,700 ₹59,500 Lowest | 3,600 ₹1,26,000 |
| 8.00 | Supply & Fix in replacement of powder coated metal safety guards of min size 300mmx200mmx220mm complete all as specified and as directed. | 25 | Each | 1,900 ₹47,500 Lowest | 3,200 ₹80,000 |
| 9.00 | Supply & Fix in replacement of dry run protection relay (current based) with adjustable current setting, single phase, 240V compatible with MU2P single phase DOL starter and testing with pump dry run complete all as specified and as directed by Engr-in-charge.
Make : L&T (i-AD) or equivalent in siemens/C&S
Note : The relay should trip the supply min 3 times of dry run condition inpresence of JE/AGE, otherwsie contractor has to ensure its functionality without extra cost. | 24 | Each | 1,650 ₹39,600 Lowest | 2,100 ₹50,400 |
| 10.00 | Supply & Fix in replacement of single phase preventer & dry run protection relay (current based) with adjustable current setting, three phase, 4l5V compatible with MK1/MU/MUG three phase starters and testing with pump dry run complete all as specified and as directed.
Make : L&T (i-ADS) or equivalent in siemens/C&S
Note : The relay should trip the supply min 3 times of dry run condition inpresence of JE/AGE, otherwsie contractor has to ensure its functionality without extra cost. | 15 | Each | 2,600 ₹39,000 Lowest | 3,200 ₹48,000 |
Tender Value
₹39.9 L
EMD Value
₹79,840
Closing Date
11 Feb 2026, 6:00 pmClosed
GE(MAINT)EZHIMALA
GARRISON ENGINEER (MAINT) MILITARY ENGINEER SERVICES INDIAN NAVAL ACADEMY POST KANNUR DIST KERALA 670 310
AS PER BOQ AND TENDER DOCUMENTS
2025_MES_741519_2
GE MAINT EZHIMALA 8806
Open Tender
Civil Works
Item Rate
330 days
Ezhimala
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (Maint) Ezhimala
₹79,840
Yes
19 Mar 2026
20 Jan 2026
17 Feb 2026
20 Jan 2026
11 Feb 2026
4 Feb 2026
20 Jan 2026 - 27 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for servicing of 2 Nos 2 HP booster pumps, 230V by checking functionality, abnormality, cleaning, proper alignment of fan covers, tightening nut bolts including scrapping of rust and painting on pumps, 20 ltrs expansion tank complete all as specified and as directed. | 1 | Each Job | - | - |
| 2 | Supply & Fix in replacement of single phase computerized alternating twin pump controller suitable to operate 2 Nos 2 HP booster pumps alternatively with following features,
a) short circuit protection,
b) overload protection,
c) low voltage protection,
d) dry run protection,
e) 1 inch graphic display showing voltage, current, Auto/manual mode, pressure switch high/low
f) Both pumps bypass toggle switches,
g) Inbuilt timers for ON time/OFF time.
complete all as specified and interconnected with fioat switch/pressure switch, making electrical connections and testing at site including taking down unserivecable panel | 1 | Each | - | - |
| 3 | Supply & Fix in replacement of float switch with counter weight to interconnect with booster pump for safety of dry run complete all as specified and as directed. | 1 | Each | - | - |
| 4 | Supply & Fix in replacement of pressure switch (regulation range 2-14 bar, diff range 0.7 to 4 bar) including taking down unserivceable complete all as specified and as directed. | 1 | Each | - | - |
| 5 | Supply & Fix in replacement liquid filled pressure gauge (0-10 bar/0-150 Psi ) including taking down unserviceable complete all as specified and as directed. | 1 | Each | - | - |
| 6 | Material and labour for 3 phase centrifugal monoblock pumpset foundation alignment upto 10 HP capacity including disconnection of pumpset electrical connections/suction and delivery pipes,removing of pumpset from foundations, removing of rusted/broken foundation bolts by dismantling of PCC/RCC and making good of foundation by observing with water level indicator/ mercury level indicator maintaining asthetic view and re-fixing pumpset with new foundation bolts on re- aligned foundation and testing at site complete all as specified and as directed. | 15 | Each Job | - | - |
| 7 | All as per item No. 6 here-in-before but of capacity single phase, 1 HP pumpsets. | 35 | Each Job | - | - |
| 8 | Supply & Fix in replacement of powder coated metal safety guards of min size 300mmx200mmx220mm complete all as specified and as directed. | 25 | Each | - | - |
| 9 | Supply & Fix in replacement of dry run protection relay (current based) with adjustable current setting, single phase, 240V compatible with MU2P single phase DOL starter and testing with pump dry run complete all as specified and as directed by Engr-in-charge.
Make : L&T (i-AD) or equivalent in siemens/C&S
Note : The relay should trip the supply min 3 times of dry run condition inpresence of JE/AGE, otherwsie contractor has to ensure its functionality without extra cost. | 24 | Each | - | - |
| 10 | Supply & Fix in replacement of single phase preventer & dry run protection relay (current based) with adjustable current setting, three phase, 4l5V compatible with MK1/MU/MUG three phase starters and testing with pump dry run complete all as specified and as directed.
Make : L&T (i-ADS) or equivalent in siemens/C&S
Note : The relay should trip the supply min 3 times of dry run condition inpresence of JE/AGE, otherwsie contractor has to ensure its functionality without extra cost. | 15 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.09 MB
BOQ_839120.xls
BOQ • 0.52 MB
TenderDocument8806.pdf
Tender Documents • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .