| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹10.0 L+₹2,024 (0.20%)Rejected-AOC LOCATION UTTARAKHAND UT | L2 | Rejected-AOC second lowest bidder | |
| 3 | L3₹10.0 L+₹2,470 (0.25%)Rejected-AOC | L3 | Rejected-AOC third lowest bidder |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
23 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE,EDD,Ranikhet
Office of the EE,EDD,Ranikhet
Replacement of damaged poles at Chaukhutia section
2022_UPCL9_47114_1
17/2022-23 EDD(R)
Open Tender
Electrical Works
Item Wise
60 days
EDS Chaukhutia
As per tender document
2 documents required · 2 mandatory
₹590
EE,EDD,Ranikhet
₹30,000
26 Sept 2023
27 Jul 2022
24 Aug 2022
28 Jul 2022
23 Aug 2022
28 Jul 2022
90 days
Amount
Shackle Insulator 75*90 with Nuts &bolts
Stay insulator
Stay clamp SP-21 with N&B
Stay clamp SP-10 with Nuts &bolts
LT clamp SP-21 with Nuts &bolts
LT clamp SP-10 with Nuts &bolts
Cartage of STP SP-21 pole from store centre to construction site with loading , unloading at both points and proper stocking (avg. distance 110 km)
Cartage of STP SP-10pole from store centre to construction site with loading , unloading at both points and proper stocking (avg. distance 110 km)
Cartage of small material from store centre to construction site with loading , unloading at both points and proper stocking (avg. distance 110 km)
Head load cartage of STP SP-21pole from dump store to work site(avg. distance 3 km)
Head load cartage of STP SP-10 pole from dump store to work site(avg. distance 3 km)
Head load cartage of small material from dump store to work site(avg. distance 3 km)
Dismantling of damaged wooden pole alongwith all accessories
Dismantling of damaged ST-SP-21/10 pole along with all accessories
Excavation of earth for STP SP-10 (0.9*0.6*1/6*8.0 cum=0.720 cum per pole) pit of size 0.9*0.6*1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and raming of bottom including getting out the excavated soil as directed complete work.
Excavation of earth for STP SP-21 (0.9*0.6*1/6*8.5 cum=0.765 cum per pole) pit of size 0.9*0.6*1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and raming of bottom including getting out the excavated soil as directed complete work.
Errection of STP-21 pole in proper level and alignment alongwith fixing of all accessories like top channel & clamp as per RESPO construction mannual.
Errection of STP-10 pole in proper level and alignment alongwith fixing of all accessories like top channel & clamp as per RESPO construction mannual.
Grouting of STP SP-10 pole in size 0.45*0.45*1/9 of support in CC ratio 1:4:8 block including cost of cement, sand, stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.
Grouting of STP SP-21 pole in size 0.45*0.45*1/9 of support in CC ratio 1:4:8 block including cost of cement, sand, stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.
Muffing of poles size 0.45*0.60 cm radius with CC 1:3:6 block and 45 cm height from ground level including cost of ballast, cement and sand etc.
Excavation of earth for stay pit of size 0.60*0.60*1.20 mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excabvated soil and disposal of suplus excavated soil as directed complte work. (0.6*0.6*1.20 cum=0.432 cum per pole
Fixing, tightning and nozzling of stay with pole and stay rod on required tension as drawing/RESPO manual.
Grouting of stay in size 0.60*0.60*0.30 in CC ratio 1:4:8 block including cost of cement,sand stone ballast back filling of soil and boulders in pit and ramming and proper alignment,leveling as per RESPO construction manual.(0.6*0.6*0.3 cum= 0.108 cum per pole)
Laying , spreading stringing and sagging of LT line after replacement of damage wooden/ST pole with complete binding and jumpeeing as per RESPO.
Back head load cartage of pole scrap from site to road site(avg. distance 3.0 km)
Back cartage of pole pole scrap from road site to Electricity Store Center Haldwani/Almora (165 km)
AJAY KUMAR CHAUHAN
TARA SINGH BISHT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .