| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Fee/PreQual/Technical/Finance | -23.33% | ₹22.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹28.5 L+₹6.2 L (27.7%)Admitted-Fee/PreQual/Technical/Finance | -2.11% | ₹28.5 L+₹6.2 L (27.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹28.8 L+₹6.4 L (28.9%)Admitted-Fee/PreQual/Technical/Finance | -1.20% | ₹28.8 L+₹6.4 L (28.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹28.8 L+₹6.5 L (29.1%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹28.8 L+₹6.5 L (29.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹29.1 L
EMD Value
₹58,260
Closing Date
3 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Development of lotus and Duck Garden at Pehllipora Manasbal Resort by way of Barbed fencing of State Land-Phase 1st.
2026_PWDJK_318245_1
NIT No.43-2026-27
Open Tender
Civil Works
Percentage
60 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division Ganderbal
₹58,260
21 Sept 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 143.35 | Cum | 256.85 | ₹36,819.45 |
| 2 | Dry random rubble masonry (Nallah) with hard stone in foundation and plinth: With bond stone all complete. | 191.13 | Cum | 3,262.1 | ₹6,23,485.17 |
| 3 | Carriage of RRm Stones for an average lead of 10 Kms incl Head Load 500 mtrs | 191.13 | Cum | 1,026.49 | ₹1,96,193.03 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete. | 31.54 | Cum | 5,202.9 | ₹1,64,099.47 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete. | 166.93 | Cum | 6,591.25 | ₹11,00,277.36 |
| 6 | Carriage of Material :- 20mm Stone agg. for an avg lead of 10 Kms incl head Load 500 mtrs | 178.62 | Cum | 872.92 | ₹1,55,920.97 |
| 7 | Carriage of Material :- Sand for an avg lead of 15 Kms incl head Load 500 mtrs | 89.31 | Cum | 938.37 | ₹83,805.82 |
| 8 | Structural steel work (welded ) in built up sections, trusses and framed work, including MS sheet eveas boarding and soffits, cutting, hoisting and fising in position and applying of priming coat of approved steel primer including MS sheets for eves boarding and soffit projaction etc carriage of material all complete. | 2,151 | Kgs | 138.2 | ₹2,97,268.2 |
| 9 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made perimeter cost of total length of barbed wire used With G.I. barbed wire all complete. | 2,881.09 | Rm | 19.85 | ₹57,189.64 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or More Coats | 627.32 | Sqm | 131.85 | ₹82,712.14 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.55 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1047355.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .