Head Works Sub Division, Peechi
Assistant Executive Engineer Head Works Sub Division, Peechi
PEECHI SCHEME- Protection Works and Leak Proofing Works of RBMC from Ch.0-200 to 0-300 Km.
2021_Irrig_420680_1
87/AEE/2020-21(Retender)
Open Tender
Civil Works - Canal
Item Rate
120 days
Peechi
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹20,100
6 Sept 2021
19 Mar 2021
31 Mar 2021
19 Mar 2021
26 Mar 2021
19 Mar 2021
Amount
RBMC Ch.0/200 to 0/300 km
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) as per the direction of departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more as per the direction of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site
SHIBU.P.E
PRASAD.K
Bidder Name
PRASAD.K
SHIBU.P.E
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_597286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .