Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2.5 L
EMD Value
₹6,339
Closing Date
7 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
LIDEW SECTION KUMARAKOM GP
Annual Plan-Kumarakom GP-Pro.no.98--Concreting of Chittoor Kollamparambu Road Construction of Retaining Wall in Ward 8-General Civil Work (Re-tender)
2025_LSGD_824378_1
98/AE/LIDEW/KGP/25-26
Open Tender
Civil Works - Roads
Item Rate
120 days
Kumarakom
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
Yes
₹6,339
Yes
30 Dec 2025
30 Dec 2025
9 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
Side wall construction & road reconcreting
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
OD358259/2025-2026:DRY RUBBLE MASONRY IN FOUNDATION AND SUPERSTRUCTURE WITHOUT CONCRETE LEVELLING COURSE MASONRY WITH GOOD QUALITY BLASTED RUBBLE INCLUDING PACKING TO COMPACTNESS TO LINE AND LEVELS INCLUDING COST AND CONVEYANCE ETC COMPLETE (2018 DSR MODIFIED ITEM NO 60.7.1)
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD374495/2025-2026:Filling with contractors own earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1.5m as per direction of site engineer in charge( modified item No. 50.2.25.1) 50.2.25.1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
NIT98.pdf
Tender Documents • 0.03 MB
SBD98.pdf
Other Document • 1.80 MB
BOQ_1382071.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .