| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder. Hence accepted | |
| 2 | L2₹3.3 L+₹18,549.94 (5.89%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest bidder. Hence rejected | |
| 3 | L3₹3.7 L+₹57,602.16 (18.3%)Rejected-AOC | L3 | Rejected-AOC 3rd lowest bidder. Hence rejected |
| Sl No | Description | Qty | Unit | Varghese.K.T L1 | k v john L3 | SHAMEEM.K L2 |
|---|---|---|---|---|---|---|
| 1.00Pre Monsoon | ||||||
| 1.00 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 1,200 | sqm | 26.36 ₹31,632 | 31.17 ₹37,404 | 26 ₹31,200 Lowest |
| 1.00 | OD73179/2025-2026:Engaging man for clearing drain, clearing vent way of chocked culverts removal of cover slab,
Pavement, sweeping, removal of debris from roads, clearing all type of waste from road
clearing foot path/ pedestrian area, maintenance of sign board etc | 46 | no | 963.02 ₹44,298.92 Lowest | 1,139.05 ₹52,396.3 | 1,030 ₹47,380 |
| 1.00 | OD73182/2025-2026:Engaging Hydraulic Excavator for removing Choked wastes and other rubbish etc. | 48 | hour | 1,194.44 ₹57,333.12 Lowest | 1,412.77 ₹67,812.96 | 1,284 ₹61,632 |
| 1.00 | OD73178/2025-2026:Tipper for removal of all debris and excavated waste materials away from site. | 6 | Day | 5,598.93 ₹33,593.58 Lowest | 6,622.4 ₹39,734.4 | 6,000 ₹36,000 |
| 1.00 | OD73177/2025-2026:Hire Charge For Wood Cutting Equipment's, pulleys etc. | 15 | Day | 281.33 ₹4,219.95 Lowest | 332.75 ₹4,991.25 | 300 ₹4,500 |
| 1.01 | OD73181/2025-2026:Engaging Wood Cutter for cutting down the dangerously standing tress and its branches. | 30 | each | 1,069.04 ₹32,071.2 Lowest | 1,264.45 ₹37,933.5 | 1,100 ₹33,000 |
| 1.01 | OD73180/2025-2026:Construction of granular sub-base by providing graded material, spreading in uniform layers in manual means on a prepared surface, mixing by mix in-place method at OMC, and compacting with a surface vibrator to achieve the desired density-Mix in Place Method | 12.93 | cum | 2,941.44 ₹38,018.11 Lowest | 3,479.12 ₹44,967.63 | 3,160 ₹40,843 |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 95 | sqm | 11.36 ₹1,079.2 Lowest | 13.44 ₹1,276.8 | 12 ₹1,140 |
| 1.01 | OD73184/2025-2026:Filling up pot holes with bituminous ready mix compound (25 kg/bag) and compacting
by ramming to get a compact surface including cost of materials, laying charges,
transportation to site etc complete. Rate arrived for a bag of 25 kg after applying a
tack coat on surface. | 102 | no | 714.99 ₹72,928.98 Lowest | 845.69 ₹86,260.38 | 765 ₹78,030 |
Tender Value
₹3.4 L
EMD Value
₹8,472
Closing Date
3 Jul 2025, 5:30 pmClosed
Executive Engineer KRFB PMU Palakkad Malappuram
Office of the Executive Engineer, KRFB PMU, Palakkad/Malappuram, Shoranur, 679121
KIIFB-KIIFB-Manjeri Olipuzha Road-Pre monsoon work 2025 in Manjeri Olipuzha road and Coastal highway reaches in Malappuram district.-General Civil Work
2025_KRFB_771726_1
PWD/KR/TR/22118/2022_5_16_15/1
Open Tender
Civil Works - Roads
Item Rate
90 days
Pandikkad
Please refer tender documents
7 documents required · 7 mandatory
₹750
Yes
₹8,472
Yes
8 Aug 2025
25 Jun 2025
5 Jul 2025
25 Jun 2025
3 Jul 2025
25 Jun 2025
Amount
Pre Monsoon
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD73179/2025-2026:Engaging man for clearing drain, clearing vent way of chocked culverts removal of cover slab, Pavement, sweeping, removal of debris from roads, clearing all type of waste from road clearing foot path/ pedestrian area, maintenance of sign board etc
OD73182/2025-2026:Engaging Hydraulic Excavator for removing Choked wastes and other rubbish etc.
OD73178/2025-2026:Tipper for removal of all debris and excavated waste materials away from site.
OD73177/2025-2026:Hire Charge For Wood Cutting Equipment's, pulleys etc.
OD73181/2025-2026:Engaging Wood Cutter for cutting down the dangerously standing tress and its branches.
OD73180/2025-2026:Construction of granular sub-base by providing graded material, spreading in uniform layers in manual means on a prepared surface, mixing by mix in-place method at OMC, and compacting with a surface vibrator to achieve the desired density-Mix in Place Method
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD73184/2025-2026:Filling up pot holes with bituminous ready mix compound (25 kg/bag) and compacting by ramming to get a compact surface including cost of materials, laying charges, transportation to site etc complete. Rate arrived for a bag of 25 kg after applying a tack coat on surface.
SHAMEEM.K (BID ID -2239761)
k v john (BID ID -2239919)
Bidder Name
Varghese.K.T
k v john
SHAMEEM.K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1259674.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .