Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC R O VILLAGE P O BAKRAS TEHSIL SHILLAI DISTT SIRMOUR HP | ₹2.5 L Quoted ₹2.7 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹2.7 L+₹1,002 (0.37%)Rejected-AOC | ₹2.7 L+₹1,002 (0.37%) | 2 | Rejected-AOC Reject |
| 3 | 3₹2.8 L+₹4,056 (1.48%)Rejected-AOC BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹2.8 L+₹4,056 (1.48%) | 3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | Naveen Kumar L3 | Sohan Singh L1 | uday mandhotra L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick work as per direction and to the entire satisfaction of Engineer-in-Charge. | 18 | Cum | 365 ₹6,570 | 350 ₹6,300 Lowest | 355 ₹6,390 |
| 2.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts. | 12.06 | Cum | 315 ₹3,798.9 | 300 ₹3,618 Lowest | 305 ₹3,678.3 |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish Including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:- | ||||||
| 3.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 38.55 | Sqmt | 380 ₹14,649 | 365 ₹14,070.75 Lowest | 370 ₹14,263.5 |
| 4.00Providing and laying PVC pipe for weepehole in retaining wall and breast wall 10.0 kgf/cm working pressure unplasticized P.V.C Pipes (Conforming to IS: 4985-1968) to make weep holes complete including making good the walls. | ||||||
| 4.01 | 110 mm nominal bore | 18 | Rmt | 375 ₹6,750 | 250 ₹4,500 Lowest | 265 ₹4,770 |
| 5.00 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand: 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge. | 38.84 | Cum | 6,320 ₹2,45,468.8 | 6,300 ₹2,44,692 Lowest | 6,310 ₹2,45,080.4 |
Tender Value
₹2.9 L
EMD Value
₹5,770
Closing Date
6 Mar 2026, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Restoration of rain damages to Multi villages Rural piped water supply scheme for Kamlah and Mandap area in Tehsil Dharampur Distt. Mandi HP
2026_HPIPH_129735_1
16048-16097 Dated 25-02-2026
Open Tender
Civil Works
Item Rate
Dharampur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹5,770
7 May 2026
26 Feb 2026
7 Mar 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick work as per direction and to the entire satisfaction of Engineer-in-Charge.
Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish Including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in:-
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing and laying PVC pipe for weepehole in retaining wall and breast wall 10.0 kgf/cm working pressure unplasticized P.V.C Pipes (Conforming to IS: 4985-1968) to make weep holes complete including making good the walls.
110 mm nominal bore
Providing and laying cement concrete 1:5:10 (1 cement :5 sand: 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form6.pdf
Tender Documents • 0.82 MB
Form8.pdf
Tender Documents • 1.28 MB
BOQ_191790.xls
BOQ • 0.28 MB
TC.pdf
Tender Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .