Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | -25.25% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.7 L+₹2.8 L (18.9%)Admitted-Fee/PreQual/Technical/Finance | -11.11% | ₹17.7 L+₹2.8 L (18.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.7 L+₹2.8 L (19.1%)Admitted-Fee/PreQual/Technical/Finance | -11.00% | ₹17.7 L+₹2.8 L (19.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.9 L
EMD Value
₹39,840
Closing Date
19 Aug 2026, 3:00 pmClosed
Xen IFC Sopore
Xen IFC Sopore
Botingoo Nallah Flood Protection work on Botingoo Nallah at RD 2100M (Approx length 180 m).
2026_IFC_320853_5
enit.08.IFCD.SPR.2026.27
Open Tender
Civil Works
Percentage
485 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Chief Engineer IFC Dept Srinagar
₹39,840
25 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by Mechanical Means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 594.48 | Cum | 187.3 | ₹1,11,346.1 |
| 2 | Dumping stone including cost of stones.in Horizontal on level | 64.3 | Cum | 937.9 | ₹60,306.97 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8.43 | Cum | 5,202.9 | ₹43,860.45 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 156.46 | Cum | 6,591.25 | ₹10,31,266.98 |
| 5 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | 126 | Cum | 3,350.85 | ₹4,22,207.1 |
| 6Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 6.1 | Foundations, footings, bases for columns | 521.56 | Sqm | 286.35 | ₹1,49,348.71 |
| 7Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking etc | |||||
| 7.1 | Stone soling and Boulder for an avg lead of 15 kms | 171.4 | Cum | 405.31 | ₹69,470.13 |
| 7.2 | stone Aggregate 40 mm for an avg lead of 25 kms | 7.58 | Cum | 505.64 | ₹3,832.75 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1068108.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .