Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAdmitted-Finance HADAPSAR INDUSTRIAL ESTATE HADAPSAR INDUSTRIAL ESTATE HADAPSAR POST OFFICE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
1 Jun 2020, 1:00 pmClosed
LT CDR PRASANT RATHORE
FMU MUMBAI NAVAL DOCKYARD
REPAIR/ MAINTENANCE OF M/S KPCL MAKE AIR CONDITIONING PLANTS FITTED ONBOARD KOLKATA CLASS
2020_NAVY_335504_1
FMU/344/PA/AC PLANTS/P15A
Single
Marine Services
Turn-key
365 days
FMU MUMBAI NAVAL DOCKYARD
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
PCDA NAVY
₹4.2 L
Yes
8 Jun 2020
20 Mar 2020
2 Jun 2020
20 Mar 2020
1 Jun 2020
21 Mar 2020
21 Mar 2020 - 26 Mar 2020
Amount
Service charges for 1st year
Compressor
Replacing shaft seal Assembly
Annual Inspection and replacement of 'O' rings
Overhauling of compressor - replacement of journal and thrust bering, renewal of all lock washers and 'o' rings
Checking compressor loading unloading machanism and resetting the limit switches
Calibration of liner position indicator
Compressor motor - 160KW
Replacement of terminal box OR cooling fan
Checking and aligning compressor - motor assembly
Condensor
Chemical clening of condensor and pressure testing OR prrssure testing of condensor for identifying refrigent leak detection and identification of defective tubes
Replacement of defective condesor tube (per tube)
Renewal of cover flange bolt (per bolt)
Evaporator
Chemical clening of condensor and pressure testing OR prrssure testing of condensor for identifying refrigent leak detection and identification of defective tubes
Replacement of defective condesor tube (per tube)
Renewal of cover flange bolt (per bolt)
Instruments and Controls
Calibration of the pressure switch, checking for proper working, resetting the switches and testing (per instrument)
Refurbishment of control wiring for each pressure switch/ solenoid valve
Checking of solenoid valve for proper working, replacement of solenoid coil and testing
calibration of the presure gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)
Calibaration of the temprature gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)
Calibration of FKD 40/41
starter panel and LCP
Checking the power and control connections, claening of control card, snubber card and minor parametrization chenges if required
Repalcement of MCCB OR replacemnt of soft starter
Repair of soft starter (only services)
Replacemnt of control transformer OR current transformar
Termination of power cable at motor side
Refrigeration system
Replacement of Ref line valves or vibration Eliminator or rectification of refrigerant leak by hot work or refrigerant charging or refrigerantretrival from the system (ICE and empty refrigerant bottle to be provided by the ship)
Vacuuming and pressure testing and setting to work of AC plant
Replacement of shock mounts (per mount) OR six mounth health audit of plant
Service charges for 2nd year
Compressor
Replacing shaft seal Assembly
Annual Inspection and replacement of 'O' rings
Overhauling of compressor - replacement of journal and thrust bering, renewal of all lock washers and 'o' rings
Checking compressor loading unloading machanism and resetting the limit switches
Calibration of liner position indicator
Compressor motor - 160KW
Replacement of terminal box OR cooling fan
Checking and aligning compressor - motor assembly
Condensor
Chemical clening of condensor and pressure testing OR prrssure testing of condensor for identifying refrigent leak detection and identification of defective tubes
Replacement of defective condesor tube (per tube)
Renewal of cover flange bolt (per bolt)
Evaporator
Chemical clening of condensor and pressure testing OR prrssure testing of condensor for identifying refrigent leak detection and identification of defective tubes
Replacement of defective condesor tube (per tube)
Renewal of cover flange bolt (per bolt)
Instruments and Controls
Calibration of the pressure switch, checking for proper working, resetting the switches and testing (per instrument)
Refurbishment of control wiring for each pressure switch/ solenoid valve
Checking of solenoid valve for proper working, replacement of solenoid coil and testing
calibration of the presure gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)
Calibaration of the temprature gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)
Calibration of FKD 40/41
starter panel and LCP
Checking the power and control connections, claening of control card, snubber card and minor parametrization chenges if required
Repalcement of MCCB OR replacemnt of soft starter
Repair of soft starter (only services)
Replacemnt of control transformer OR current transformar
Termination of power cable at motor side
Refrigeration system
Replacement of Ref line valves or vibration Eliminator or rectification of refrigerant leak by hot work or refrigerant charging or refrigerantretrival from the system (ICE and empty refrigerant bottle to be provided by the ship)
Vacuuming and pressure testing and setting to work of AC plant
Replacement of shock mounts (per mount) OR six mounth health audit of plant
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .