Works of (1) Turnkey Mining Contract for Removal of Overburden, Raising, Crushing & Transportation of -250mm size lignite from Valia Mine to Power Plant, (2) Re-handling of Overburden dump at Valia Mine and (3) Re-handling of lignite at SLPP Power Plant
293324
GIPCL/MINING/VALIA/ 2026-27
Open
Mining
Service
Surat
10 documents required · 10 mandatory
₹20,000
Gujarat Industries Power Co. Ltd.
₹6.6 Cr
2 Apr 2026
2 Apr 2026
2 Apr 2026
1 May 2026
2 Apr 2026
Brief Description of Work: 1. The Contractor shall be awarded an item-wise
turnkey mining contract for a period of fifteen (15)
years. The scope shall, inter alia, include removal
of overburden and interburden, raising, crushing,
and transportation of lignite of size –250 mm from
the Valia Lignite Mine to the SLPP power plant, re-
handling of overburden dumps within the Valia
Mine, and re-handling of lignite at the SLPP power
2. The Contractor shall provide necessary assistance
to GIPCL in the process of land acquisition and
R&R for the area admeasuring 491.90.34 hectares
situated in the villages of Amandera, Mangrol,
Harsani, and Nani Pardi, comprising private land,
Government land, and Government Gaucher land,
in accordance with the provisions set out in the
Contract and as may be required from time to time.
3. The Contractor shall undertake confirmatory
exploration activities in the areas within the
aforesaid extent of 491.90.34 hectares.
4. The Contractor shall further be responsible, at its
own cost and risk, for the diversion and/or shifting
of surface features, including but not limited to
power lines, utilities, roads, and other infrastructure
falling within the mining area, in accordance with
the approved plans and applicable statutory
requirements, and subject to obtaining all requisite
approvals, permissions, and clearances from the
Competent Authorities.
Period of Contract: Fifteen Years (15) from the effective date of
Quantity of Lignite to be raised and 1. Raising of Lignite on turnkey basis and
transported: Transportation of sized Lignite (-250 mm size)
from Valia Lignite Mine to SLPP Power Plant as
Gujarat Industries Power Company Limited
shown in Surface Plan (Annexure No. 2, 2/A) and
Lignite Transport Plan (Annexure No. 3): -
Approximately 42.00 MTe.
2. Re-handling of the external dump as shown in the
Surface Plan (Annexure No. 2/B): -
Approximately 20.50 MCuM.
3. Stacking, Compacting, Blending and Re-Handling
of Lignite/ Coal/ Blended Fuel from Stockyards at
various locations throughout the year (including
monsoon period) by using Heavy Earth Moving
Equipments as shown in the Lignite Re-handling
Plan of about 509.48 Lakh tonne as shown in
Lignite Re-Handling Plan (Annexure No. 4).
EMD: Rs. 6.60 Crore (Rupees Six Crore and Sixty Lakh
Only), in the form of Demand Draft drawn in favor of
Gujarat Industries Power Co. Ltd., payable at Baroda
or Bank guarantee from any Nationalized Banks, Axis
Bank, ICICI Bank, HDFC Bank, Kotak Mahindra
Bank, IndusInd Bank, Federal Bank, Bandhan Bank,
IDBI Bank and Karur Vysya Bank in the specified
Performa of the bid document.
The Bank Guarantee (BG) shall be kept valid for a
minimum period of six (6) months from the date of
submission of the Bid Document.
Solvency Certificate: Solvency Certificate of Rupees 73.00 Crore (Rupees
Seventy-Three Crore Only) from any Nationalized
Banks, Axis Bank, ICICI Bank, HDFC Bank, Kotak
Mahindra Bank, IndusInd Bank, Federal Bank,
Bandhan Bank, IDBI Bank and Karur Vysya Bank.
Cost of Bid Document / Tender Fee: Rs. 20,000/- (Rupees Twenty Thousand Only) (non-
refundable, inclusive of 18% GST) through online
payment gateway of company’s website:
www.gipcl.com (online Payment form) as per details
mentioned @ Annexure-7 or by RTGS/NEFT/IFT
only in favor of GIPCL as per details below: -
1. Name of Account Holder: Gujarat Industries
3. Name of Bank: State Bank of India
4. Address of Bank: Utility Building, Nani Naroli,
Taluka Mangrol, Dist. Surat. Pin 394
5. IFSC code: SBIN0013423
Availability of Bid document: On web site https://tender.nprocure.com
or http://www.gipcl.com
Gujarat Industries Power Company Limited
Downloading of tender document 02/04/2026 to 01/05/2026
Last date of submission of written 10/04/2026 upto12.00 hrs.
request for clarification. If any, on
Pre-Bid Meeting: 13/04/2026 at 11.00 hrs.
All the prospective and eligible Bidders are requested
to attend the Pre-Bid meeting on 13/04/2026 at
Hrs at GIPCL Office, Petrochemicals, Vadodara
Maximum two members per Bidder may be allowed
for the Pre-bid conference.
Issue of Corrigendum to document, As and when required till last date of submission.
Last date of online submission of 01/05/2026 upto17.00 hrs.
entire offer / complete Bid in all two at https://tender.nprocure.com
parts on https://tender.nprocure.com
Submission of Techno-Commercial 02/05/2026 upto17.00 hrs.
(Part-I) Bid in Physical form along
with supporting documents at below
mentioned address:
Date and time for online opening of 04/05/2026, 09.00 hrs.
Techno-Commercial Bid (Part-I):
Date and time for opening of Price The date and time of opening of price bids will be
Bid (Part-II): intimated to the technically eligible Bidder’s at least
one day in advance by phone / fax / courier / email.
E-Reverse Auction will be conducted and informed
E-Reverse Auction:
by GIPCL to all qualified Bidders.
The above details are for information purposes only and the details are provided in the document.
Bidders are advised to read the bid document before submitting the bid.
1. Amendment / corrigendum of the bid document, the forms, schedules etc. may be done any
time by GIPCL during the period between publication of notice and submission of bid in the
web site. The Bidders are required to visit the web site regularly till the last date of online
bid submission (i.e. 01/05/2026 up to17.00 hrs).
2. GIPCL reserves the right to reject any or all the offers / bids received without assigning any
reason thereof.
3. The Bidders are required to quote the rate strictly as per the terms and conditions mentioned
in the bid document. Conditional bid will not be entertained and shall be liable for outright
4. The Bidders are required to submit their bids on-line in the web site
https://tender.nprocure.com
Gujarat Industries Power Company Limited
5. The Bidders are required to submit their bids (Techno-Commercial and Price Bid) in physical
form as mentioned in Clause No. 3.4.1 shall be submitted by the Bidders at the following
Executive Director (Mines)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
At & P.O. Nani Naroli, Taluka Mangrol,
Dist. Surat-394 110, Gujarat
Gujarat Industries Power Company Limited
1.1 This Bid Document is not an agreement or an offer by GIPCL to Bidders or any third
1.2 This Bid Document does not purport to contain all the information each Bidder may
require. Some Bidders may have better knowledge of the Project than the others. It is
expected and recommended that each Bidder conducts its own due-diligence,
investigations and analysis and verifies and satisfies itself of the accuracy and
completeness of the information in this Bid Document and obtain independent advice/
information from appropriate sources.
1.3 Neither GIPCL nor its employees or its consultants/advisors shall have any liability to any
Bidder or any other person under the law of contract, tort, the principles of restitution or
unjust enrichment or otherwise for any loss, expense or damage which may arise from or
be incurred or suffered in connection with this Bid Document, or any matter deemed to
form part of this Bid Document, the award of the Project, or any other information
supplied by or on behalf of GIPCL or its employees, any consultants/advisors or otherwise
arising in any way from the selection process for the award of the Project.
1.4 Information provided in this Bid Document to the Bidder(s) is on a wide range of matters,
some of which depends upon interpretation of law. The information given is not an
exhaustive account of statutory requirements and should not be regarded as a complete or
authoritative statement of law. GIPCL accepts no responsibility for the accuracy or
otherwise for any interpretation or opinion on law expressed herein.
1.5 GIPCL accepts no liability of any nature whether resulting from negligence or otherwise
howsoever caused arising from reliance of any Bidder upon the statements contained in
this Bid Document.
1.6 The Bidder shall bear all its costs associated with or relating to the preparation and
submission of its Bid Document including but not limited to preparation, copying,
postage, delivery fees, expenses associated with any demonstrations or presentations
which may be required by GIPCL or any other costs incurred in connection with or
relating to its Bid. All such costs and expenses will remain with the Bidder and the GIPCL
shall not be liable in any manner whatsoever for the same or for any other costs or other
expenses incurred by a Bidder in preparation or submission of the Bid, regardless of the
conduct or outcome of the bidding process.
This Bid Document and the information contained herein are strictly confidential and
privileged and are for the exclusive use of the Bidder to whom these are issued or it’s
concerned Promoter(s) / wholly owned Subsidiary (ies) on whose strength / experience the
Bidder is seeking qualification. This Bid Document must not be copied or distributed by
the recipient to third parties (other than, to the extent required by applicable law or in
confidence to the recipient’s professional advisors, provided that such advisors are bound
by confidentiality restrictions at least as strict as those contained in this Bid Document). In
Gujarat Industries Power Company Limited
the event that after the issue of the Bid Document the recipient does not continue with its
involvement in the bidding process for any reason whatsoever, this Bid Document and the
information contained herein must be kept confidential by such Bidder and its concerned
Promoter(s) / wholly owned Subsidiary (ies) and professional advisors, if any at all times.
1.7 Information relating to the examination, clarification, evaluation and recommendation for
the Bidders shall not be disclosed to any person who is not officially concerned with the
process or is not a retained professional advisor advising GIPCL in relation to, or matters
arising out of, or concerning the bidding process. GIPCL will treat all information,
submitted as part of the Bid, in confidence and will require all those who have access to
such material to treat the same in confidence. GIPCL may not divulge any such
information unless it is directed to do so by any statutory entity that has the power under
law to require its disclosure or is to enforce or assert any right or privilege of the statutory
entity and/ or GIPCL.
1.8 The Bidders or their Promoter(s) / wholly owned Subsidiary (ies) shall not make any
public announcements with respect to this bidding process or this Bid Document. Any
public announcements in this regard shall be made exclusively by GIPCL. Any breach by
the Bidder shall be deemed to be non-compliance with the terms and conditions of the Bid
Document and shall render its Bid liable for rejection. GIPCL’s decision in this regard
shall be final and binding on the Bidder.
1.9 GIPCL reserves the right in its sole discretion, without any obligation or liability
whatsoever, to accept or reject any or all of the bids at any stage of the bidding process
without assigning any reasons. Further GIPCL reserves the right to annul the bidding
process and / or to reject any or all bids at any stage prior to the signing of the Mining
Contract without thereby incurring any liability to the affected Bidders or any obligation
to inform the affected Bidders of the grounds for GIPCL’s action. Decision of GIPCL
shall be final and binding in this regard.
1.10 GIPCL reserves the right, at its sole and absolute discretion, to change, modify, amend,
clarify, or supplement this Bid Document at any time during the bidding process. All
modifications, amendments, clarifications, or supplements, which shall form an integral
part of this Bid Document. The Bidders shall not raise any objection to such changes or
modifications. Any objection raised by a Bidder in this regard shall render its Bid liable
for rejection by GIPCL. Any objection, interference, or representation made by any party
shall be deemed to constitute an infringement of the confidentiality and privileged rights
of GIPCL in respect of this Bid Document.
1.11 The Bidder should confirm that the Bid Document is complete in all respects. In the event
that the Document or any part thereof is mutilated or missing, the Bidder must notify
GIPCL immediately at the following address:
Executive Director (Mines)
M/s. Gujarat Industries Power Company Ltd
Surat Lignite Power Plant
Gujarat Industries Power Company Limited
At & Po. Nani Naroli,
Taluka Mangrol,
Dist. Surat- 394 110, Gujarat.
Email: [email protected]
If no intimation is received by GIPCL at the above-mentioned address within 5 Business
Days from the date of issue / download of the Bid Document, it shall be considered that
the Bid Document received by the Bidder is complete in all respects and that the Bidder is
fully satisfied with the Bid Document. No extension of time may be granted to any Bidder
for submission of its Bid on the ground that the Bidder did not obtain a complete set of the
1.12 It shall be deemed that by submitting the Bid, the Bidder agrees and releases GIPCL, its
employees, agents and advisers, irrevocably, unconditionally, fully and finally from any
and all liability for claims, losses, damages, costs, expenses or liabilities in any way
related to or arising from the exercise of any rights and/ or performance of any obligations
hereunder, pursuant hereto and/ or in connection herewith and waives any and all rights
and/ or claims it may have in this respect, whether actual or contingent, whether present or
1.13 By receiving this Bid Document, it shall be deemed that the persons so receiving the Bid
Document have reviewed, understood and accepted the disclaimers contained in this.
Gujarat Industries Power Company Limited
LIST OF ABBREVIATIONS
ADB Air Dried Basis
ARB As Received Basis
CuM Cubic Meter
EIA Environment Impact Assessment
EMP Environment Management Plan
FY Financial Year
GCV Gross Calorific Value
GIPCL Gujarat Industries Power Company Limited
GUVNL Gujarat Urja Vikas Nigam Limited
HEMM Heavy Earth Moving Machinery
IB Inter Burden
LoI Letter of Intent
MCuM Million Cubic Meter
MoU Memorandum of Understanding
MTPA Million tonnes per annum
MTe Million Tonne
OGL Original Ground Level
RBI Reserve Bank of India
ROM Run of Mine
TPH Tonnes per hour
LHS Lignite Handling System
Gujarat Industries Power Company Limited
Definitions, Interpretations and Agreement Documents etc.
1. Authorized Representative(s) and Signatories: Each Bidder shall designate maximum
two persons (“Authorized Representatives and Signatories”) authorized to represent the
Bidder in all matters pertaining to its bid. These designated persons should hold the
power of attorney duly authorizing them to perform all tasks including but not limited to
sign and submit the bid; to participate in all stages of the Bidding process; to conduct
correspondence for and on behalf of the Bidder, and to execute the Bid Agreement and
any other documents required to give effect to the outcome of the Bidding process. The
original power of attorney, duly notarized, in favor of the Authorized Representatives and
Signatories shall be enclosed by the Bidder along with the covering letter.
2. Bidder: Bidder means the person or persons, firm or company that has submitted a Bid in
response to this document.
3. Partnership Firm: In case of a partnership firm, each of the partners shall be jointly and
severally liable for all liabilities, actions/duties and claims including financial, legal,
environmental and technical liabilities on behalf of Bidding Partnership Firm.
4. Proprietorship entity: In case of a proprietorship entity, the proprietor shall be
responsible all interactions with GIPCL.
5. Performance Bank Guarantee/ Security Deposit: Performance Bank Guarantee shall
mean the guarantee to be furnished by the Contractor who is selected based on the
Bidding process.
6. Financial Year: Financial Year shall mean the 12-month period corresponding to the
audited financial statements.
7. Quarter: A period of 3 months ending on 31st March, 30th June, 30th September and 31st
8. Sampling/ Analysis: Sample / Analysis to be carried out as per BIS standard.
9. Net Worth: Net worth is the sum total of paid up capital and free reserves. Free reserves
mean all reserves credited out of the profits and share premium account but do not
include reserves credited out of revaluation of assets, write back of depreciation
provisions and amalgamation. Further, any debit balance of profit and loss account and
miscellaneous expenses to the extent not adjusted or written off, if any, shall be reduced
from Reserves and Surplus.
10. Operating Year: Operating Year shall mean a period of 12 months starting from date of
the contract agreement as certified by GIPCL Management.
11. Turnover: Turnover is Gross Sales or Gross Revenues, as defined by the Indian
Accounting Standards published by the Institute of Chartered Accountants of India.
12. Qualifying Proposal Requirements: Qualifying requirements shall mean the
requirements set forth in this document for the purpose of evaluation.
13. Stripping Ratio: The ratio of Bank Overburden (measured in-situ in cubic meters) to
Lignite (measured in Tonnes) that shall be excavated from the Site by the Contractor in
accordance with the terms of this Contract Agreement.
Gujarat Industries Power Company Limited
14. Bank Cubic Meter/s (BCM): “BCM” shall mean the volume of rock insitu (in-situ)
without being disturbed.
15. Sized Lignite: Lignite of size -250 mm after subjected to crushing/ breaking or any other
suitable mechanical means.
16. Unscheduled Outage: means an outage which is not a Scheduled Outage.
17. “Company” or “GIPCL” or “Management” shall mean Gujarat Industries Power
Company Limited including its successors in office and as signees or its representatives
authorized to act on its behalf for the purposes of contract.
18. “Clause” or “provision” shall mean the clause and sub clauses of this bid document
and/or agreement etc.
19. “Contractor” shall mean the person or persons, firm or company, whose bid has been
accepted by the GIPCL and shall include his/its/their legal representatives,
administrators, successors and assigns.
20. “Contract Document” shall mean collectively bid documents, designs, drawings, plans,
specifications, agreed variations, if any and other documents constituting the bid and
acceptance thereof.
21. “Contract”, “Contract Agreement "/ "Agreement ' shall mean the agreement between
GIPCL and the Contractor for execution of work/s. The agreement document shall mean
collectively Notice Inviting Tender, tender document, corrigenda if any, plans and agreed
variations (if any). Detailed Letter of Intent and other documents constituting the bid and
acceptance thereof.
22. “Completion Certificate/ Final Certificate” shall mean the certificate to be issued by
the GIPCL when the work/s has been completed to his satisfaction as per terms of the
23. “Commencement of work” shall mean start of work of OB/ IB/ Lignite handling by the
Contractor as per contract terms to the satisfaction of the GIPCL.
24. “Drawings” shall mean all map/s, plan/s section/s, sketch/s, layout/s, and tracing/s, or
print/s, thereof with additions, alterations, corrections and modifications, if any as may be
approved in writing by the GIPCL from time to time broadly defining the scope of
specifications for the execution of the contract.
25. “Mobilization Period” shall mean the time allowed to Contractor to mobilize required
manpower and recourses for the development phase for commencement of the work.
26. “Letter of Intent” or “Detailed letter of Acceptance” or “Work order” shall mean
intimation by a letter/ fax/E-mail to Bidder that his / their bid has been accepted, in
accordance with the provision contained in the letter/fax/E-mail.
27. “Mines Manager” shall mean the person appointed under Coal Mines Regulation,
and so designated for Valia Mine of Gujarat Industries Power Company Limited.
28. “Power Plant” shall mean the Power plant of M/s Gujarat Industries Power Company
Limited located at Nani Naroli in Tal Mangrol, Distt. Surat.
29. “Rate for Turnkey Work for Overburden/Interburden Removal, Raising,
Producing and Transportation of Sized Lignite (–250 mm) to SLPP Power Plant”
shall mean the rate quoted, in figures as well as in words, by the Contractor and accepted
by GIPCL, payable to the Contractor towards full and complete execution and
performance of all obligations under the Contract. The said rate shall be deemed to
include, without limitation, the cost of confirmatory exploratory drilling in the area
admeasuring 491.90.34 hectares, assistance in diversion and/or shifting of surface
Gujarat Industries Power Company Limited
features, assistance in acquisition of the balance land and R&R, and all other activities
required under the Scope of Work or incidental thereto for completion of the respective
works. No additional payment shall be admissible unless expressly provided in the
30. “Rate for Re-handling of the External Dump” means, rate quoted in figures and
words by the Contractor and accepted and awarded by the GIPCL as payable to the
Contractor for execution/ performance of all the contractual obligations as mentioned in
the scope of work or otherwise for the respective works.
31. “Rate for Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/
Blended Fuel from Stockyards” means, rate quoted in figures and words by the
Contractor and accepted and awarded by the GIPCL as payable to the Contractor for
execution/ performance of all the contractual obligations as mentioned in the scope of
work or otherwise for the respective works.
32. “Lignite Landing Cost” means, lignite rate fixed as determined by GIPCL.
33. “Lignite” means lignite / carbonaceous material which have calorific value in general in
the range of 2500-2837.86 KCal/Kg and more on daily weighted average basis and in-
34. “Schedule of quantities” shall mean the quantities of OB/IB and Lignite to be handled
and as provided in the contract, for execution of the contract.
35. “Bid” shall mean the bid submitted by the Bidder against this bid enquiry document for
acceptance by the GIPCL.
36. “Tonne” shall mean metric tonne (1000 kilograms.)
37. “Waste” shall mean overburden, inter-burden and inferior carbonaceous material/clay as
required to be excavated at Valia Lignite Mine.
Interpretations:
1. Wherever it is mentioned that the contractor shall do or perform or cause to be done
certain work/s or provide certain facilities or discharge certain obligation/s or make
certain provision/s etc., it is expressly agreed and understood that each and every such
work/s, facility, obligation/ s or provisions etc. shall be made and/ or provided by the
contractor to the satisfaction of the GIPCL at the cost and consequences of the contractor
as the work is on turnkey basis.
2. Several clauses and documents forming the contract are to be taken in harmony. Should
there be any discrepancy, inconsistency, error or omission in the contract or for any of the
matter/s, the same shall be referred to in writing by the contractor to the GIPCL, whose
interpretation/s, decision in writing shall be conclusive, final and binding on the
3. The works shown upon the drawing but not mentioned in the specifications or described
in the scope of work without being shown on the drawings shall nevertheless be held to
be included in the same manner as if they had been specifically shown upon the drawings
and described in the scope of work.
4. All headings and marginal notes to the various clauses of the contract are solely for the
purpose of giving a concise indication and not a summary of the contents thereof and
they shall never be deemed to be part thereof or be used in the interpretation or
construction thereof, or the provisions of the contract .
Gujarat Industries Power Company Limited
5. In the contract, unless otherwise stated specifically, the singular shall include the plural
and vice versa, wherever the context so requires , the words interpreting person/s shall
include incorporated companies, registered association, body of individuals or
partnership firm.
6. Where any portion of the General Conditions of the contract is repugnant to or at
variance with any provisions of the Special Conditions of the Contract, then, unless a
different intention appears, the provisions of Special Conditions of the contract shall be
deemed to override the provision of the General Conditions of the Contract and shall to
the extent of such repugnancy or variations, prevail.
7. Notwithstanding the sub-divisions/s of the various clauses of the contract into the
separate parts/ sections, every part of such shall be deemed to be supplementary to and
complementary of each and every other part and shall be read with and into the contract
so far as it may be practicable to do so.
8. General conditions of the contract shall be read in conjunction with the special conditions
of contract, specification of work, drawings and any other documents forming part of this
contract wherever the context so requires.
9. The materials, designs and workmanship etc. shall mean the same as specified in the
relevant Indian Standards and the job specifications contained herein and codes, referred
to in the contract and the additional requirements, if any, shall also be satisfied by the
10. No Director or official or employee of the company shall in any way be personally bound
or liable for the acts or obligations of the company under the contract or answerable for
any default or omissions in the observance or performance of any of the acts, matters or
things which are herein contained.
11. No amendments to the contract shall be valid unless specifically made as an amendment
in writing to the contractor and signed by the authorized representative of the parties, to
12. Any reference to “person” shall include individuals, companies, firms, corporations and
associations or bodies of individuals, whether incorporated or not and shall include their
respective successors in business and permitted assigns.
13. A reference to any gender includes the other gender.
14. Unless otherwise specified, a reference to a Section, Clause, Annexures, Schedule,
Attachment or paragraph is a reference to a Section, Clause, Annexure, and Schedule,
Attachment or paragraph of this Document.
15. The terms “include” and “including” shall be deemed to be suffixed with the words
“without limitations”, whether or not so followed.
16. Words imparting singular shall also include plural and vice-versa and any word defined
in the singular shall have the corresponding meaning when used in the plural and vice
Declaration by the Bidder:
The Bidders have to declare the following on its letter head, under his signatures and seal:-
1. We do hereby confirm and declare that we have independently inspected Valia lignite
mine area including dump areas as described in the document, ascertained and obtained
Gujarat Industries Power Company Limited
all relevant and necessary information, data, particulars, conditions of services of
workmen and working conditions, facilities, availability of surface & subsurface water &
its pumping requirements, existing industrial environment etc. which are directly or
indirectly related to scope of work.
2. We have ascertained the location and situation of Valia Lignite Mine area, the specified
areas where the contractor would be required to undertake the excavation work, create
top soil dumps, the location of dumping Site earmarked for waste disposal for the
specified areas, location of weighbridge, lignite stock yard, road network and location of
power plant upto where the contractor will be required to create and maintain haul roads
for trucks/dumper movement, handling of lignite upto power plant.
3. We hereby confirm that we have assessed and ascertained the area proposed for land
acquisition and R&R, including the associated challenges, and have duly considered the
requirements for shifting and/or relocation of certain infrastructure, including but not
limited to roads, transmission lines, nallahs, utilities, and other facilities falling within the
4. We have assessed and satisfied our self as to the nature, condition, quantum, extent,
scope and magnitude of the work, involved in the contract, type and conditions of the
strata, rock, soil, sub-soil, ground, working conditions of the area/s, availability of power
supply, water supply, men and machinery requirement, availability of land, availability of
surface & sub-surface water and its pumping requirement etc. The Bidder do hereby
agrees and undertakes not to raise any dispute and/ or objection at any stage on any
ground whatsoever.
5. We have assessed the condition & facilities at Valia Lignite Mine & shall not hamper the
required supply of lignite to power plant.
6. We have assessed the quantity of daily lignite requirement & agree to transport it
regularly to keep running of Power Plants.
1. The Document shall be governed by and interpreted in accordance with laws in force in
India and the Courts of Vadodara shall have exclusive jurisdiction over matters relating
Contract Documents:
The following documents shall constitute the Agreement between the GIPCL and the Bidder, and
each shall be read and construed as an integral part of the Agreement:
1. Notice Inviting Tender.
2. Any Corrigendum/ Clarification(s) issued by the GIPCL to Tender Documents.
3. Borehole Litho logs.
4. Surface Plan of the Valia Lignite Mine
5. Lignite Transport Plan.
6. Lignite Re-Handling Plan of Lignite stockyards of Power Plant.
Gujarat Industries Power Company Limited
Brief Introduction
2.1 Gujarat Industries Power Company Ltd.:
Gujarat Industries Power Company Limited (GIPCL) was incorporated in the year
1985 as a Public Limited Company. The Company is registered with the Registrar
of Companies, Gujarat under the Companies Act, 1956, registered and corporate
Office is located at P.O. Ranoli, Vadodara- 391 350, Gujarat, India. GIPCL has
been promoted by Gujarat Fertilizers and Chemicals Ltd. (GSFC), Gujarat Alkalies
and Chemicals Ltd. (GACL) and Gujarat Urja Vikas Nigam Ltd.(GUVNL,
erstwhile Gujarat Electricity Board). GIPCL functions under the umbrella of
Energy and Petrochemicals Department, Govt. of Gujarat. GIPCL’s equity shares
are listed on the Bombay Stock Exchange (BSE) and National Stock Exchange
GIPCL is in the business of Electrical Power Generation, the current installed
capacity is 1859.40 MW. The Company has a diversified power generation
portfolio comprising Thermal (Lignite and Gas) and Renewable (Wind and Solar)
Power Plants. GIPCL also operates captive Lignite and Limestone Mines to meet
the fuel requirement of the 500 MW Surat Lignite Power Plant. Over the years,
GIPCL has established itself as a formidable player in the power generation
1. 500 MW (2 x 250 MW) Surat Lignite Power Plant at Village Mangrol, Surat,
2. 310 MW (145 MW +165 MW) Gas Based Combined Cycle Power Plants at
Vadodara, Gujarat
3. 112.4 MW Wind Generating Capacity in the Saurashtra and Kutch region of
4. 937 MW Solar Generating Capacity spread across various locations in Gujarat.
5. Mangrol-Valia Lignite Mine with a capacity of 4.20 Million Tonnes Per Annum
GIPCL has acquired mining lease and clearances for Open Cast Lignite and
Limestone mining in Vastan and Mangrol -Valia region which ensures
uninterrupted fuel supply to the Surat Lignite Power Plant.
The proposed Mangrol-Valia Lignite Mining Block which is an extension of
Vastan Lignite field is situated near Mangrol Town. This mining block spreads
across Mangrol Taluka of Surat District and Valia Taluka of Bharuch District. The
block is a part of Survey of India Topo sheet No 46 G /3 lying between Latitudes
210 25’ to 210 31’ North and Longitudes 730 06’ to 730 09’ East. This block is about
65 kms from the Surat District Head Quarter.
Bhuki River a tributary of Kim River runs in the middle of the lease area. The
block is about 48 Kms South of Rajpardi. The Site can be approached from
National Highway ( NH-8) connecting Kim Four Road Junction ( Kim Char-
Gujarat Industries Power Company Limited
Rasta), which lies in between Surat and Bharuch. The major road connecting
Mangrol and Kim via Tadkeshwar passes through the property.
Climate of the area is subtropical. The annual rainfall recorded during past 15 years
ranges between 538.70 mm to 2310.00 mm. The highest precipitation occurs
normally from last week of June to last week of September. The area in general is
more or less flat with some minor undulations.
The general slope of the area is towards Kim river flowing from the north eastern
part. Kim river is a seasonal river which flows in the northwest direction. Normally
245 to 260 days are available for actual working in the proposed mining area.
2.4 Exploration and Interpretation:
The exploration in the GIPCL’s acquired land was carried out earlier by the
Commissioner of Geology and Mining, Govt. of Gujarat and MECL. Further,
GIPCL also carried out fresh exploration work in the area. GIPCL’s BH is
denominated as ‘VLR’ Series.
2.5 Current Status of the Existing Valia lignite Mine:
1) Currently, Valia Lignite Mine is in operation with approved mine capacity of
4.2 MTPA. Project has already established infrastructures facilities. Mining and
lignite production activities are going on by existing turnkey mining contractor
as shown in Annexure No. 2, 2/A and 2B. The existing turnkey mining contract
is likely to continue upto about October,
2) The quantity of Overburden/Interburden (OB/IB) lying at the external dump
yard over the mineralized zone is approximately 20.50 million cubic meters
(MCuM), which is required to be re-handled under the existing contract.
2.6 The Contract:
2.6.1 GIPCL has been granted Mining Lease C and D Block (extending to 849.00 Ha
areas of villages Rajgarh, Kosmadi, Dansoli & Luna etc in Valia Taluka of Bharuch
district and Harsani, Timberva and Bhilwada villages of Mangrol Taluka in Surat
district respectively. GIPCL proposes to mine the lignite reserves by opencast
mining with annual lignite production capacity of approximately 3.25 MTe to feed
existing 4x125 MW Power Plants.
2.6.2 The Valia lignite mine is near the Rajgarh Village of Valia Taluka with a new
contracted pit area is about 212.00 Hectares, where almost complete land is in the
possession of GIPCL. The area is almost flat and free from any major surface
2.6.3 The proposed extension of the Valia Lignite Mine pertains to a part of B-Block,
admeasuring 491.90.34 hectares, and encompasses land parcels situated in the
villages of Amandera, Mangrol, Harsani, and Nani Pardi. The area comprises a mix
of private land, Government land, and Government Gaucher land.
2.6.4 GIPCL intends to appoint a Contractor for undertaking further development of the
Valia Lignite Mine, assisting in acquisition of the balance land and R&R, carrying
out confirmatory exploration in the area admeasuring 491.90.34 hectares, diversion
and/or shifting of surface features, power lines, and other infrastructure, and
extraction of lignite through opencast mining operations.
2.7 Method of Mining and Lignite Transportation:
Gujarat Industries Power Company Limited
2.7.1 It is proposed to work the mine by opencast mining methods, using HEMM like
hydraulic excavators and dumpers for OB removal and by hydraulic excavators and
dumpers for lignite mining and dozers, road grader etc. for ancillary operations,
crushing/ breaking and supplying of lignite of minus (-) 250 mm by lignite
feeder breaker/ any other mechanism of appropriate capacity and Transportation
of -250 mm lignite from Valia Lignite Mine to SLPP Power Plant as shown
in the Surface Plan (Annexure No. 2 and 2/A) and Lignite Transport Plan
(Annexure No. 3).
2.7.2 The entire topsoil excavated from the mining area shall be re-spread over the
stabilized reclaimed area, as defined in the scope of work. Top soil is to be spread
over the reclaimed area from the concurrent top soil excavation area.
2.7.3 Lignite Transportation:
The Contractor shall be solely responsible for transporting of sized Lignite (-
mm size) as specified in schedule target from Valia Lignite Mine to SLPP Power
Plant as shown in the Surface plan (Annexure No. 2 and 2/A) and Lignite Transport
Plan (Annexure No. 3).
2.8 Description of the Work as described in Scope of Work:
GIPCL proposes to award the work for,
1. Turnkey Mining Contract for Removal of Overburden/ Inter Burden, Raising,
Crushing & Transportation of -250mm size lignite from Valia Mine to Power
2. Re-handling of Overburden dump at Valia Mine and
3. Re-handling of lignite at SLPP Power Plant.
4. The Contractor shall provide necessary assistance to GIPCL in the process of
land acquisition and R&R for the area admeasuring 491.90.34 hectares situated
in the villages of Amandera, Mangrol, Harsani, and Nani Pardi, comprising
private land, Government land, and Government Gaucher land, in accordance
with the provisions set out in the Contract and as may be required from time to
5. The Contractor shall undertake confirmatory exploration activities in the areas
within the aforesaid extent of 491.90.34 hectares.
6. The Contractor shall further be responsible, at its own cost and risk, for the
diversion and/or shifting of surface features, including but not limited to power
lines, utilities, roads, and other infrastructure falling within the mining area, in
accordance with the approved plans and applicable statutory requirements, and
subject to obtaining all requisite approvals, permissions, and clearances from
the Competent Authorities.
For details, please refer to the Clause No. 5.2.2 on the Scope of Work under
Section V – Mining-Part II (Scope of Work & Special Conditions of the Contract)
Gujarat Industries Power Company Limited
2.9 Duration and Quantity of Work:
2.9.1 The period of contract will be 15 (Fifteen) years from the effective date of
Agreement. Initially upto October, 2026, New contractor will work parallel to the
existing contractor.
Total approximate estimated quantity of:
1. Turnkey Mining Contract for Removal of Overburden/ IB, Raising, Crushing &
Transportation of -250mm size lignite from Valia Mine to Power Plant as
shown in Surface Plan (Annexure No. 2 and 2/A) and Lignite Transport Plan
(Annexure No. 3): - Approximately 42.00 MTe.
2. Re-handling of the external dump as shown in the Surface Plan (Annexure No.
2/B): - Approximately 20.50 MCuM.
3. Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/ Blended
Fuel from Stockyards at various locations throughout the year (including
monsoon period) by using Heavy Earth Moving Equipments as shown in the
Lignite Re-handling Plan of about 509.48 Lakh tonne as shown in Lignite Re-
Handling Plan (Annexure No. 4).
2.9.2 GIPCL reserves the right, at its sole and absolute discretion, to increase or decrease
the annual quantities of lignite in any Operating Year at any time during such
Operating Year by giving not less than thirty (30) days’ prior written notice to the
Contractor. The quantities of lignite specified in this Bid Document are indicative
and estimated only and shall not be construed as firm or guaranteed quantities.
Being a captive lignite mine for the Surat Lignite Power Plant, the actual quantities
of lignite shall be governed solely by the requirement of the Power Plant, taking
into account lignite availability from Mangrol Mine, and any other relevant
sources, as determined by GIPCL from time to time. GIPCL shall have the sole and
exclusive discretion to determine the requirement of lignite for power generation.
The Contractor hereby acknowledges and agrees that the requirement of lignite
may vary from time to time and undertakes that no claim, compensation, escalation,
or objection shall be raised on account of any increase, decrease, or variation in
such quantities.
Gujarat Industries Power Company Limited
Instructions to the Bidders
3.1 Instruction to Bidders:
Bidders are advised to carefully read the instructions, evaluation norms and other
terms and conditions described in these documents under different Chapters before
making their offer. In case of any doubt they may seek clarification/further
information’s from the Executive Director (Mines) or the Deputy General Manager
(P&P) at the Administrative Office of GIPCL at SLPP at the following telephone
numbers during office hours from 08.30 a.m. to 5.30 p.m.
Executive Director (Mines) 02629-261087 [email protected]
Deputy General Manager (P&P) 9909925337 [email protected]
3.2 e-Tendering:
3.2.1 Bid documents are available only in electronic format which Bidder can
download free of cost from the websites https://tender.nprocure.com or
http://www.gipcl.com
3.2.2 All bids (Techno-Commercial and Price bid) should be submitted online through the
web site https://tender.nprocure.com only. No physical submission of rates will be
entertained as it should be furnished online only. Also, no fax, email and letter will
be entertained for the same.
3.2.3 Following should be submitted in physical form in sealed covers separately at
GIPCL’s office:
i. Document fee
iii. Supporting documents for Techno-Commercial Bid
Executive Director (Mines)
M/s. Gujarat Industries Power Company Limited
Village Nani Naroli, Taluka Mangrol,
Dist. Surat – 394110 (Gujarat)
3.2.4 Bidder who wish to participate in online bids will have to procure / should have
legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidder can procure the
same from any of the license certifying Authority of India or can contact M/s.
(n)code solutions- a division of GNFC Limited, w ho are licensed C ertifying
Authority by Government o f India.
3.2.5 All o n l i n e bids should be digitally signed. Kindly note that valid Digital
Signature Certificates is must for the entire interested Bidder. Online tendering
process is not possible without valid digital signature certificate.
3.2.6 Interested Bidder are also r equested to complete their procedure for taking digital
signature certificate at least 3 days before last date of submission of tender online.
3.2.7 Free Bidder training c amp will be organized every Saturday between 16.00 hrs. to
17.00 hrs. at M / s ( n) code solutions. Bidders are r e q uested to take benefit of the
same (Advance Confirmation to M/s (n) code is requested).
Gujarat Industries Power Company Limited
3.2.8 M/s (n)code solutions reserves the rights to issue digital signature certificate
after verification of application forms / supporting documents submitted by
An M/s (n) code solution is also fully authorized to issue digital signature certificate
The Bidders who have no facility to participate in on-line tenders are requested to
contact M/s (n) code solutions for the same.
3.2.9 All the correspondence in respect of training, support or digital signature
certificate should be addressed to M/s (n)code solutions directly on the above-
mentioned address
3.3 Site Visit:
The Bidders are advised to visit the proposed work Site after downloading the
tender copy from https://tender.nprocure.com or http://www.gipcl.com to study the
actual working and all other related conditions, before submitting their offer. The
Bidders may approach the office of the GIPCL for assistance to examine the
site of works and its surroundings and obtain for themselves, at their own
responsibility, all information that may be necessary for preparing the bid and
entering into a contract. All costs and liabilities arising out of the Site visit shall be
at Bidder’s account.
The Bidders shall be deemed to have visited the site and surroundings, to have
satisfied themselves to the existing and proposed working and all other related
conditions at Site and ascertain for themselves the scope of work and ground
situation including conditions of road over which lignite is proposed to be
transported from Valia Mine to the Power Plant and the assessment of risks
associated with the work whether apparent or inherent to the nature of the work
involved in the execution of the work enumerated in the scope of work nature and
conditions of rock and soil and it’s behavior, if any, availability of material, water,
labour, transportation facilities probable Sites for labour accommodation and store,
godown, etc. and the extent of lead and lift and other factors involved in the
execution of works.
Bidder shall confirm that we have assessed and ascertained the area proposed for
land acquisition and R&R, including the associated challenges, and have duly
considered the requirements for shifting and/or relocation of certain infrastructure,
including but not limited to roads, transmission lines, nallahs, utilities, and other
surface features falling within the project area.
The Bidder shall declare and confirm in Form-G about their Site visit.
3.4 Two Bid System:
The Bidder shall prepare the bid document in two parts:
3.4.1 Part – I: Techno-Commercial Bid: Consisting of information in the format i.e.
forms A, B, C, D, E, F, G, H, I and J along with the financial standing of the Bidder
for the past 3 years (2022-23, 2023-24 and 2024-25) are to be submitted on line for
eligibility and Qualification criteria as required under SECTION- IV & submission
Gujarat Industries Power Company Limited
of bid document fee & EMD. The following documents are also required along
with Part – I: Techno-Commercial Bid.
1. Power of authority of the signatory to the Bidder.
2. Latest solvency certificate from the nationalized bank.
3. In case of a Partnership Firm as a Bidder, a certified copy of the Partnership
Deed of the Firm.
4. Financial Standing of the Bidder such as for the past 3 years (2022-23, 2023-
a. Profit and Loss Statement,
b. Balance Sheet,
c. Auditor’s Report.
5. To participate in e-Reverse Auction, bidders have to create e-Auction
USER ID on https://e-auction.nprocure.com and it is mandatory to
submit the same along with physical Technical-Commercial Bid, so that
the bidder shall be allowed to participate the e-Reverse Auction.
The Techno-Commercial Bid (Part-I) is to be submitted on line on or before
01/05/2026 up to 17.00 hrs. in the format i.e. forms A, B, C, D, E, F, G, H, I and J
wherein details of document fee and EMD, experience, equipment owned, proof of
experience, machinery and equipment owned by the Bidders in the prescribed
A hard copy of the entire format i.e. forms A, B, C, D, E, F, G, H, I and J format,
duly filled in, along with document fee in form of DD and EMD in form of DD or
BG, Power of authority of the signatory to the Bidder, Latest solvency certificate
from the nationalized bank , In case of a Partnership Firm as a Bidder, a certified
copy of the Partnership Deed of the Firm and Financial Standing of the Bidder such
as for the past 3 years (2022-23, 2023-24 and 2024-25) will be submitted in a
separate sealed cover marked Techno-Commercial Bid, Part-I, Tender No.
GIPCL/MINING/VALIA/2026-27 at the office of the Executive Director
(Mines) at the address given below, on or before 02/05/2026 up to 17.00 hrs. On
receipt and verification of the same, the Bidder will be declared qualified for the
The Executive Director (Mines)
M/s. Gujarat Industries Power Company Limited
Village Nani Naroli,
Taluka Mangrol,
Dist. Surat – 394110 (Gujarat)
the website https://tender.nprocure.com only on or before dated 01/05/2026 upto
17.00 hrs in the prescribed forms FORM-AA, PRICE BID/SCHDULE (“PRICE
BID”) only, provided at the end of these bidding documents, without exception.
Rates quoted will be exclusive of GST.
The rates of remuneration quoted by the Bidder will be including all taxes, duties
Gujarat Industries Power Company Limited
and levies and shall be firm & fixed for entire contractual period except as provided
elsewhere in this bid document.
3.4.3 The price bid should be submitted online only through the website
https://tender.nprocure.com No physical submission of rates will be entertained.
Also, no fax, e-mail, letters will be entertained in this regard.
3.4.4 If the EMD, tender fee and solvency certificate are not found in the sealed Techno-
Commercial Bid cover or if the amount thereof is found short, the bid will not be
considered for scrutiny and be liable to be out rightly rejected.
3.4.5 GIPCL reserves the right to reject any or all the bids without assigning any reason
3.4.6 The Techno-Commercial Bid cover should contain an affidavit in original in the
prescribed Performa as given in the bid document, duly sworn before a
Magistrate/Notary to the effect that all the supporting documents submitted with the
bid is genuine and correct. If it is found at any point of time that the said documents
were not genuine then in that event the bid will be rejected or contract will be
terminated, EMD will be forfeited and the Bidder may be debarred from
participating in further/future bidding process.
3.4.7 The bid submitted by the Bidder shall be unconditional in all respect, other than as
may be specifically permitted under this document.
3.4.8 Generally, the Selected Bidder shall be the lowest Bidder. The remaining Bidders
shall be kept in reserve and may, if required, be invited to match the Bid submitted
by the lowest Bidder in case such lowest Bidder withdraws or is not selected for any
other reason. In the event that none of the other Bidders match the Bid of the lowest
Bidder, GIPCL may at its sole discretion, invite fresh Bids from all Bidders or annul
the Bidding Process, as the case may be.
3.4.9 Any bid submitted by a Bidder is not transferable.
3.5 Pre-Bid Meeting:
GIPCL proposes to hold a pre-bid meeting to clarify queries and furnish replies to
the questions/ observations, if any raised by the Bidders on the tender. The meeting
will be held at GIPCL Office, Petrochemicals, Vadodara (Gujarat) on the date and
time as per NIT. The queries, if any is to be sent in advance in the prescribed format
for submission of clarifications in the Bid document (Microsoft Word Format and
PDF Both) to Executive Director (Mines) so as to reach at least four days before
the scheduled date of pre-bid meeting. It is not mandatory to attend the meeting but
it would be in the interest of Bidders to do so. It is also advisable for Bidders to visit
the Site before the pre-bid meeting.
3.6 Opening of the Bid:
The envelope containing Part I- Techno-Commercial Bid aspects of the bid will be
opened on the scheduled date of opening of the bid, at the office of the GIPCL. The
date and time of opening of price bids will be intimated to the technically eligible
Bidder’s at least one day in advance by phone/ fax/ courier/ email.
3.7 All Pages to be Initialed:
3.7.1 All signatures in the bid documents shall be dated as well as the pages of all the
sections of bid documents shall be initialed at the lower right-hand corner and
signed wherever specified in the bid papers by the Bidder or by a person holding
power of attorney authorizing him/her to sign on behalf of Bidder before submission
Gujarat Industries Power Company Limited
of the bid. All papers should also bear the stamp of the Bidder.
3.7.2 The bid shall contain the registered name, and place of business of person or
persons, participating in the bid and shall be signed by the Bidder with usual
signature. Partnership Firms shall furnish the full particulars of all the partners and a
copy of registered Partnership Deed in the bid. The bid shall be signed either by all
the partners or by any one partner duly authorized by all other partners of the firm.
Bid by a Corporation/Company, shall furnish full particulars of all Directors and the
bid shall be signed by an authorized representative duly authorized as per the Board
Resolution or holder of Power of Attorney issued by the functional director in that
behalf, to be enclosed with the bid. The bid so signed shall be binding to the person
3.8 Earnest Money Deposit:
3.8.1 The Bidder shall furnish, as part of the bid, Earnest Money Deposit (EMD)/ Bid
Security for an amount of Rs. 6.60 Crore (Rupees Six Crore and Sixty Lakh
Only), in the form of Demand Draft drawn in favor of Gujarat Industries Power Co.
Ltd., payable at Baroda or Bank guarantee from a Nationalized Bank or IDBI Bank
or Axis Bank or HDFC Bank or ICICI Bank or Kalupur commercial Co-operative
Bank, in the specified Performa of the bid document.
The Bank Guarantee (BG) shall be kept valid for a minimum period of six (6)
months from the date of submission of the Bid Document.
3.8.2 The bid securities of unsuccessful bidder/ bidders will be returned without interest
as promptly as possible, but not later than 30 days after the expiry of the period of
bid validity or after receipt of Performance Security Deposit from the successful
bidder, whichever is earlier.
3.8.3 The bid security of Contractor will be returned only when they have signed the
agreement and furnished the required performance security.
3.8.4 The Bid security may be forfeited, if any Bidder withdraws his bid during the period
of bid validity or prior to award of contract whichever is earlier. The Bid security
may also be forfeited if the Bidder fails to furnish the required performance security
after award of the work or if the Contractor refuses to accept the contract for any
3.9.1 Bid submitted by Bidder shall remain valid for acceptance for a period of 180 days
from the date of submission of online bid. The Bidder shall not during the said
period of 180 days revoke, cancel and/or withdraw his bid nor shall he make any
variation therein. In case of Bidder revoking, cancelling and/or withdrawing his bid
or suo-motto varying any term in respect thereof, the earnest money deposited by
him along with bid shall stand forfeited.
3.9.2 In exceptional circumstances, prior to expiry of the original bid validity the GIPCL
may request the Bidder to extend period of validity for a specified additional period.
The request and the Bidder’s response shall be made in writing. The Bidder, if
agreeing to the request will not be required or permitted to modify his bid.
3.10 Late Bids:
Any bid received by GIPCL after the deadline for submission of bids, prescribed by
GIPCL, in accordance with Clause No. 3.4 will not be accepted and documents
Gujarat Industries Power Company Limited
submitted in physical forms will be returned to the Bidder unopened.
3.11 Withdrawal of Bids:
The Bidder cannot withdraw the Bid, once it has been submitted to GIPCL.
All bidders are requested to submit their GST number and date in the bid. Bid
received from unregistered bidder will not be considered and out rightly rejected.
Bidders are requested to quote their rates without GST.
GST will be paid to the contractors as per prevailing rates and rules to the extend
directly related to the services rendered by the contractor under the said contract.
The GST amount collected through invoices will be verified by GIPCL through
GSTN portal. A copy of GST return should be attached with invoices as a part of
supporting document. In case of default in the above process the payment of GST
amount may be withheld /deducted.
3.13 Addenda/ Corrigenda:
3.13.1 Addenda/corrigenda to the bid documents may be issued to clarify or to reflect
modifications in the design, drawing, specifications, scope of work, terms &
conditions, etc.
3.13.2 Addenda/corrigenda to these bid documents, if issued by the GIPCL, shall form an
integral part of this bid document and must be signed and submitted along with the
3.14 Rights of the GIPCL to Accept or Reject Bid:
3.14.1 Bid in which any of the particulars and prescribed information are missing or are
incomplete or found to false in any respect and/or prescribed conditions are not
fulfilled the same shall be liable to be rejected.
3.14.2 Any Canvassing in connection with bids is strictly prohibited and bids submitted by
the Bidders, who resort to canvassing, will be liable to rejection.
3.15 Security Deposit:
3.15.1 A Performance Security Deposit @ 10% of estimated value of (Weighted average
annual quantity of Lignite raising and transportation @ 3.25 MTe, Re-handling of
the External Dump @ 4.00 MCuM and Stacking, Compacting, Blending and Re-
Handling of Lignite/ Coal/ Blended Fuel from Stockyards @ 35.00 Lakh CuM) of
contract shall be applicable on the Contract Work.
Within 15 days of issue of LoI, the Contractor will make payment of Performance
Security Deposit in the form of Demand Draft drawn in favor of Gujarat Industries
Power Co. Ltd., payable at Baroda or Bank guarantee from a Nationalized Bank or
IDBI Bank or Axis Bank or HDFC Bank or ICICI Bank or Kalupur commercial Co-
operative Bank, in the specified Performa of the bid document, for an amount of five
percent (5%) of above mentioned estimated value of one year (Weighted average
annual quantity of Lignite raising and transportation @ 3.25 MTe, Re-handling of
the External Dump @ 4.00 MCuM and Stacking, Compacting, Blending and Re-
Handling of Lignite/ Coal/ Blended Fuel from Stockyards @ 35.00 Lakh CuM) of
The PBG shall be renewed after every 03 (Three years) years and the failure may
lead to termination of the Contract. The PBG shall also be maintained valid for at
Gujarat Industries Power Company Limited
least six (06) months after the completion of the contract period. However, the
Contractor shall top up the performance Security Deposit after every three-year
considering the escalated rate of average annual quantity of Lignite raising and
transportation @ 3.25 MTe, Re-handling of the External Dump @ 4.00 MCuM and
Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/ Blended Fuel
from Stockyards @ 35.00 Lakh at the end of every third year.
3.15.2 Balance 5% of PBG will be deducted @ 5% of the value of the monthly RA bill
starting from 1st RA Bill, till the total PBG deducted amounts to 5% of the estimated
value as per Clause No. 3.15.1 above. No further cash retention will be made toward
PBG after 5% of average annual value of one years of contract is deducted.
3.15.3 The entire Security Deposit shall be refunded after three months of the expiry/
successful completion of contract, subject to handing over of possession of work
Site, camp Site (if allowed on GIPCL acquired land / lease) provided always that the
Contractor has been first paid all the bills including his final bill subject to
deductions as are permissible under these terms and all other dues to the GIPCL
arising out of this contract, if any, have been fully met by the Contractor and the
Contractor has rendered "No claim and No Dues Certificate" to the GIPCL.
3.15.4 The Security Deposit shall be liable to be forfeited wholly or partly at the sole
discretion of the GIPCL, should the Contractor either fail to fulfill the contractual
obligations or fail to settle in full his dues to the GIPCL. In case of premature
termination of the contract, the Security Deposit may be forfeited and the GIPCL
will be at liberty to recover the loss suffered by it from the Contractor.
3.15.5 The GIPCL may deduct from the Security Deposit any sum due and any other sum
that may be fixed up by the GIPCL as being the amount of loss or losses or damages
suffered by it due to delay in performance and/or non-performance and/or partial
performance and /or poor performance of any of the terms of the contract.
3.15.6 All compensation or other sums of money payable by the Contractor to GIPCL or
recoveries to be made under the terms of this contract may be deducted from any
sums which may be due to the Contractor from GIPCL on any account and in the
event of the such amount being insufficient the Contractor shall within ten days of
such shortfall make good in cash, failing which the balance amount shall be
recovered by way of invoking the bank guarantee furnished as security.
3.15.7 In the event of performance bank guarantee (PBG) amount being insufficient, then
the balance recoverable amount shall be deducted from any sum, then due or which
at any time thereafter may become due to the Contractor. The Contractor shall pay
to GIPCL on demand any balance remaining due.
3.15.8 In case the performance bank guarantee (PBG) is invoked for any reason/s, the
Contractor shall furnish a fresh performance bank guarantee (PBG) in the same
format for the same amount and for the same period as the original performance
bank guarantee (PBG) within a period of 15 days from the date of invoking of
original performance bank guarantee (PBG).
3.15.9 In the event of performance bank guarantee (PBG) at any time during the currency
of the contract falling short of the specified amount, the Contractor shall forth with
make good the deficit on demand, so that the total amounts of performance bank
make good the deficit on demand, so that the total amounts of performance bank
guarantee (PBG) will not at any time be less than the amount so specified. GIPCL
may recover the same by way of additional deductions from bills.
Gujarat Industries Power Company Limited
3.15.10 No interest is payable on performance bank guarantee (PBG) amount.
3.15.11 In case of enhancement of quantum of work due to any reason, the Contractor shall
furnish additional performance bank guarantee (PBG). This security will be
progressively recovered from the payment due to the Contractor.
3.15.12 In case, the Contractor fails to mobilize required manpower, resources and
equipments within 30 (Thirty) days from the date of agreement, the amount of
performance bank guarantee (PBG) as mentioned under Clause No. 3.15 may be
forfeited at the sole discretion of the company.
3.16 Bidder to obtain information of his own:
3.16.1 The Bidder in quoting the bid shall for all purposes, whatsoever, be deemed to have
independently obtained all relevant and necessary information for the purpose of
preparing his bid. The Bidder is required to satisfy himself in all respect, before the
submission of bid. The information/details given in the bid document are only to
describe nature and magnitude of work and are for guidance to the Bidder. No
guarantee is extended to Bidder for completeness or accuracy to the details
mentioned in the bid document.
3.16.2 The Bidder shall be deemed to have fully examined and understood the contents of
this Bid Document and to have obtained, at its own cost and responsibility, all
information, data, and clarifications in all matters whatsoever that may affect the
execution of the Works at the quoted/scheduled rates. Any error, omission,
ambiguity, discrepancy, or inconsistency in the description of the Works,
specifications, or other particulars shall neither relieve the Contractor of its
obligations under the Contract during its tenure nor entitle the Contractor to any
claim for additional payment, revision of rates, compensation, or extension of time.
The Bidder shall be deemed to have visited and inspected the Site and its
surroundings and to have satisfied itself, prior to submission of the Bid, as to the
working conditions at the Site, including but not limited to the nature and condition
of topography, geology, rock and soil strata, availability of materials, water, power,
labour, transportation and logistics, statutory and local constraints, probable
locations for labour accommodation, storage facilities and allied infrastructure,
extent of lead and lift, and all other factors relevant to the execution and completion
of the Works. This shall include due familiarity with the Power Plant site, the area
proposed for land acquisition and R&R, and the socio-economic conditions
prevailing in the project area where land acquisition and R&R is to be undertaken.
The Bidder further acknowledges and agrees that the lignite to be raised under the
Contract shall be utilized primarily for power generation, and the execution of the
Works shall be aligned with the operational requirements of the Power Plant as
determined by GIPCL from time to time.
3.17 Clarifications of Contents of Bid Documents:
3.17.1 Any clarification / information provided during the pre-bid, if that necessitates, then
GIPCL will issue suitable addendum /corrigendum on website of
https://tender.nprocure.com, besides hosting them on the web site of GIPCL, should
an intending Bidder require any clarification in connection with, or any point
covered by the bid documents, or as to any matter or thing to be done or not to be
Gujarat Industries Power Company Limited
done by him/it in the event the contract for the work is awarded to him, he may seek
clarifications either during the pre-bid meeting or by submitting a request for such
clarification in writing so as to reach GIPCL at least four days in advance of the pre-
bid meeting. GIPCL in no way is responsible for any delay or loss in postal
transaction or not visiting the web site of GIPCL by any intending Bidder.
3.17.2 GIPCL will not be bound by any verbal clarification or interpretation of the bid
documents or of any matter or thing connected with the works to be executed in
accordance with the bid documents, which may be made in by any of its employee
or representative.
3.17.3 Any neglect or failure on the part of the Bidder in obtaining necessary and reliable
information or any other matters affecting the contract shall not relieve him from
any risks or liabilities or the entire responsibility of completion of the works at the
scheduled rates and time in strict accordance with the contract documents.
3.18 Evaluation of Bids:
3.18.1 Evaluation of Techno-Commercial Bid:
i. The Techno-Commercial Bid (Part I) of the Bidders will be evaluated on
the basis of Pre-qualification criteria and information available with GIPCL
on the performance of Bidder etc. Bidders should be careful in preparing
their bid papers for the sufficiency and clarity. Only the shortlisted Bidders
will be informed about the date & time of opening of the price bids (Part II).
ii. Any corrections and alterations, if unavoidable, in the entries of bid papers
will be signed in full by the Bidder with date. No erasures or over writings
are permissible. The requisite details shall be filled in by the Bidder in the
enclosed Performa for bid.
3.18.2 Evaluation of Price Bid: - Part-II of Bid i.e. Grand total amount of Work (1), (2)
3.18.2 Evaluation of Price Bid: - Part-II of Bid i.e. Grand total amount of Work (1), (2)
and (3) combined shall be considered for deciding the lowest five bidders
(minimum) or 50% out of total bidders (rounded to the next higher whole number),
whichever is higher for making them eligible for the e-reverse auction. The lowest
grand total amount of Work (1), (2) and (3) combined shall be considered as
grand total amount of Work (1), (2) and (3) combined shall be considered as
the base rate which will put up for starting e-Reverse Auction.
e-Reverse auction shall be for reducing the lowest grand total amount of Work.
e-Reverse auction shall be for reducing the lowest grand total amount of Work.
No. (1), (2) and (3) combined and the bidders have to reduce their grand total
No. (1), (2) and (3) combined and the bidders have to reduce their grand total
amount of Work. No. (1), (2) and (3) combined in decrement of value as decided
before start of e-Reverse Auction. After e-Reverse Auction process, L1 bidder shall
be decided based on the lowest grand total amount bid for the Work No. (1), (2)
be decided based on the lowest grand total amount bid for the Work No. (1), (2)
and (3) combined.
Percentage reduction in the estimated value of all works together by e-reverse
auction process will be equally applied to all the works i.e. Work No. (1), (2) and
(3) i.e. equal percentage in the work component of all the three works as well as in
the diesel component and the diesel component will be adjusted in Litre per Te or
Liter per CuM accordingly.
Since GIPCL proposes to outsource works of:
1. Turnkey mining contract for over burden / inter burden removal, Raising,
Gujarat Industries Power Company Limited
Producing and Transportation of sized Lignite (-(minus) 250 mm size) from
Valia Lignite Mine to SLPP Power Plant as shown in the Surface Plan
(Annexure No. 2 and 2/A) and Lignite Transport Plan (Annexure No. 3).
Further, The Contractor shall provide necessary assistance to GIPCL in the
process of land acquisition and R&R for the area admeasuring 491.90.34
hectares situated in the villages of Amandera, Mangrol, Harsani, and Nani
Pardi, comprising private land, Government land, and Government Gaucher
land, in accordance with the provisions set out in the Contract and as may be
required from time to time.
2. Re-handling of the external dump as shown in the Surface Plan (Annexure No.
3. Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/ Blended
Fuel from Stockyards at various locations throughout the years (including
monsoon period) by using Heavy Earth Moving Equipments as shown in Lignite
Re-Handling Plan (Annexure No. 4).
The Bidders have to carry out all these works together and will quote firm rate in
terms of Rupees.
Sr. No. Description Estimated Unit Rate in Amount
Quantity Rs. per in Lakh
(In Lakh Unit Rs.
Work-1 Rate for Turnkey work for Over burden / inter burden removal, Raising,
Producing and Transportation of sized Lignite (-(minus) 250 mm size) to SLPP
Power Plant and other ancillary activities as defined in Section V, Mining-Part II
(Scope of Work & Special Conditions of the Contract):
A Work Component 420.00 Rs./ Te --------
(Excluding Diesel)
B (i) Diesel Component Litre per Te --------
B (ii) Average Monthly Price of Rs. per Litre
the Diesel (Average out of
Monthly Price of the Diesel
for March, 2026 at PSU
Outlet at Nani Naroli)
B=(i x ii) Diesel Component 420.00 Rs./ Te B(i) x
Sub-Total Rate in Rs./Te (A + B) and Amount
Work-2 Rate for Re-handling of the External Dump and other ancillary activities as
defined in Section V, Mining-Part II (Scope of Work & Special Conditions of the
A Work Component 205.00 Rs./ CuM --------
(Excluding Diesel)
B (i) Diesel Component Litre per CuM --------
B (ii) Average Monthly Price of Rs. per Litre
the Diesel (Average out of
Monthly Price of the Diesel
for March, 2026 at PSU
Outlet at Nani Naroli)
Gujarat Industries Power Company Limited
B=(i x ii) Diesel Component 205.00 Rs./ CuM B(i) x
Sub-Total Rate in Rs./Te (A + B) and Amount
Work-3 Rate for Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/
Blended Fuel from Lignite Stockyards at various locations throughout the years
(including monsoon period) by using Heavy Earth Moving Equipments and other
ancillary activities as defend in Section V, Mining-Part II (Scope of Work &
Special Conditions of the Contract):
A Work Component 509.48 Rs./ CuM --------
(Excluding Diesel)
B (i) Diesel Component Litre per CuM --------
B (ii) Average Monthly Price of Rs. per Litre
the Diesel (Average out of
Monthly Price of the Diesel
for March, 2026 at PSU
Outlet at Nani Naroli)
B=(i x ii) Diesel Component 509.48 Rs./ CuM B(i) x
Sub-Total Rate in Rs./CuM (A + B) and Amount
Grand Total Amount of Work (1), (2) and (3) exclusive of GST
Grand Total Amount of Work (1), (2) and (3) exclusive of GST
Rates include all taxes except GST. The Rates quoted shall be applicable to quantity
variation also.
i. Billing will be based on the quantity of each item/work separately and the
payment shall be made only on the basis of -250 mm size lignite delivered,
Re-handling of the External Dump and Stacking, Compacting, Blending and
Re-Handling of Lignite/ Coal/ Blended Fuel from Stockyards at various
locations and as per the scope of work. No separate payments shall be made
for other ancillary work carried out by the Contractor.
ii. Management reserves the right to accept or overlook or reject any lower rate
offered by the Bidder without assigning any reason thereof.
iii. The Bidders are required to quote the rates strictly as per the terms and
conditions mentioned above. The conditional bid will not be entertained and
will be summarily rejected.
iv. Rate quoted shall remain valid for 180 days from the date of submission of
price bid, which shall have to be extended unconditionally for further
maximum of period 60 days, as deemed fit by GIPCL.
v. GST and any other fresh imposition or variation in taxes or payable by the
Bidder, shall be reimbursed by GIPCL to the extent levies during the
currency of the contract, if applicable and directly related to the services
rendered by the Bidder under this contract.
vi. Grand total amount of Work (1), (2) and (3) combined shall be
vi. Grand total amount of Work (1), (2) and (3) combined shall be
considered for deciding the lowest five bidders (minimum) or 50% out of
total bidders (rounded to the next higher whole number), whichever is higher
for making them eligible for the e-reverse auction. The lowest grand total
for making them eligible for the e-reverse auction. The lowest grand total
amount of Work (1), (2) and (3) combined shall be considered as the
base rate which will be put up for starting e-Reverse Auction.
vii. Decremental value and duration for the e-Reverse Auction shall be informed
Gujarat Industries Power Company Limited
to the qualified bidders before start of e-Reverse Auction.
viii. e-Reverse auction shall be for reducing the lowest grand total amount of
viii. e-Reverse auction shall be for reducing the lowest grand total amount of
Work No. (1), (2) and (3) combined and the bidders have to reduce grand
total amount of Work No. (1), (2) and (3) combined in decrement of value
total amount of Work No. (1), (2) and (3) combined in decrement of value
as decided before start of e-Reverse Auction.
ix. After e-Reverse Auction process, L1 bidder shall be decided based on the
lowest grand total amount bid for the Work No. (1), (2) and (3)
lowest grand total amount bid for the Work No. (1), (2) and (3)
x. Percentage reduction in the grand total amount of all works together by e-
x. Percentage reduction in the grand total amount of all works together by e-
reverse auction process will be equally applied to all the works i.e. Work
No. (1), (2) and (3) i.e. equal percentage in the work component of all the
three works as well as in the diesel component and the diesel component will
be adjusted in Litre per Te or Liter per CuM accordingly.
xi. L1 Bidder, declared after the e-Reverse Auction process may be called for
negotiation and if required, may be asked by GIPCL for reduction in rates of
any of works, if found quoted unreasonably high.
Illustrative Example:
Quoted Rates by the Bidders are as follows:
Estimate Quoted Quoted Price of Quoted Total Amount
d Work Diesel Diesel as Diesel Rate (Rs. in
Quantity Compon Compon on the Compon (Rs. per Lakh)
Name (Lakh ent ent date of ent Te)
of the Te) (Rs. per (Litre publishi (Rs. per Status
Bidder Te) per Te) ng of Te)
Estimate Quoted Quoted Price of Quoted Total Amount
d Work Diesel Diesel as Diesel Rate (Rs. in
Quantity Compon Compon on the Compon (Rs. per Lakh)
(Lakh ent ent date of ent CuM)
CuM) (Rs. per (Litre publishi (Rs. per
CuM) per ng of CuM)
Gujarat Industries Power Company Limited
Estimate Quoted Quoted Price of Quoted Total Amount
d Work Diesel Diesel as Diesel Rate (Rs. in
Quantity Compon Compon on the Compon (Rs. per Lakh)
(Lakh ent ent date of ent CuM)
CuM) (Rs. per (Litre publishi (Rs. per
CuM) per ng of CuM)
Evaluation of Price Bid:
Name of Name of the Bidder
Work A B C D E F G
Status L1 L4 L5 L2 L7 L6 L3
Base Rate for the e-reverse Auction is the lowest grand total amount of Work
Base Rate for the e-reverse Auction is the lowest grand total amount of Work
(1), (2) and (3) combined i.e.: Rs. 71300.00 Lakh quoted by Bidder A.
Let’s assume that after e-reverse auction, the reduction in grand total amount
Let’s assume that after e-reverse auction, the reduction in grand total amount
of all works together is 7000.00 Lakh and Bidder G is the L1 Bidder after e-
reverse auction then he will become the successful bidder with grand total
reverse auction then he will become the successful bidder with grand total
amount of Rs. (71300.00 - 7000.00) Lakhs = Rs. 64300.00 Lakhs.
Hence % reduction for final L1 Bidder G will be 11.2281% w.r.t. his quoted total
amount of Rs. 72432.80 Lakh.
Gujarat Industries Power Company Limited
Final Rates after 11.2281% reduction, post e-reverse auction, for the Bidder G
Estimate Final Work Final Price of Final Total Amount
d Componen Diesel Diesel as on Diesel Rate (Rs. in
Quantity t (Rs. Compon the date of Componen (Rs. per Lakh)
Work (Lakh per Te/ ent publishing t Te/
Te/ CuM) (Litre per of Tender (Rs. per CuM)
CuM) Te/ (Rs. per Te/ CuM)
However, Contractor shall be required to execute actual quantities as per direction
of GIPCL and shall be paid for the actual work done on the rates awarded.
As this is a captive lignite mine for Surat Lignite Power Plant, the actual quantity of
OB/IB and lignite will depend solely on the requirement of the power plant after
taking into account lignite availability from Mangrol Mine. GIPCL shall have sole
discretion as to the requirement of lignite for generation of electricity from time to
time. The Contractor has agreed and understood that the requirement of lignite by
Power Plant may vary from time to time, to which the Contractor shall not have any
objection. Accordingly, the Contractor shall not be entitled to any compensation or
indemnity on account of increase or decrease in the quantity of lignite.
The Contractor hereby agrees and undertakes specifically not to claim any
compensation/indemnity whatsoever for reduced quantities of lignite in any year as
described here above.
3.19 GIPCL reserves the right:
1. To accept or reject any Bid, wholly or in part, and to annul the bidding process
and reject all Bids at any time prior to the award of the Contract, without
assigning any reason whatsoever and without thereby incurring any liability or
obligation to the affected Bidder(s). The Bidder shall not be entitled to claim any
compensation, costs, damages or expenses on account of such rejection or
annulment of the bidding process.
2. Notwithstanding anything contained in the bidding documents, GIPCL shall not
be bound to accept the lowest Bid or any Bid and reserves the absolute right to
accept or reject any Bid at its sole discretion.
3. To increase, decrease, modify or omit the quantity of work and/or the period of
the Contract, either in whole or in part, at any time depending upon operational,
technical or project requirements. The Contractor shall not be entitled to claim
any compensation or damages on account of such variation, except payment for
the work actually executed in accordance with the terms of the Contract.
4. To omit or not to execute any part of the work covered under the scope of the
Contract, in whole or in part, at its discretion. In such event, the Contractor shall
not be entitled to any claim towards loss of profit, loss of opportunity, idle
Gujarat Industries Power Company Limited
charges, overheads or any other consequential damages.
5. To reject the Bid or terminate the Contract at any stage if it is found that the
Bidder or Contractor has furnished any false, incorrect, misleading information
or forged document along with the Bid or at any stage during the execution of
the Contract. In such event, the Earnest Money Deposit (EMD) and/or
Performance Bank Guarantee (PBG) shall be liable to forfeiture and GIPCL
shall also be entitled to take such further action, including blacklisting or
banning the Bidder/Contractor from future participation in tenders of GIPCL, as
may be deemed appropriate.
6. To reject the Bid of any Bidder who has previously executed or is executing
work at GIPCL-SLPP and whose performance has been found unsatisfactory or
deficient, including but not limited to delay in mobilization, delay in execution,
non-compliance with statutory requirements, breach of contractual obligations,
or failure to perform the work in accordance with the scope of work and terms of
the Contract. GIPCL shall also have the right to disallow such Bidder from
participating in the bidding process. The determination of unsatisfactory
performance by GIPCL shall be final and binding on the Bidder.
3.20 Acceptance of LOI and Payment of Performance Security Deposit:
Within 15 days of issue of LoI, the Contractor will submit the performance bank
guarantee (PBG) @ 5%, along with the acceptance of LoI, in the manner prescribed
in Clause No. 3.15 of Section-III, “Instruction to the Bidders”. The failure shall be
deemed to be refusal by the Bidder to accept the LoI and amount of EMD will be
forfeited and necessary further action may be initiated as may be deemed fit by the
3.21 Contract Agreement and Commencement of Work:
3.21.1 The Contractor, along with the submission of PBG, will also enter into agreement
with GIPCL on appropriate stamp paper (to be provided by the Bidder) in token of
acceptance of the terms and conditions of the contract, within 18 days of issue of
A letter, authorizing Contractor to commence the work will then be issued by
GIPCL. The Contractor will have to mobilize required manpower, recourses
and equipments and start the actual excavation work within 30 (Thirty) days
from the date of agreement. In case of failure to commence the work within the
stipulated mentioned period, the contract may be terminated, at the discretion of
3.21.2 The zero-date reckoned for the contract shall be the date of agreement:
3.21.3 The Contractor shall organize medical examination as per Mines Rules and
vocational training of their manpower, to be deployed in the mine, after receipt of
the authorization letter and before commencement of the work, under the provision
of MVTR, at GIPCL’s Vocational Training Centre.
3.21.4 The agreement should be signed by the below mentioned signatories:
Individual : Individual himself.
Proprietary firm : Proprietor himself.
Partnership firm : Senior Authorized Managing Partner
Limited company : Managing Director or Functional Director duly authorized
Gujarat Industries Power Company Limited
by the Board of Directors.
3.21.5 Term of the Agreement:
This Agreement shall come into effect from the commencement date of the Contract
i.e. Agreement date and shall remain valid till the end of period of fifteen years from
effective date of agreement unless terminated earlier in accordance with Clause No.
3.22 Fraud and Corrupt Practices:
1. The Bidders/Contractor and their respective officers, employees, agents and
advisers shall observe the highest standards of ethics and governance during the
bidding process and subsequent to the issue of the LoI and during the
subsistence of the Contract. Notwithstanding anything to the contrary contained
herein, or in the LoI or the Contract, GIPCL may reject a Bid, withdraw the LoI,
or terminate the Contract, as the case may be, without being liable in any manner
whatsoever to the Bidder/Contractor, if GIPCL determines that the
Bidder/Contractor, has, directly or indirectly or through an agent, engaged in
corrupt practice, fraudulent practice, coercive practice, undesirable practice or
restrictive practice in the bidding process or in the performance of the Contract.
In such an event, GIPCL may forfeit and appropriate the bid security and/or
performance security, as the case may be, pre-estimated compensation and
damages payable to GIPCL towards, inter alia, time, cost and effort of GIPCL,
without prejudice to any other right or remedy that may be available to GIPCL
herein or otherwise.
2. Without prejudice to the rights of GIPCL hereinabove and the rights and
remedies which GIPCL may have under the LoI or the contract, if
Bidders/Contractor, is determined by GIPCL to have directly or indirectly or
through an agent, engaged or indulged in any corrupt practice, fraudulent
practice, coercive practice, undesirable practice or restrictive practice during the
bidding process, or after the issue of the LoI or during the execution of the
Contract, the Contract may be liable to termination at the sole discretion of
GIPCL, without any liability of compensation or indemnity on the part of
GIPCL and that such Bidder/Contractor shall not be eligible to participate in
any bid or RFP issued by GIPCL during a period of 2 (two) years from the date
such Bidder/Contractor is determined by GIPCL to have directly or indirectly or
through an agent, engaged or indulged in any corrupt practice, fraudulent
practice, coercive practice, undesirable practice or restrictive practices, as the
3. For the purposes of this Clause, the following terms shall have the meaning:
a. “corrupt practice” means the offering, giving, receiving, or soliciting, directly
or indirectly, of anything of value to influence the actions of any person
connected with the bidding process and/or during execution of the Contract
(for avoidance of doubt, offering of employment to or employing or engaging
in any manner whatsoever, directly or indirectly, any official of GIPCL who
is or has been associated in any manner, directly or indirectly with the
bidding process or the LoI or has dealt with matters concerning the Contract
or arising there from, before or after the execution thereof, at any time prior
to the expiry of one year from the date such official resigns or retires from or
Gujarat Industries Power Company Limited
otherwise ceases to be in the service of GIPCL, shall be deemed to constitute
influencing the actions of a person connected with the bidding process and/or
during the execution of the Contract);or (ii) engaging in any manner
whatsoever, whether during the Bidding Process or after the issue of the LoI
and/or during/after the execution of the Contract, as the case may be, any
person in respect of any matter relating to the Contract or the LoI or the upto
one month after financial closure, who at any time has been or is a legal,
financial or technical adviser of GIPCL in relation to any matter concerning
the Bid/ LoI/ Contract;
b. “fraudulent practice” means a misrepresentation or omission of facts or
suppression of facts or disclosure of incomplete facts, in order to influence
the bidding process/ issue of LoI or during the execution of the Contract;
c. “coercive practice” means impairing or harming, or threatening to impair or
harm, directly or indirectly, any person or property or interest of GIPCL to
influence any person’s participation or action in the Bidding Process or
impairing or harming, or threatening to impair or harm, directly or indirectly,
any person or property to influence actions of any person of GIPCL during
the execution of the contract;
d. “undesirable practice” means (i) establishing contact with any person
connected with or employed or engaged by GIPCL or any other person with
the objective of canvassing, lobbying or in any manner influencing or
attempting to influence the Bidding Process/ issue of LoI or execution of the
Contract; or (ii) having a Conflict of Interest; and
e. “Restrictive practice” means forming a cartel or arriving at any understanding
or arrangement among Bidders/Contractors with the objective of restricting or
manipulating a free and fair competition in the bidding process and/or with
the objective of restricting or manipulating lignite supply during execution of
Gujarat Industries Power Company Limited
Qualifying Criteria
4.1 Experience:
4.1.1 The Bidder shall possess experience in works of a similar nature, including earth
excavation in mines, overburden removal, and mining of coal/lignite using hydraulic
shovels/excavators with matching dumpers or surface miners, and shall enclose
documentary proof of such experience.
The Bidder shall submit attested copies of relevant work orders along with
corresponding work completion certificates issued by the respective clients. The
work completion certificates shall clearly indicate the executed quantities in CuM
and/or tonnes, as applicable. The experience claimed shall be for works executed
Where experience relating to land acquisition forms part of the scope claimed, the
Bidder shall furnish a certificate from the owner confirming completion or ongoing
land acquisition activities. Further, Bidder should have a minimum of two (2) years
of experience, in similar nature of works related to land acquisition for mining
projects/ contracts, including activities such as liaisoning with Government
authorities, assistance in land acquisition processes, coordination with landowners,
documentation, and facilitation of Rehabilitation and Resettlement (R&R) related
The Bidder shall submit documentary evidence in support of the above experience in
the form of self-attested copies of Work Orders along with Work Execution
Certificates and/or Work Completion Certificates issued by the respective Clients.
Failure to submit the requisite documentary evidence may render the Bidder’s claim
of eligibility liable for rejection.
The experience should be either of the following:
a. Bidder should have executed the work, from one single order or from
one single mine, of at least 164.00 Lakh CuM aggregate of OB/IB
and Coal/ Lignite, out of which there should be minimum
Lakh Te of Coal/ Lignite, in any of the last five financial years (FY
b. Bidder should have executed the work, from two orders each or from
two single mines each, of at least 109.00 Lakh CuM aggregate of
OB/IB and Coal/ Lignite, out of which there should be minimum
13.00 Lakh Te of Coal/ Lignite, in any of the last five financial years
c. Bidder should have executed the work, from three orders each or
Gujarat Industries Power Company Limited
from three single mines each, of at least 82.00 Lakh CuM aggregate
of OB/IB and Coal/ Lignite, out of which there should be minimum
10.00 Lakh Te of Coal/ Lignite, in any of the last five financial years
Experience taken in the capacity of sub-contractor shall also be considered provided
experience certificate is issued, by the Main company, for which the contract work
is carried out, in the name of sub-contractor.
Note: - For conversion 1.00 CuM of lignite should be taken as 1.16 Te of Lignite
and 1.00 CuM of coal to be taken as 1.4 Te of Coal, if the specific gravity is not
mentioned in the experience certificate.
4.1.2 The Bidder should directly own and should readily have adequate number of Heavy
Earth Moving Machinery (HEMM) for a capacity of minimum 137.00 Lakh CuM/
Annum of earth excavation/OB removal/Coal/Lignite raising. The details of
machinery owned should be provided in Form-D along with a certificate from
Chartered Accountant in Form-D.
4.2 Financial Standing of the Party:
The Bidder has to satisfy the following financial criteria of Turnover and Net worth
in order to be considered in the Bidding process:
1. The Bidder shall have to fulfill the Net worth requirement of at least Indian
Rupees 82.00 Crore (Rupees Eighty-Two Crore Only) as on 31st March,
2. The Bidder shall have to fulfill the annual turnover requirement of at least Indian
Rupees 245.00 Crore (Rupees Two Hundred and Forty-Five Crore Only) in
all the last 3 Financial Years (2022-23 to 2024-25).
3. Bidders must have a Minimum Working capital of Rupees 73.00 Crore
(Rupees Seventy-Three Crore Only) as on 31st March,
1. The terms Net worth and Turnover shall have the meaning and definition as
stated in this document.
2. Bidder shall furnish annual audited financial statement duly certified by
Chartered Accountant for the last three financial years to demonstrate the
financial healthiness of the company.
3. Where the financial statement is expressed in currency other than Indian Rupees,
the financial qualification as described above shall be computed by converting
the financial figures to Indian Rupees based on the exchange rates (RBI
Reference Rate) prevailing rate on last date of submission of bids.
4.3 Requirements during Bid Submission:
4.3.1 Bids submitted by a limited company shall comply with the following
Gujarat Industries Power Company Limited
1. The bid documents duly signed by an authorized person with a copy of Power
of Attorney signed by Managing or Functional Director/ resolution of the Board
of Directors shall be furnished along with the bid.
2. A certified copy of the Memorandum and Articles of Association of the
company should be submitted.
4.3.2 Bids submitted by a Partnership firm shall comply with the following
1. The bid documents duly signed by an authorized person (who should be a
partner) with a written Power of Attorney shall be furnished along with the bid.
2. A copy of the partnership deed of the partnership firm which is the Bidder
certified to be true by the company secretary of the Bidder or if unavailable,
from an independent company secretary (Partnership deed can be certified by
Notary public or Govt. gazette officer)
4.4 Ownership of Machinery/Equipment:
The Bidder should directly own, possess and be in a position to readily deploy below
mentioned heavy earth moving machineries for annual OB/ IB removal, Re-handling
of OB/IB, Lignite raising, lignite transportation and lignite/coal Re-handling of
minimum 137.00 Lakh CuM/ Annum of earth excavation/OB removal
/Coal/Lignite raising, while submitting the offer.
Sr. No. Particulars
A OB/ IB Removal/ OB DUMP Re-handling:
1. Hydraulic Excavators (Diesel Operated) of not less than 3.1 CuM
2. Dumpers/ Haulers of 35 Te Gross Vehicle Weight or bigger
capacity/350 HP or bigger/18 CuM or bigger box capacity full canopy
as certified by the manufacturer.
3. Dozer of about 180 HP capacity.
B Lignite Mining:
1. Hydraulic Excavators (Diesel Operated) of not more than 3.1 Cum
bucket/ of appropriate capacity.
2. Dumpers/ Haulers of 35 Te Gross Vehicle Weight or bigger
capacity/350 HP or bigger/18 CuM or bigger box capacity full canopy
as certified by the manufacturer.
3. Dozer of about 180 HP capacity.
C Lignite Transportation from Valia Lignite Mine to SLPP:
1. Hydraulic Tippers/ Dumpers (8 X 4, Double differential) of at least
Te Gross Vehicle Weight as certified by the RTO will be allowed to
transport -250 mm sized lignite. These tippers/dumpers should be
compatible for GIPCL weighbridges and delivering lignite at Vastan
Feeder Breaker/ Apron Feeder or any other delivery point decided by
2. Hydraulic Tippers/ Dumpers of 16-Tyre (10 x 4) of at least 47.50 Te
Gujarat Industries Power Company Limited
Gross Vehicle Weight and 29.00 Cubic Meter Capacity as certified by
the RTO will be allowed to transport -250 mm sized lignite. These
tippers/dumpers should be compatible for GIPCL weighbridges and
delivering lignite at Vastan Feeder Breaker/ Apron Feeder or any other
delivery point decided by GIPCL.
D Lignite Re-handling at SLPP:
1. Hydraulic Tippers/ Dumpers (8 X 4) of at least 31 Te Gross Vehicle
Weight as certified by the RTO to re-handle the Lignite/ Coal/
Blended Fuel from Stockyards.
2. Minimum two Numbers of Hydraulic Excavators (Diesel Operated) of
not less than 3.1 CuM bucket capacity each and at least two Number of
lower Capacity Hydraulic Excavators (Diesel Operated) of not less
than 2.1 CuM bucket capacity for the Re-Handling of blended fuel for
minimum 600 TPH. However, Bidder may deploy bigger capacity
excavators provided that the Re-Handling of blended fuel for
minimum 600 TPH at any of either location should be achieved.
3. Two Dozer of about 165 HP capacity.
4. Pressurized Water Sprinklers of a design approved by GIPCL-
Minimum 1No. of 15 KL.
E Auxiliary and Service Equipment
1. Graders 145 HP
2. Construction Backhoe (0.9 cum)
3. Pressurized Water Sprinklers of a design approved by GIPCL-
Minimum 3 Nos. of 15 KL.
The Bidder should directly own, possess and be in a position to readily deploy above
mentioned heavy earth moving machineries for Overburden, Re-handling of OB/IB,
Lignite Mining & Sizing, Lignite Re-handling and lignite transportation of
minimum 137.00 Lakh Cum/ Annum of earth excavation/OB removal
/Coal/Lignite raising, while submitting the offer.
4.6 Solvency Certificate:
The Bidder must have sound financial position to buy and deploy adequate
machinery so as to meet the targets as per the given schedule. The Bidder should
produce a Solvency Certificate from any Nationalized Banks, Axis Bank, ICICI
Bank, HDFC Bank, Kotak Mahindra Bank, IndusInd Bank, Federal Bank, Bandhan
Bank, IDBI Bank and Karur Vysya Bank, for an amount not less than Rupees
Crore (Rupees Seventy-Three Crore Only) issued in last twelve months. Non-
submission of solvency certificate will attract disqualification.
4.7 Additional Pre-Qualification Criteria:
Bidder shall have to submit the “Declaration for Civil and Criminal Disputes /
Litigations” as amended in Form-H attached.
The Bidder shall submit a duly executed “Declaration for Civil and Criminal
Disputes / Litigations” in the format prescribed under Form-H, as amended and
attached to this Tender Document.
In the event the Bidder, or any of its partners or directors, is or has been involved in
Gujarat Industries Power Company Limited
any litigation, arbitration, or other legal proceedings, whether pending or concluded,
during the preceding five (5) years from the date of submission of the Bid, the
Bidder shall disclose full particulars of such proceedings in the prescribed format.
GIPCL reserves the right to scrutinize the disclosures and any supporting documents
relating to such litigation or proceedings, and to assess the nature, gravity, and
relevance of the same for the purpose of determining the Bidder’s eligibility and
suitability for the present tender.
GIPCL may also consider the frequency, pattern, and nature of such disputes in
assessing the Bidder’s suitability for the present contract work.
Based on such scrutiny, GIPCL may, at its sole discretion, reject the Bid if it is of
the opinion that the litigation history or circumstances disclosed are likely to
adversely affect the Bidder’s ability, integrity, reliability or capacity to perform the
Contract. Without limitation, such circumstances may include:
(a) termination of any prior contract for default or non-performance;
(b) blacklisting, debarment, or suspension by any government authority or public
sector undertaking;
(c) repeated disputes relating to delay, non-performance, or imposition of liquidated
damages in comparable projects;
(d) pending proceedings relating to insolvency, winding up, or material financial
(e) litigation involving allegations of fraud, corruption, or misrepresentation in
procurement or contractual matters; or
(f) litigation that may materially impair the Bidder’s financial resources, assets, or
operational capability required for execution of the Contract.
The decision of GIPCL in this regard shall be final and binding for the purposes of
evaluation of the Bid under this Tender Document.
Failure to disclose any material litigation or furnishing of false or misleading
information shall render the Bid liable for rejection.
GIPCL may seek additional information or clarification regarding any disclosed
litigation and the Bidder shall promptly provide the same.
4.8 Acceptance of General Terms and Conditions:
The Bidder should unconditionally accept all the terms and conditions of the
contract by signing on each page of the bid document including Annexures.
4.9 Declaration:
The Bidder should give a declaration along with the Techno-Commercial Bid that it
Gujarat Industries Power Company Limited
has not enclosed any conditional offer in the Form E.
4.10 Legal Compliance:
The Bidder must possess a valid PF Registration Number issued by RPFC.
4.11 Conflict of Interest:
A Bidder shall not have any conflict of interest (the “Conflict of Interest”) that
affects, or may reasonably be considered to affect, the fairness, transparency or
integrity of the bidding process. Any Bidder found to have a Conflict of Interest
shall be liable to be disqualified from the bidding process. In the event of such
disqualification, GIPCL shall be entitled to forfeit and appropriate the Bid Security
or Performance Security, as the case may be, as mutually agreed genuine pre-
estimated compensation and damages payable to GIPCL for, inter alia, the time, cost
and effort incurred by GIPCL in connection with the bidding process, including the
evaluation and consideration of such bids, without prejudice to any other rights or
remedies available to GIPCL under this Tender Document, the Contract or otherwise
in law. Without limiting the generality of the above, a Bidder shall be deemed to
have a Conflict of Interest that affects the bidding process if:
1. such Bidder (or any constituent thereof) and any other Bidder (or any constituent
thereof) have common shareholders or cross-shareholding or other ownership
interest; provided, however, that this restriction shall not apply where the direct
or indirect shareholding of a Bidder, or of a constituent thereof, in another
Bidder (or any of its constituents) is less than ten percent (10%) of its paid-up
and subscribed capital; or
2. a constituent of such Bidder is also a constituent of another Bidder or is a partner
in another Bidder; or
3. such Bidder receives or has received any direct or indirect subsidy, financial
support or benefit from any other Bidder, or has provided any such subsidy,
financial support or benefit to any other Bidder; or
4. such Bidder has the same representative or authorized signatory for the purposes
of this Bid as any other Bidder; or
5. such Bidder has a relationship with another Bidder participating in this Bid,
whether directly or through common third parties, which places them in a
position to have access to information relating to the Bid of such other Bidder, or
to influence or potentially influence the Bid submitted by either or both Bidders.
For the avoidance of doubt, a relationship with any third party who is not
participating as a Bidder in the present bidding process shall not, by itself,
constitute a Conflict of Interest under this clause.
6. such Bidder has participated, whether directly or indirectly, as a consultant to
GIPCL in the preparation of any documents, designs or technical specifications
relating to the Project.
Gujarat Industries Power Company Limited
Mining - Part I (Geology of the Deposit)
5.1.1 General Geology of Valia Lignite Block:
GIPCL carried out geological investigation in Valia Block and based on surface and
subs-surface data generated, observed that lignite is confined to Cambay shales of
lower Tertiary group (Eocene age) underlain by trap formation belonging to upper
cretaceous. Based on the above study a generalized geological sequence has been
suggested, details of which are given in below Table:
Sr. No. Formations Group
1 Black Cotton Recent to
2 Kankar/Brown Calcareous clay/Bentonitic clays sub recent
3 Clay with occasional friable sandstone and/or sideritric Lower
siltstone bands with carbonaceous zones including lignite. Eocene
4 Basalt – Deccan Trap Upper
5.1.2 Exploration & Interpretation:
The Gujarat Industries Power Company Limited took up confirmatory drilling for
lignite of this area in the year 2013-14 in land already acquired and encountered
Lignite of very good quality. During the course of activity, GIPCL has explored the
Valia deposit with sufficient close grid drilling.
The Contractor shall undertake confirmatory exploration activities in areas within the
aforesaid extent of 491.90.34 hectares of land to be acquired.
The lignite occurs mainly in the three main lignite horizons (03) including some
local seams at various depths in Valia Lignite Mine separated by clay sediments.
Each Lignite horizon could have one thick lignite seam or multiple laterally
discontinuous split seams.
Total number of holes and meterage drilled in the Valia Block are as under:
Block No. of Boreholes Spacing Total Meterage
Valia 58 250 X 250 m
The data so obtained was further synthesized by GIPCL with the help of Datamine
software for reserve estimation and presentation of detailed analysis. The following
criteria were considered for estimation of mineable reserves for entire lease area is as
Valia Lignite Details
Depth from OGL As per exploratory and in-situ lignite
Lig. Seam (in M) Proximate Analysis
Min Max Weighted Weighted Weighted
Gujarat Industries Power Company Limited
Average Average Average
Moisture Ash CV
(%) (%) (Kcal/kg)
Lignite seam having thickness less than 0.30 mtr. not considered in the
estimation of quantity of lignite.
All the estimates are made based on this data. There may be variation between the
estimates and the actual quantities. The Bidder may verify or confirm the accuracy of
above figures and the occurrence of hard strata, through their own independent
sources either by doing survey/ test drillings etc at their own costs. The Contractor
shall not be relieved of the obligation under the contract due to any loss that it may
sustain as a result of any variance between conditions shown in the drawing and the
actual or otherwise.
The Contractor must personally inspect the site and all other information provided
herein above and apprises themselves of all required and appropriate information.
The Contractor shall, regardless of the information having being provided in this
document or not, be deemed to have all such information as may be required or
necessary with respect to participating in the tender.
5.1.3 Physiography & Drainage Pattern:
The area is generally plain with little slope from east to west. The proposed area
exhibits a plain topography. The minimum to maximum RL of the area is 38M to
46M above MSL. No drainage pattern is observed in the block.
5.1.4 Surface Water:
Climate of the area is subtropical. The annual rainfall recorded during past 15 years
ranges between 538.7 mm to 2310 mm. The highest precipitation occurs normally
from last week of June to First week of October. The area in general is more or less
flat with some minor undulations. The general slope of the area is towards Tokri
River, which is the tributary of Kim river flowing from the north eastern part. Kim
river is a seasonal river which flows in the northwest direction. Normally 245 days
are available for actual working in the proposed mining area.
5.1.5 Ground Water:
Entire area is covered with a thick blanket of black cotton soil except the eastern part
where occasional trap exposures could be seen. Black cotton soil is derived as a result
of weathering of trap rock subsequently transported and accumulated in the area. This
soil mantle is underlain by Kankar or Bentonitic clay bed, limonitic in nature
followed by argillaceous litho-unit, which hosts lignite and is impervious in nature.
The set-up of litho-units is such that there are limited chances of accumulation of
ground water in the area. However, the upper Kankar bed wherever occurring,
limited amount of ground water accumulated as a result of percolation of the rain
water for which no authentic data is however available.
Gujarat Industries Power Company Limited
Mining - Part II (Scope of Work & Special Conditions of the Contract)
5.2.1 Area Covered in the Scope of Work:
The mine lease area (total) relating to the scope of work of Removal of OB/ IB,
Lignite Raising, Crushing and Transportation of sized Lignite (- 250 mm size)
from Valia Lignite Mine and Re-handling of External Dump as described in this
bid document lies between 21°28'31.00"N and 73° 9'10.83"E to 21°28'52.46"N
73°12'27.30"E falls in survey of India Topo-sheet No. 46-G/3.
The areas as defined above have been marked in the enclosed drawings;
Management at its sole discretion may alter the boundary line/ limits in case of
difficulties for what so ever reasons beyond the control of company.
5.2.2 Scope of Work:
Description of work:
5.2.2.1 Turnkey work of Removal of OB/ IB, Lignite Raising, Crushing and
Transportation of sized Lignite (- 250 mm size) from Valia Lignite Mine to
SLPP Power Plant:
Providing Hydraulic Excavators (Diesel Operated) of not less than 3.1 CuM bucket
for OB/IB, Hydraulic Excavators (Diesel Operated) of not more than 3.1 CuM
bucket capacity for Lignite, Dumpers/ Haulers of at least 35 tonne or bigger gross
capacity of / 350 HP or bigger/18 CuM or bigger box capacity as certified by the
manufacturer for OB/ IB removal and lignite raising and Hydraulic Tippers/
Dumpers (8 X 4, Double differential) of at least 31.00 Te Gross Vehicle Weight and
Hydraulic Tippers/ Dumpers of 16-Tyre (10 x 4) of at least 47.50 Te Gross Vehicle
Weight and 29.00 Cubic Meter Capacity as certified by the RTO as certified by the
RTO for transporting sized lignite from Valia Lignite Mine to power plant,
crushing/ sizing/ breaking system & equipments and other ancillary equipments like
Dozers, Motor Graders, Water Sprinklers etc as per the equipment capacity defined
in Clause No. 4.4, commensurate with the quantum of work and providing
operators and other staff for operations and maintenance of equipments for
following works:
1. Removal of top soil from the active mining area upto a thickness of an average
of 1.50 meters thickness if encountered so and dumping at the separate top soil
dump or re-spreading it to the back filled areas so as to re-store the original
ground profile. This activity shall precede the excavation and removal of
2. Excavation of overburden (OB)/ Interburden (IB), like alluvium, Dark Grey/
Variegated Clay/ Fossiliferous Clay/ Carbonaceous Clay, Siltstone, Sandstone
and Conglomerates/ any hard strata as intercalations and including inter burden
between lignite seams), so as to expose the lignite seams successively and
transporting, dumping, dozing, leveling the OB with all leads and all lifts
involved, at Sites as per enclosed plans (Annexure No. 2 and 2A) and as per
Gujarat Industries Power Company Limited
directions of the GIPCL given from time to time.
3. In the existing working area, breaking of hard strata with the help of Rock
breaker may require. Breaking and removal of hard strata, encountered if any in
OB/IB removal in the proposed working areas shall be required to be dealt by
deploying suitable machineries like rock breaker etc as a part of the scope of
work. Further, Blasting is not permitted at the site.
4. The OB/IB shall be back filled in the excavated pit. Backfilling shall be carried
out upto15.00 metre above original ground level & leveled to maintain natural
ground profile as per instructions of GIPCL as shown in the enclosed plan. The
dump height of Dump No. 7 shall be not more than 25.00 metre above ground
level as shown in the Surface Plan (Camp Site).
5. Although all the dumping of OB/IB shall be carried out inside the pit i.e. for
backfilling purpose. But in case of any unsafe condition occurred due to in-
stability of in pit dump etc. the dumping of estimated OB/IB quantity of about
06.00 MCuM excavated from the mine or re-handled from the External
Overburden dump no. 5 & 6 may be carried out outside the pit as per enclosed
plan (Annexure No. 2) only after obtaining approval from the GIPCL. However,
this estimated OB/IB quantity of about 06.00 MCuM may vary by +/- 10.00%.
For this contractor shall not be entitled for any extra compensation.
6. Excavation of lignite seams exposed after removal of OB/IB and loading of
lignite into dumpers for raising it upto Feeder Breaker/ any other mechanical
means of crushing of -250 mm size lignite. This includes creating access ramps
upto the lignite benches for movement of dumpers for loading of lignite. For
loading of lignite suitable size of hydraulic excavators of size of not more than
3.1 CuM bucket capacity shall have to be deployed. The contractor shall make
necessary arrangements for producing lignite strictly of -250 mm size for
supplying to Power Plant. For this purpose, contractor may opt for suitable
capacity of feeder breaker (Pit-top) or any other suitable technology i.e.
installation of grizzly having suitable grid pattern for producing -250 mm size
lignite. The system/technology should be environment friendly and comply all
the provisions w.r.t. dust control including but not limited to effective dry fog
system. The arrangements for producing lignite strictly of -250 mm size shall
include arrangement for receiving ROM Lignite from dumper and primary
sizing of lignite to -250 mm. Structure installed for crushing/ sizing of lignite
(Grizzly) shall be designed by an expert agency to ensure the strength and
stability of the grizzly/structure & report shall be submitted to GIPCL. The
design and installation grizzly/structure will be under the scope of contractor.
7. The arrangements for producing lignite strictly of -250 mm size shall be
designed to handle localize surges that occur due to interruptions in mining
operations. It is paramount that the system selected meets the operational
requirements of the mine. Sufficient spare parts shall be stocked and
maintenance procedures implemented to ensure production and transfer of
MTPA of lignite to the Power Plant.
8. During the contract period, location of existing system of crushing/ sizing
system and weighbridges may be changed and may be shifted to new location at
the proposed location marked in the surface plan, tentatively after first operating
Gujarat Industries Power Company Limited
year as shown in enclosed plan (Annexure No. 2). In such condition, new
crushing/ Sizing system will be installed by contractor without any cost to
GIPCL and Contractor will not have any objection in this.
9. If necessary, Contractor has to blend the minor seams or the lignite seam having
inferior quality if any encountered with main lignite seam for the purpose of
quality of the lignite by excavating such lignite seams and spreading it over the
exposed main lignite seam as directed by GIPCL. No extra claim shall be
entertained for such type of work.
10. Transportation of -250 mm size lignite from Valia Mine feeder breaker or
lignite handling plant location (As per Annexure No. 2 and 4), after weighment
at GIPCL’s weighbridge at Valia Mine to SLPP Power Plant as shown in the
Surface Plan (Annexure No. 2) and Lignite Transport Plan (Annexure No. 3) or
any other delivery point as decided by GIPCL. Again, the weighment of the
lignite shall be carried out at GIPCL’s weighbridge near delivery points as
mentioned above.
11. During the first Operating Year, the Contractor shall deploy a mix of Hydraulic
Tippers/Dumpers (8×4 double differential) having a minimum Gross Vehicle
Weight (GVW) of 31 tonnes and Hydraulic Tippers/ Dumpers of 16-Tyre (10 x
4) of at least 47.50 Te Gross Vehicle Weight and 29.00 Cubic Meter Capacity
as certified by the RTO, in the ratio of 50:50. From the second Operating Year
onwards, the Contractor shall deploy one hundred percent (100%) Hydraulic
Tippers/ Dumpers of 16-Tyre (10 x 4) of at least 47.50 Te Gross Vehicle
Weight and 29.00 Cubic Meter Capacity as certified by the RTO.
12. The approximate weighted average lead distance for transportation of lignite
from Valia Lignite Mine (Weighbridges No. 8, 9, 10, 11 and 12) to SLPP Power
Plant, as indicated in the Lignite Transport Plan (Annexure-3), is about
km (one-way weighted average) during the first Operating Year. The distance
has been calculated considering transportation in the tentative ratio of 40% to
the Feeder Breaker / lignite stockyards near the Feeder Breaker and 60% to the
Apron Feeder / lignite stockyards near the Apron Feeder at SLPP.
From the second Operating Year onwards, upon shifting of the Feeder Breaker
near the Apron Feeder, the approximate weighted average lead distance shall be
about 17.00 km, which may further increase to about 18.50 km after acquisition
of 491.90.34 Ha of land and diversion/shifting of the Mangrol–Moramli
Panchayat Road.
Accordingly, 100% of the lignite shall be transported to the Apron Feeder
and/or lignite stockyards near the Apron Feeder at SLPP. However, until such
shifting is completed, transportation shall continue in the tentative ratio of 40%
and 60% and at average lead distance of about 16.50 km, and no claim or
compensation shall be admissible on account of any variation in lead distance,
transportation arrangement, or unloading locations.
13. While transporting lignite, due care is to be taken to avoid any kind of pollution
& en-route spillages. The contractor shall arrange to cover the dumper/ tipper by
tarpaulin suitably. Before deployment of Hydraulic Tippers/ Dumpers,
Contractor has to register Hydraulic Tippers/ Dumpers for RFID Tag, at GIPCL
Gujarat Industries Power Company Limited
site office. GIPCL will charge @ Rs. 500.00 per RFID Tag for first 150 RFID
Tags. Additional requirement/ replacement of damaged RFID Tag will be @ Rs.
1500.00 per RFID Tag.
14. Hydraulic Tippers/ Dumpers for the purpose of lignite transportation will be
allowed upto Mine Pit Top or Feeder Breaker for the loading of lignite. In any
case Hydraulic Tippers/ Dumpers engaged for the purpose of lignite
transportation will not be allowed for loading of lignite inside the mine pit.
15. Any incident of spillage of lignite on the lignite transportation road from Valia
Lignite Mine to Apron feeder and dealing with fire in the stock yard at Power
Plant end, Contractor shall take immediate steps for cleaning of lignite from
lignite transportation road and will provide HEMM or any other resources
required to dealt with the above situation at the earliest .
16. The contractor shall have a work shop near to the lignite stock area at Power
Plant end to carry out routine maintenance work of HEMM deployed at Lignite
stockyard at Power Plant end.
17. The scope of work will include all other activities whether explicitly mentioned
in the bid document or not, but are required to be undertaken to accomplish the
tendered work at no extra cost to GIPCL.
18. The Contractor shall have to follow the RTO rules for overloading etc. and
other provision of Motor Vehicle Act and Rules. No overloading will be
19. In the event of any local dispute, obstruction, or disturbance arising in
connection with transportation of lignite to the SLPP power plant, within the
mine workings, or in relation to drainage of surface water from the surrounding
villages, the responsibility to resolve such issues shall lie with the Contractor.
The Contractor shall make all necessary efforts and arrangements to ensure
uninterrupted transportation and continuity of operations from the Valia Lignite
Mine to the power plant, notwithstanding the existence of such disputes.
GIPCL may, at its discretion and at its own level, extend appropriate support or
facilitation; however, such assistance shall not dilute, transfer, or absolve the
Contractor of its primary responsibility and liability for resolution of the matter
and for maintaining the required supply of lignite under the Contract.
5.2.2.2 Re-handling of External Dump:
Total quantity for the Re-handling of the external dump is approximately
MCuM of OB/IB lying on the mineralized zone upto OGL and as shown in the
Surface Plan (Annexure No. 2 and 2/B). The Re-handling of the external dump will
be commenced immediately i.e. during the first operating year. The Contractor has
to re-handle the external dump upto Original Ground Level (OGL) and will be paid
for the quantity re-handled upto OGL only.
Re-handling of the external dump shall be carried out and dumped into the in-pit
dump with a dumping height of upto15.00 metre above original ground level,
however if the conditions permit the dumping height shall be increased upto the
25.00 meter from the OGL. Re-handling of the external dump no. 3&4 and 5&6
shall be carried out upto ground level & leveled to maintain natural ground profile
Gujarat Industries Power Company Limited
as per instructions of GIPCL as shown in the Surface Plan (Annexure No. 2/B). The
equipment capacity defined in Clause No. 4.4 shall be deployed for this work.
The monthly targets for the re-handling of external dump shall be provided by
GIPCL at least one month prior to the commencement of operating year.
5.2.2.3 Re-handling of Lignite/ Coal/ Blended Fuel from Stockyards at SLPP Power
Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/ Blended Fuel
from Stockyards at various locations throughout the years (including monsoon
period) by using Heavy Earth Moving Equipments as shown in the Lignite Re-
handling Plan of about 35.00 Lakh tone per year.
Only Hydraulic Tippers/ Dumpers (8X4 Double Axle) of not older than 3 years
with RFID Tag shall be deployed by the Contractor for the work of Re-Handling of
Lignite/ Coal/ Blended Fuel from Stockyards at various locations. Hence, before
deployment of Hydraulic Tippers/ Dumpers, Contractor has to register Hydraulic
Tippers/ Dumpers for RFID Tag, if required by the GIPCL, at GIPCL site office.
GIPCL will charge @ Rs. 500.00 per RFID Tag for first 20 RFID Tags. Additional
requirement/ replacement of damaged RFID Tag will be @ Rs. 1500.00 per RFID
Stacking, Compacting, Blending of Lignite/ Coal by spreading in the layers by
dozers and leveling & compaction of the slope of lignite or Dome Shape to prevent
spontaneous combustion by the dozer will be in the scope of Contractor. Estimated
requirement of the lignite for Power Plant will be 37.50 Lakh Te.
The Contractor will carry out entire Stacking, Compacting, Blending and Re-
Handling of Lignite/ Coal/ Blended Fuel from Stockyards at various locations as
per activity plan and as per the requirement of GIPCL Power Plant from time to
time. The Contactor shall provide manpower for the proper stacking, unloading and
re-handling of Lignite/ Coal/ Blended Fuel from Stockyards at both the ends i.e.
Feeder Breaker /Apron feeder and lignite stockyards irrespective of Lignite/ coal
brought from Valia mine or from any other source.
The Contactor shall always maintain his HEMM fleet for re-handling of blended
fuel for minimum 600 TPH at any of either locations or the equipments will be
deployed as per the instruction of GIPCL Officials i.e. Lignite Stock Yard-1 and
Lignite Stock Yard-2. However, Contractor may deploy bigger capacity excavators
provided that the Re-Handling of blended fuel for minimum 600 TPH at any of
either location should be achieved and the equipments will be deployed as per the
instruction of GIPCL Officials. At least HEMM of required capacity as per Clause
No. 4.4(D) will be provided for the Lignite re-handling activities.
Before onset of monsoon, the lignite heaps have to be covered by Taurpoline by the
agency deployed by GIPCL. Therefore, the compaction of Lignite heap and its
dome shape preparation work shall be commenced as per the instruction of GIPCL
Gujarat Industries Power Company Limited
Officials. Upto the 25th of May of every year, Lignite stocks having at least 50 %
of quantity of Lignite shall be dome shaped & upto10th June, all heaps of Lignite
shall be Dome shaped.
At the Feeder breaker, the contractor shall also carry out stacking/ blending and
levelling work of lignite/ blended fuel heap for operation of Reclaimer at Vastan
During Monsoon months, total feeding of lignite to the power plant will be from re-
handling of lignite/blended fuel only. During non-Monsoon period, re-handling
activities will be carried out as per instructions of GIPCL Officials. Hence,
Contractor shall deploy the required equipments at both the locations.
The Contactor shall always maintain his HEMM fleet for re-handling of
blended fuel for minimum 600 TPH at any of either locations or the
equipments will be deployed as per the instruction of GIPCL Officials i.e.
Lignite Stock Yards at Vastan Feeder Breaker and Apron Feeder.
5.2.2.4 Land Acquisition of 491.90.34 Hectares and R&R (Villages Amandera,
Mangrol, Harsani and Nani Pardi etc in Mangrol Taluka of Surat District)
through Land Acquisition Mode:
1. The Contractor shall, on behalf of GIPCL, be responsible for completion of all
pending activities related to land acquisition and R&R of the project affected
peoples (PAPs) wherever applicable and shall facilitate acquisition of all
required private, Government, Gaucher and forest land, free from encumbrances
and encroachments, in a phased manner for mining purposes.
2. All statutory notifications under the applicable Land Acquisition Act(s) shall be
issued in the name of GIPCL, and GIPCL shall remain the owner of the entire
land so acquired.
3. Assistance in valuation of land and assets, liaison with District Administration
and State Government, interaction with Project Affected Persons (PAPs), PAFs,
squatters and forest dwellers, obtaining approvals and clearances, and
facilitation of compensation disbursement shall form an integral part of the
Contractor’s scope.
4. The Contractor shall undertake continuous liaison, coordination and follow-up
with all concerned authorities for securing existing as well as future approvals,
permissions and clearances.
5. GIPCL shall extend necessary support in issuance of applications and
notifications; however, responsibility for processing and completion of
acquisition, including forest diversion, road diversion and allied matters, shall
rest with the Contractor.
6. The Contractor shall be responsible for assisting GIPCL in obtaining and
maintaining physical possession of land, free from encumbrances and
encroachments, for mining and associated activities in compliance with the
Land Acquisition Act.
7. The documented compensation cost of land shall be borne and paid by GIPCL.
All other expenses, resources, logistics and facilitation costs associated with
Gujarat Industries Power Company Limited
land acquisition shall be borne by the Contractor. The Contractor shall assist
GIPCL in disbursement of such payments.
8. Payments to Government authorities shall be made directly by GIPCL.
Payments to other beneficiaries shall also be made by GIPCL by cheque in the
name of the beneficiaries. No additional payment or service charge shall be
payable to the Contractor for land acquisition activities.
9. Without prejudice to the above, the Contractor’s responsibilities shall include
assistance to GIPCL in:
a) arranging revenue plans of land proposed for acquisition;
b) digitization and preparation of combined land plans;
c) preparation of land schedules and certification from the Circle Office;
d) obtaining consent of PAPs/Gram Sabha, wherever required
e) submission of applications to District Collector and liaison with State
Government, District authorities and Revenue Department under
relevant statutory provisions;
f) asset valuation, issuance of notices, preparation and approval of awards;
g) follow-up for compensation disbursement; and
h) physical possession, demarcation, pillaring and mutation of land,
wherever required.
i) Implementation of R&R of the project affected peoples wherever
5.2.2.5 GIPCL has already obtained exemption from conducting the Social Impact
Assessment (SIA) vide order dated 13.01.2023. The Contractor shall render
complete cooperation, coordination, and assistance to GIPCL for acquisition of land
admeasuring approximately 491.90.34 hectares located in the villages of Amandera,
Mangrol, Harsani, Nani Pardi and other adjoining villages falling under Mangrol
Taluka of Surat District, through the land acquisition mode as may be prescribed by
the Competent Authority.
Without prejudice to the generality of the above, the Contractor’s scope of
assistance shall include undertaking continuous field coordination; facilitating joint
surveys, measurement, and demarcation; collection, compilation, and verification of
land and revenue records; identification of landowners, occupants and claimants;
preparation and processing of proposals; liaison with Government departments,
revenue authorities, gram panchayats and other stakeholders; arranging and
participating in meetings, public interactions and hearings; and providing all
logistical, infrastructural, and administrative support necessary for expeditious
completion of the land acquisition proceedings.
The Contractor shall deploy adequate and competent manpower for the land
acquisition having appropriate qualification and experience in their domain,
representatives, and resources on a dedicated basis and shall work in close
coordination with GIPCL and the designated authorities. The Contractor shall
promptly address and assist in resolution of objections, claims, and ground-level
issues arising during the process and shall submit periodic progress reports to
Gujarat Industries Power Company Limited
GIPCL in the format and frequency as may be directed.
It is expressly clarified that statutory functions such as issuance of notifications,
approvals, declarations, determination and payment of compensation, and other
legal compliances shall rest solely with GIPCL and/or the concerned Government
Authorities. The Contractor shall not represent, bind, or commit GIPCL in any
manner whatsoever unless specifically authorized through written instructions.
In the event of any delay in land acquisition attributable to failure, inaction,
inadequate deployment of resources, or lack of coordination on the part of the
Contractor, the same shall be deemed a breach of contractual obligation. GIPCL
shall be entitled to take appropriate action including issuance of directions for
corrective measures, recovery of losses and costs, imposition of contractual
remedies, or any other action permissible under the Contract.
Sr. Village Private Government Government Total
No. Name Land (Ha) Land/ Pond Gaucher Land
5.2.2.6 Diversion/Shifting of the part of the Panchayat Road (Mangrol to Moramli)
passing through the Part of the Valia Mining Lease and other Villagers Road,
along the mining lease boundary as proposed in the Lignite Transport Plan
No. 3, for using the part of the existing Panchayat Road land for the lignite
The Contractor shall assist to undertake the diversion and/or shifting of the portion
of the Panchayat Road passing through part of the Valia Mining Lease area, as well
as other village roads located along the mining lease boundary, in accordance with
the proposed in the Lignite Transport Plan No. 3. The purpose of such
diversion/shifting is to enable utilization of the existing Panchayat Road land for
transportation of lignite, subject to acquisition of the required land and R&R. The
Contractor shall also carry out and complete all ancillary, incidental, statutory, and
regulatory activities necessary for the diversion and/or shifting of the said road(s)
for the ligte transportation after LAQ.
All expenses payable to the Government Agencies, towards the re-routing/diversion
of the portion of the Panchayat Road (Mangrol to Moramli) passing through part of
the Valia Mining Lease area and lignite transportation road, as well as other
villagers’ roads along the mining lease boundary, shall be borne by GIPCL.
However, the Contractor shall provide necessary assistance, coordination, and
Gujarat Industries Power Company Limited
support for obtaining requisite approvals, permissions, and clearances and for
facilitating the re-routing/diversion of the aforesaid roads from the concerned
5.2.2.7 Shifting of 11 KV Electric Lines and Telephone Cables/Poles:
Upon acquisition of the balance land and R&R as stipulated and required under the
Tender Document, the Contractor shall assist to divert or arrange for diversion of
the 11 kV power transmission lines and the telephone cables/poles located within
the Mine area, along the alignment of the diverted portion of the Panchayat Road.
All expenses payable to the Government Agencies, towards the shifting of 11 kV
electrical lines and telephone cables/poles shall be borne by GIPCL. However, the
Contractor shall provide necessary assistance and coordination for obtaining
requisite approvals and for the re-routing of the aforesaid utilities from the
concerned authorities.
5.2.2.8 Shifting of Underground Water Pipeline:
Upon acquisition of the balance land and R&R as stipulated and required under the
Tender Document, the Contractor shall assist to divert or arrange for diversion of
the underground water pipeline located within the Mine area, along the alignment of
the diverted portion of the Panchayat Road.
All expenses payable to the Government Agencies, towards the shifting of
Underground Water Pipeline shall be borne by GIPCL. However, the Contractor
shall provide necessary assistance and coordination for obtaining requisite
approvals and for the re-routing of the aforesaid utilities from the concerned
5.2.2.9 Exploratory Drilling:
The Contractor shall, in consultation with GIPCL, engage an exploration agency
authorized by the Ministry of Coal for carrying out exploration and preparation of
the Geological Report. The Contractor shall undertake confirmatory exploration
activities in the area admeasuring approximately 491.90.34 hectares after
completion of land acquisition.
Exploration shall be carried out through drilling of boreholes on a grid pattern of
250m×250m, or as otherwise directed by GIPCL based on geological requirements.
The terminal depth of each borehole shall ordinarily be 150 metres or upto the
contact with Deccan Trap/ Basalt, whichever is encountered earlier. However,
GIPCL reserves the right to increase or decrease the depth of any borehole
depending on site conditions and exploration objectives.
The Contractor shall prepare a comprehensive Geological Report in conformity
with the formats, guidelines and practices generally adopted by CMPDI /CCO
/Ministry of Coal and acceptable to the Ministry of Coal. The Contractor shall
obtain approval of the Geological Report from the Ministry of Coal /CCO
/CMPDI, as applicable, and no additional claim whatsoever shall be entertained on
5.2.2.10 Allied & Preparatory and Lighting Works:
Gujarat Industries Power Company Limited
A. Land for Site Facilities:
a. In case the contractor needs to construct or create Site facilities, GIPCL
shall provide appropriate land free of cost, during the contract within the
mine lease area subject to the availability of Land.
b. If the gram panchayat demand /issue a notice of Vera/other taxes for
any construction , including camp , contractor has to pay for that.
c. The existing site of camp will be shifted by the contractor as per instructions
of GIPCL officials within the lease hold area. The contractor will not have
any dispute with this however, contractor may arrange a private land for the
camp on their own cost & Risk.
B. Mine Illumination:
a. All safety precautions stipulated as per the provisions of Occupational
Safety, Health and Working Condition Code, 2020, Mines Rules, CMR-
2017 and other applicable mining statutes and circulars issued under them
shall be complied during maintenance of HEMM’s in workshop.
b. The Contractor shall ensure that standards of illumination arrangements at
the Valia Lignite Mine shall be maintained as per DGMS (LEGIS.)
CIRCULAR NO. 02 OF 2017, DATED 06/11/2017. The Illumination
arrangement shall be Power efficient.
c. The mine lighting should be designed and installed with proper lamps and
fixtures in regard to height, orientation, spacing and reflectors or other
accessories, so as to secure a uniform distribution of light on the work area
for visual comfort and avoiding objectionable shadows, sharp contracts of
intensity, glare, light clutter (excessive groupings of light) and light
pollution to prevent strain on the eyes of the workmen, work fatigue and
medically defined stress.
d. Illumination level shall be maintained with the help of minimum 4 Nos. of
High Mast Tower (Minimum 22-meter Tower Height with 12 Nos. x 2 x
400-Watt lighting fixtures) at feeder breaker site/ Transport truck loading
area, Two Sub-Stations & Pit entry main junction. All Haul Road (in-
between lignite working pit, lignite Crusher site and OB/IB dump yard shall
be illuminated with the help of minimum 11-meter Pole Height having 250-
Watt lighting fixtures. The distance between two subsequent poles shall
not be more than 30 meter and maximum 100 meter from the High
Mast Tower. Further, additional lighting arrangement shall have to be
made to achieve illumination standard as per DGMS (LEGIS.)
CIRCULAR NO. 02 OF 2017, DATED 06/11/2017.
e. For this purpose, contractor will have to deploy at least one shiftable
lighting tower (preferably of reputed manufacturer such as Sigma/
Bajaj/Kalinga etc) having 8-10 fittings (400*2-watt rectangular fitting or
800-1000-watt elliptical fitting flood light) at each & every working area /
face (OB working area, Lignite loading area and dump area. These towers
should have both the facility of DG set operation as well as electrical
Gujarat Industries Power Company Limited
f. These towers shall have all required protective devices like ELCB/ELR.
Minimum no of such towers required for the illumination will be 12 & will
be additional to single pole lights to maintain desired lighting standards.
Lighting transformers will have to be installed as per the requirement for
g. The contractor shall be responsible to construct and maintain at his cost
proper and adequate fencing, lighting guarding and taking necessary safety
measures for all works under the contract as may be necessary or guided by
the Mines Manager. The contractor shall arrange to provide lighting in the
active pit and working area as per statute.
h. The power and light connections, wiring, equipment etc. shall be maintained
by the contractor throughout the contract period and till GIPCL take over
the physical possession of the work site at the end of the contract period.
The power and light connection, wiring, equipment, and other installations
shall be subject to the inspection and passing by the Mines Manager or other
authorized official and the authorities of Central Government under the
Electricity Act & Indian Electricity Rules, subject to conditions of
electricity supply by the State Electricity Authorities, or any act or law
applicable with changes suggested from time to time.
i. In case of any additions and alterations in any electrical installations within
their working area whether at surface or within mines, the same shall be
approved and certified by electrical inspector from DGMS. Contractor shall
facilitate in getting any permission from statutory authority.
j. In the Lignite transport road (Within the proposed pit area of Valia Mine
premises), where Lignite transportation trucks ply, the adequate lighting
shall be provided by contractor by providing poles at a distance of not more
than 30 meters. Due to Long distance/length of road, there may be Voltage
drop. Hence contractor shall make adequate arrangements at its own cost for
step up of voltage to provide adequate illumination in Lignite transport
k. Portable lighting shall be provided at places, where the permanent/fixed
lighting is not possible.
l. The Contractor shall install 440/220V Ph to Ph Transformer for Mine
Lighting as per CMR 2017 and DGMS circulars issued in this regard. The
lighting transformers shall have all required protective devices like
m. The Contractor shall install and maintain its Electrical Installation, approved
by DGMS Electrical Inspector and as per Central Electricity Authority
(Measures Relating of Safety and Electric Supply) Regulation
C. Electricity Supply:
a. The Contractor shall make own arrangement to Maintain Power Factor for
its electrical installation as per DGVCL Norms.
b. Presently, Three phase HT Electricity supply (at least 750 KVA of
Gujarat Industries Power Company Limited
Maximum demand with metering arrangements) is available by GIPCL at
one location for lighting, pumping, Feeder Breaker, etc. Further distribution
of power will have to be arranged by the Contractor at its own risk and cost.
Due to larger size of mine, there may be voltage drop. To overcome with
this, the Contractor shall be required to establish an additional 1500 kVA
substation on the deep side of the Mine, having equipments, transformers,
Cables relays and other ancillary equipments of standard make as required
by Statutory provisions. However, contractor may take appropriate alternate
option in compliance with statutory provisions at his own cost & risk. After
the installation of New 1500 kVA substation on dip side of the Mine Pit, the
existing load at this point will be appropriately reduced.
c. Provision of New HT Power Supply Connection: In order to address the
issue of voltage drop and the frequent shifting of the HT cable, GIPCL shall
facilitate in the establishment of a new 750 KVA (Maximum Demand) HT
power supply connection from DGVCL at the dip-side location, i.e., in/near
Harsani Village, where the CT-PT metering point is proposed. GIPCL shall
initiate the application process in advance, considering that the laying of the
overhead line may require considerable time. All statutory charges payable
to DGVCL, including the security deposit and other applicable fees, shall be
borne by GIPCL. However, all other incidental expenses, including
liaisoning charges for expediting the overhead line laying work, shall be
borne by the Contractor.
Contractor shall, at its own cost and risk, extend the power supply from the
CT-PT metering point upto the 1500 kVA substation by laying an
underground HT cable and/or overhead HT line, including all associated
materials, works, approvals, testing and commissioning and shall be
responsible for operation, maintenance and statutory compliance of the
downstream electrical infrastructure within its scope.
The installation, erection, testing, and commissioning of the 1500 kVA or
any other suitable substation shall be carried out and certified by a
competent Electrical Certifying Authority. Drawings for erection of the
substation shall be provided by GIPCL in accordance with the CEA
All equipment installed in the 1500 kVA substation or any other suitable
substation shall be of standard and reputed make, such as L&T, ABB, or
equivalent. Detailed technical specifications of all such equipment shall be
provided by GIPCL.
For round-the-clock supervision and inspection of the 1500 kVA substation,
the Contractor shall deploy one electrician (minimum ITI qualification) per
shift in accordance with the provisions of the CEA Regulations,
Accordingly, the Contractor shall provide a minimum of four electricians
Gujarat Industries Power Company Limited
(ITI qualified) to cover all three shifts, including one reliever.
The Contractor shall possess a valid Electrical Contractor’s Licence issued
by the State Government and shall be fully responsible for compliance with
the CEA Regulations, 2023. This shall include, but not be limited to,
conducting all periodic testing, adhering to prescribed inspection protocols,
and obtaining as well as submitting all necessary approvals, test reports, and
certifications from the Electrical Inspector or other competent authorities, as
d. The contractor shall also have to liaison with DGMS officials for getting
permission of substation.
e. Power consumption will be metered and GIPCL shall pay for the actual
electricity bill for pumping, mud pumping and illumination of mine
working/ dump/ haul road including Lignite transport road. Hence the
Electricity cost for pumping & illumination will not be included in the
mining cost. Any penalty levied on account of not maintaining PF will
be recovered from the Contractor. However, the cost of substation
(Installed by Contractor), all lighting towers, poles fixtures, cables &
protective devices including installation & shifting for the purpose of
pumping and illumination of mine working/dump/haul road including
Lignite transport road will be in the scope of contractor. However, the
Contractor will be free to make its own independent arrangements. If the
Contractor changes the location of its Feeder Breaker, pumping stations, or
any other electrical apparatus, camp Site or workshop that requires shifting
of the supply /metering point will made only if the Contractor agrees to bear
the additional cost likely to be incurred. Necessary further distribution to
ensure required illumination over the area will be made by the contractor at
his risk and cost.
f. The Contractor shall ensure that all safety devices, as stipulated in the
Indian Electricity Rules are provided and are always in operation,
while organizing distribution of power.
g. The electricity bill for the Contractor Camp, Workshop & other
premise of contractor will be paid by the Contractor. For this purpose,
Power consumption will be metered and charged at the prevailing rate
h. No Claim on GIPCL is admissible in case of non-availability of power
i. Non-availability or less than adequate supply of power will not form any
grounds whatsoever for disruption of work and GIPCL shall not entertain
any claim on that account. If at any time during the currency of the contract
any illegal connection and/ or unauthorized connection are found, the
Contractor shall pay the penalty as assessed by the DGVCL, and that will be
final and binding to the Contractor. Any kind of penalty will not be
reimbursed by GIPCL
5.2.2.11 Construction & Maintenance of Roads, Footpaths, etc.:
Gujarat Industries Power Company Limited
1. The contractor will be responsible at its own cost and expenses for construction
and maintenance of haul roads and lignite transportation roads within the
mining pit and within the 15 year mine pit area and also to take up repair &
maintenance, as shown in the attached Plan (Annexure-2) as & when required.
The haul roads and lignite transport road, wherever required shall be
constructed to allow uninterrupted movement of trucks for loading of lignite
having alignments and specifications approved by GIPCL. After acquisition of
approximately 491.90.34 hectares of land, the proposed diverted lignite
transportation road shall be constructed and maintained by GIPCL.
2. GIPCL reserves full rights to use such roads, which are, constructed by the
contractor without any liability whatsoever devolving on GIPCL.
3. Water for dust suppression, cleaning, drinking etc., shall be arranged by the
Contractor at its own cost and expenses.
4. The contractor shall make arrangements at its own cost & expenses for
sprinkling of water on outside road of about 1.2 km length, where the road is
unfinished and is a part of the District Panchayat road.
5. Cleaning of any spillage of lignite en-route of State Highway or Panchayat
Road/ GIPCL road and washing of the affected part of the road will be the sole
responsibility of contractor.
6. Manual cleaning of public road leading from Mosali chokdi to railway line if
required will be the responsibility of contractor.
7. The contractor may transport the Lignite by any other route at their own cost &
8. The contractor shall make arrangements at its own cost & expenses for
sprinkling of water on haul roads, mining faces, dump yards, etc. and take
adequate precautions for dust suppression.
9. To ensure the uninterrupted supply of Lignite through public road, contractor
shall liaison with public/ local leadership/ Government Officials, however.,
GIPCL will also take adequate steps if required for the above purpose.
10. Wherever, the village roads come under active mining/lignite transportation
route, the contractor shall provide an alternate pathway at a safe distance after
necessary documentation as required and away from mining operation/village
roads as per requirements at his own cost. Again, re-routing of the village road
is also under the scope of Contractor at his own cost.
11. Diversion of Nallah/ Drains is also under the scope of Contractor at his own
cost after getting necessary approval if any required.
5.2.2.12 Special Conditions of Work:
1. The Contractor shall exercise due care to excavate lignite cleanly and without
any intermixing with OB/ IB material. Similarly, care shall be taken by the
Contractor to avoid mixing of lignite with overburden/ Interburden or stones.
Contractor will ensure that stones are separated and removed at all stages of
lignite loading, crushing/ breaking/ sizing and re-loading the sized lignite.
2. The Contractor shall maintain, at no extra cost to GIPCL, an in-pit rolling
inventory of in situ lignite (over lain by thin OB) to the tune of approximately
next two months of lignite production during contract period.
3. The GIPCL may direct the Contractor to increase / decrease the level of lignite
Gujarat Industries Power Company Limited
production during any period in accordance with the demand.
4. Modifications in the enclosed plans and sections governing working of the
Contractor shall be carried out at the discretion of GIPCL to suit the actual
conditions revealed during the course of operations and to meet exigencies of
work without any compensation to the Contractor.
5.2.2.13 Statutory Obligations:
1. All the directives issued by DGMS from time to time, shall be binding upon the
Contractor. The violations pointed out by DGMS during their visit shall be
complied by contractor.
2. The removal of Overburden/ earth excavation shall have to be done by the
contractor by preparing benches, from top to bottom, as per provisions of the
Occupational Safety, Health and Working Condition Code, 2020/ Rules/
Regulations and orders made there under & in force from time to time/
Scientific Study, by deploying mechanical equipment viz. Hydraulic Excavators
/ Shovels/ Dumpers, Drill, Dozers etc.
3. Contractor has to comply the Recommendations of 11th & 12th National
Conference on Safety in Mines as listed under:
a. Prepare written Safe Operating Procedure (SOP) for the work to be
carried out, including an assessment of risk, wherever possible and safe
methods to deal with it/them.
b. Provide a copy of the SOP to the person designated by the mine owner
who shall be supervising the Contractor’s work.
c. Keep an upto date SOP and provide a copy of changes to a person
designated by the mine owner.
d. Ensure that all work is carried out in accordance with the Statute and
SOP and for the purpose he may deploy adequate qualified and
competent personnel for the purpose of carrying out the job in a safe
e. For work of a specified scope/nature, develop and provide to the mine
owner a site-specific code of practice.
f. Ensure that all sub-Contractors hired by him comply with the same
requirement as the Contractor himself and shall be liable for ensuring
compliance all safety laws by the sub-Contractors.
g. All persons (including lignite truck drivers & helpers) deployed by the
Contractor for working in a mine must undergo vocational training,
initial medical examination, PME. They should be issued cards stating
the name of the Contractor and the work and its validity period,
indicating status of VT & IME.
h. Every person deployed by the Contractor in a mine must wear safety
gadgets to be provided by the Contractor. If Contractor is unable to
provide, owner/agent/manager of the mine shall provide the same at the
cost of the Contractor.
i. The Contractor shall submit to DGMS returns indicating – Name of his
firm, Registration number, Name and address of person heading the
firm, Nature of work, type of deployment of work persons, Number of
work persons deployed, how many work persons hold VT Certificate,
Gujarat Industries Power Company Limited
how many work persons undergone IME and type of medical coverage
given to the work persons. The return shall be submitted quarterly (by
10th of April, July, October & January) for contracts of more than one
year. However, for contracts of less than one year, returns shall be
submitted monthly.
4. The Contractor shall be responsible for arranging requisite manpower, its
training and medical examination and shall also fulfil the provisions of Mining
and Labour laws, PF Act and Rules, Contract Labour Laws, the workmen
compensation Act etc., pertaining to employment of labour and other statutes in
force from time to time.
5. The Contractor shall comply with the provisions of the Occupational Safety,
Health and Working Conditions Code, 2020 (OSH Code), and all rules,
regulations, notifications, amendments and orders issued thereunder, and shall
indemnify and keep indemnified GIPCL against any penalties, prosecutions,
fines, damages or losses arising out of or resulting from any non-compliance by
the Contractor.
6. The Contractor will be required to obtain License from the office of the Labour
Commissioner for the required strength of labour, before commencement of
work at site and the same shall be maintained updated and valid throughout the
currency of the contract.
7. If any amount becomes payable by GIPCL as a result of any claim or
application in terms of the provisions or non-compliance of provision of the any
Acts and the Rules and Regulations, Bylaws or the Orders made there under, or
the safety codes applicable from time to time, such amounts shall be recoverable
from the contractor for which GIPCL will not be responsible for any
8. The Contractor shall also indemnify the GIPCL against any claims,
compensations, damages, loss, liquidated damages etc. for breach and / or non-
fulfilment of the prevailing Rules and Regulations and other statutory
provisions in force from time to time and applicable to the work during the
currency of contract.
9. The Contractor will provide air-conditioners in the operators’ cabin at his cost
10. The Contractor(s) will also arrange for IME and PME and shall comply other
statutory provisions of Law.
11. The contactor shall have liaison with DGMS officials, Coal Controller and
Officials from MoEF&CC/ GPCB. The contractor shall assist for revalidation
of EC of Mangrol-Valia from MoEF&CC.
12. Contractor shall on behalf of GIPCL, construct, maintain and operate as per
approved DGMS Circulars, DGMS Plans and DGMS Drawings at the approved
sites for First Aid Station, latrines, urinals and portable four numbers of rest
shelters of at least 10 X 10 Square Feet size etc, as required under various
statutory provisions within three months from the date of agreement & shall
maintain those properly.
13. The Contractor shall have the Oil & Grease trap, settling pond at various sites
directed by GIPCL officials ,arrangement for collection of Waste oil and shall
Gujarat Industries Power Company Limited
comply with other terms & conditions of EC. The silting/settling ponds shall
be fenced properly to prevent the unauthorized entry.
14. In case of any Central/State Government directives regarding mining operation /
and execution of work related thereto, the same shall have to be strictly adhered
to and binding upon the contractor for implementation, for which GIPCL will
not be responsible for any compensation.
15. The Contractor shall abide by the provision of the Motor Vehicle Act for all his
machinery. Any consequences arising out of non-compliance of said Provisions
will be at the contractor sole risk and cost, for which GIPCL will not be
responsible for any compensation.
5.2.2.14 Digital Intervention:
Contractor must comply with the following digitalization standards as per the
recommendations of 12th National Conference on Safety in Mines:
a. Recommendation Clause No. 3.1.1: Details of every Initial Periodical Medical
Examinations conducted, and Initial Refresher Vocational training provided to
persons employed in mine(s) are to be uploaded onto an appropriately designed
Digital platform on a non-editable mode and also linked to the individual's
Aadhaar Number so as to be amenable for quick retrieval and for portability
wherever repaired.
b. Recommendation Clause No.3.1.2: The register of employees in Form-A are to
be maintained in Digital form along with Digital linkage to details in non-
editable form of Initial Periodical Medical Examinations conducted. Initial/
Refresher Vocational training provided and individual's Aadhaar number for
every entry made therein.
c. Recommendation Clause No.3.1.3: Biometric Attendance System for the
purpose of booking attendance of all persons employed in the mine(s) is to be
provided at locations as may be fixed by the Mine Manager in writing to ensure
that only persons with entry in the Digitized Form A register of employment as
mentioned above can book attendance for entry into the mine(s). Entries made
in the Biometric Attendance system' shall be retained permanently and shall be
easily amenable for quick retrieval when required. Whenever possible Aadhar
number based Biometric Attendance system' shall be implemented for booking
attendance. The GIPCL official shall have access to the biometric
attendance of all employees deployed in mine by contractor.
d. Recommendation Clause No.3.2.2: Every deployed machinery is accompanied
by a digitally generated pre-deployment fitness certification duly signed by the
concerned mine official.
e. Recommendation Clause No.3.2.4: In respect of operation of such machinery
comprehensive Digitized system shall be developed for:
1) Recommendation Clause No.3.2.4.1: Making available the details of
actual deployment to the shift officials within 15 minutes of the
commencement of the shift working hours.
2) Recommendation Clause No.3.2.4.2: Initial examinations of such
machinery by the engaged operator as per check-lists formulated in
accordance with DGMS guidelines, OEM stipulations, etc, and entering
Gujarat Industries Power Company Limited
the findings through Digital kiosks/tools
3) Recommendation Clause No.3.2.4.3: Dissemination of the report of such
initial examination to all concerned officials as may be decided by the
Manager for ascertaining safe operating conditions of the machinery.
4) Recommendation Clause No.3.2.4.4: Regular maintenance at stipulated
intervals as per OEM stipulations/other guidelines and entering of
records thereof in the Digital history sheet of the machinery.
5) Recommendation Clause No.3.2.4.5: Making all information digitally
available to all concerned mine officials.
f. f. Recommendation Clause No.3.2.5: A system of Digital tracking of all
transportation machinery while in operation within the mine boundary shall be
g. Recommendation Clause No.3.3.1: Reporting by the engaged machine
operators, technicians, supervisors and statutory officials in non-editable form
so as to be amenable for immediate scrutiny by concerned persons at multiple
levels in the management hierarchy.
h. Contractor must also deploy digital system to track deployment of machines
through suitable fleet management systems to track live deployment of fleet,
sensors for diesel/fuel consumptions, sensors/meters for tracking availability
and utilization of equipment (using activity sensors), monitoring of machine
movement, lead, production and productivity of each machine and any other
KPIs as required by GIPCL.
i. Contractor shall also be liable to provide all the data and information from
Digital systems deployed on equipment to GIPCL on periodic basis in a format
compatible to integration with GIPCL’s own data management system.
j. It is clarified that GIPCL reserves the right to deploy its own Digital tracking
systems for equipment/ fleet over and above the basic requirement from
Contractor, if necessary.
k. In case Contractor does not comply with the Digital Intervention requirements
as per clause above, GIPCL will install the system at the risk and cost of the
contractor and cost incurred for the same shall be recovered from the RA bill of
contractor or from any dues available with GIPCL.
l. Change in law: Nothing in this contract shall entitle the contractor to claim
additional payment against the work executed or being executed or likely to be
executed upon the change in law by Government of India or State of Gujarat as
regards any taxes, liabilities arising out of work contract, judgments of court etc.
That nothing under the said laws shall create any additional liability on the
GIPCL over and above that set out herein. That unforeseen circumstances in the
working of the said contract shall not entitle contractor to abandon or demand
additional payment under a different head not originally mentioned here in and
hence nothing except what is contained in the present contract shall constitute
binding obligations between parties.
m. Interpretation: That no communication preceding or following the present
tender shall have any bearing on the terms and conditions set out here in. That
no contract, promise or obligation shall arise out of the said communication,
over and above what is set out there in below. That the terms contained here in
Gujarat Industries Power Company Limited
constitute the entire bargain between the parties and shall not be interpreted in
the light of commercial correspondence between the parties.
n. Since, the use of mobile phones in the mine is prohibited. Hence, the
contractor’s supervisors shall use the Walkie Talky sets for the communication
in the mine area.
5.2.2.15 Dewatering & Pumping:
1. The Contractor shall make its own arrangements for pumping out water from
the pit at no extra cost to GIPCL, except electricity charges. Adequate
arrangements for preventing surface rainwater in-rush into the pit shall also be
made by the Contractor. Subsurface water will be taken care by pumping at
Contractor’s cost.
2. Considering average rainfall and catchment area, pumping arrangements will
have to be made by the Contractor at its own cost & expenses. Contractor shall
install sufficient nos. of pumps having capacity of around 2500 M3/Hr with
suitable head, along with all necessary accessories including pipes, cables,
panels etc. to discharge the water upto desired location at pit top.
Notwithstanding above, the contractor has to make sufficient arrangements for
dewatering of ground seepage water and monsoon water accumulated in the pit
as directed by the mine manager. The capacity of pumps shall be such that most
of the accumulated water shall be pumped out during monsoon or latest by end
of the December every year, leaving only small quantity of water required for
sprinkling and plantation purpose. In case of failure or inadequate arrangement
for dewatering, GIPCL shall carry out such activity by own arrangement or by
deploying other agency.
3. In case of any unprecedented situation, if water gets accumulated inside the pit
beyond the existing pumping capacity, pumping capacity is required to be
increased by the contractor at his own cost. In case of lack of electric power,
DG Set of suitable capacity may also be installed by the contractor at his own
cost, for the purpose of completing the dewatering in the given timeline.
4. Adequate drainage arrangements by installing suitable capacity pumps with
Energy Efficient Motor and pipe lines and construction of sump/ sumps will be
made by the Contractor at his cost for drainage of subsurface and rain water
within the pit and outside the pit upto the disposal Site. Disposal Site will be on
the Western side of the pit and discharge point will be decided by the GIPCL.
5. However, the discharge point will be within the mining lease area only.
Necessary ground water data should be properly looked in to by the Contractor
at his/ its end; It will be the sole responsibility of the Contractor to keep the pit
dry so to ensure uninterrupted mining operation, irrespective of quantum &
quality of water that is encountered in the course of execution of the Contract.
The disposal of water, as & when made will be keeping in view the
environmental laws & other relevant aspects. The cost of pumping of water &
mud handling (Excluding electricity bill) is to be included in the offered
turnkey lignite mining Rate.
6. The Contractor will make necessary arrangements for advance dewatering to
keep its face dry & safe in the Mine if required.
7. Further, about 2.50 Lakh CuM, estimated quantity of mud in liquid /
Gujarat Industries Power Company Limited
semiliquid conditions may formed during rainy season of every year &
accumulated at the bottom of Sump. However, above quantity may vary by +/-
10.00%. The contractor shall remove/ handle accumulated mud in whatsoever
form with the help of Dumper-shovel combination/ pumped out by suitable mud
pumps or by combination of both to make the bottom of Sump dry. Further any
dump material which’s in semi solid form/ wet and accumulated at the bottom
of sump has also to be removed from the bottom of Sump to make the Sump
bottom dry & Clean. Mud accumulated in the previous years will also to be
handled by the contractor in the first operating year.
8. The handling of mud/ handling of semi solid material accumulated at the
bottom of the sump has to be completed not later than by month of March of
every year so that in pit dump stability can be ensured by back filling of OB/IB/
9. Contractor shall be responsible for dewatering of accumulated pit water during
monsoon period itself by maintaining PH of water nearby 6.50-8.00 with
appropriate method. Contractor shall prepare the sump in such a way that the
quality of accumulated rainwater does not deteriorate and the water should
remain of good quality so that it can be discharged safely. The pumping station
should be approachable in all weather conditions. Proper discharge of
accumulated water shall be under the scope of contractor by maintaining good
relationship with locality.
10. When it is not possible to pump out the mine water by electric pumps, necessary
diesel pump shall be installed to pump out the water from mine area.
5.2.2.16 Measures against fires & spontaneous heating of lignite:
1. All equipment operating in the mine and at workshop must be provided with
Automatic fire extinguishers as per the requirement of law. The firefighting
equipment so provided should be periodically inspected and maintained in
working order. A bound-paged book shall be maintained giving details and
location of all fire extinguishers along with dates of inspections and conditions
2. Contractor shall have a fire tender to deal with fire
3. Prevention, suppression and dealing with spontaneous heating/ fire in mine
working area of Valia lignite mine, dump or any other place under its control.
DGMS safety instructions shall be followed from time to time.
4. Contractor shall not uncover and keep the lignite faces exposed for a long time
to prevent spontaneous heating of Lignite. A thin layer of OB/IB shall be left
over the exposed lignite benches. This OB/IB layer should be removed at the
time of extraction and loading of lignite. Spontaneous heating and fires in
lignite stocks should be controlled by proper stacking and compaction by the
5. At Diesel filling station installed by Contractor in his camp and all precautions
as required under law for prevention of fire & unauthorized entry shall be taken
care by the Contractor. The arrangement of adequate firefighting apparatus/
equipments and taking approval from Petroleum & Explosive Safety
Organisation (PESO) shall be under the scope of contractor.
5.2.2.17 Quality Control of lignite:
Gujarat Industries Power Company Limited
1. The Contractor shall exercise due care to excavate lignite clearly and without
any inter mixing with overburden / Interburden material/ Stones. It should be
clearly understood that prime objects of raising lignite is to feed it to the power
plant, located at an approximate weighted average distance from Valia Mine
feeder breaker or lignite handling plant to SLPP Power Plant is approximately
16.50 km (One-way weighted average), for power generations. Consistency in
quantity & quality on day to day basis in supply of sized lignite (-250 mm) to
power plant is to be ensured by the Contractor.
2. Before start of a particular month the Contractor shall carry out seam sampling
to know the quality of Lignite and the following quality parameters shall be
supplied to GIPCL:
Sr. No. Parameter Specified Value
1 GCV (ARB) Minimum 2776.74 Kcal/kg
2 Ash Content (ARB) Maximum 7.91%
3 Total Moisture (ARB) Maximum 50.81%
4 Size of Lignite -250 mm
For Lignite having quality lower than as stated above, the Contractor shall
arrange for blending with higher grade Lignite to ensure for the following
range of quality parameters shall be supplied to GIPCL i.e. minimum GCV
(ARB) of 2776.74 Kcal/ kg with maximum Ash Content (ARB) of 7.91% and
maximum Moisture Content (ARB) of 50.81%.
3. The quality of lignite shall be determined by drawing Lignite samples at/ near
the Delivery Points by GIPCL’s laboratory. The method of sample collection
viz either by auto-sampler or manually, and the frequency of random sampling
will be determined by GIPCL. The representative sample will be divided in to
two Parts. First Part of the sample shall be tested at GIPCL’s laboratory and the
results furnished by GIPCL’s laboratory shall be final and binding on the
Contractor for the purposes of this Agreement. The Second part of the above
said sample shall be packed and sealed and analyzed only in case of any dispute.
The Contractor will depute his representative for collection and analysis of the
4. The sampling shall be done as per BIS (Bureau of Indian Standard). The
preparation of samples and testing/ analysis of Lignite samples shall be carried
out strictly in accordance with Applicable Standard and Procedures laid down in
BIS-436 (Part-I), (Part-II) & (Part-III).
5. Moisture and Ash shall be determined after equilibrating at 60% (sixty percent)
relative humidity and 40 (forty degrees) temperature as per the relevant clauses
of BIS Specification No. IS: 1350 (Part I) 1984. Determination of Gross
Calorific Value shall be carried out in accordance with procedure laid down in
BIS-1350 (Part II) 1970 or any subsequent revision thereof.
6. GIPCL’s laboratory shall furnish daily and monthly analysis report of Lignite to
7. The aforesaid analysis shall be final and binding. In the event of any dispute, the
second part of the sample shall be analyzed by appointing an independent
Gujarat Industries Power Company Limited
agency jointly by GIPCL and Contractor and this analysis report shall prevail in
case of a difference between the result of the analysis made by GIPCL’s
laboratory and that of joint analysis. The 50% cost of such sampling shall be
borne by the contractor.
5.2.3 Mine Design Parameters:
While mining at Valia Lignite Mines, the Contractor shall adhere to the mine design
parameters as approved by DGMS and as detailed out in the below
Sr. Particulars Unit Value
1 Mine Bench Design Parameters
(Operating and Final Both):
1. Bench height Meters
2. Bench width Meters
3. Face Angle 60 Degree
2 Back Filled/In-Pit Dumps:
1. Height of each Lift (upto 30.00 Meters
meter from pit bottom).
2. Width of each Bench (upto 30.00 Meters
meter from pit bottom).
3. Height of each Lift (Above 30.00 Meters
meter from pit bottom).
4. Width of each Bench (Above Meters
30.00 meter from pit bottom)
5. Maximum Height of backfilled Meters
6. Clearance between the toe of Meters 100 Meter
dumps and lignite working face.
1. Width Meter Where practicable, all
roads from the opencast
workings shall be
arranged to provide
one-way traffic. Where
this is not practicable,
no road shall be of a
width less than three
times the width of the
largest vehicle plying
on the road plus 5m
unless, definite turnouts
and waiting points are
Gujarat Industries Power Company Limited
2. Gradient Ratio 1:16
5 Ramp Gradient Ratio 1:10
1. Based on the experience, these parameters may be modified by Contractor in
consultation with GIPCL to ensure the slope stability and higher recovery of the
2. To ensure the safety of the mine, platform/bench of 50.00 Meter width
commencing at 30-meter depth from OGL (SW corner) up to 50.00 Meter
depth from OGL (NW direction) shall be maintained during every year and
will be maintained till the end of 14th year of contract period. During the last
operating year width of this 50.00 Meter Platform/ Bench may be reduced
upto20 meters or as directed by GIPCL officials.
5.2.4 Management of External, In-pit Dump & In-situ benches failures:
1. Contractor shall ensure for the stability of the Working benches and dump
benches. In case of any failure of Working benches and dump benches,
corrective measures shall be taken by the contractor for the stability of the
working benches and dump benches and is comes under the scope of work.
2. In case of any in-situ bench failure, the Contractor shall handle the waste and
the same shall be treated as overburden handling and part of the scope of work.
Contractor will not be entitled to any costs incurred on account of handling of
in-situ OB benches/ collapsed material or on account of recovery of lignite
under such collapsed OB benches.
3. The in-pit dumping will have to be carried out in such a way that chances of
failure/ destabilization are eliminated. After extracting the bottom most lignite
seam, a single bucket drain of about 3.00-meter depth will be constructed along
the mine pit at the interval of every 25 meter before advancing the in-pit dump
over it. The dumping keys between the operating benches and in pit dumps at
appropriate interval will also be plan and implemented for the stability of the
internal dumps. Hard rock/ Stones recovered from the lignite shall be spread ion
the de-coaled area before advancing of in-pit dumping over it. Any re-handling
required in respect of the in-pit dump collapse/sliding will be in the account of
Contractor as a part of the scope of work.
4. Since keeping the internal dump stabilized, throughout the contract period in
general and particularly during monsoon, is one of the key requirements of the
contract, all the steps and cost components should be taken into account while
quoting the lignite mining fees as a part of the scope of work.
5. The overburden/Inter burden, after excavation, shall be transported to dump site
outside/in pit as directed by the GIPCL officials or the authorized persons from
6. In-pit dumping, if required shall be carried out upto ground level along the
ultimate pit boundary by leaving a clear space of 100 mtr between toe of the
backfill dump and toe of the advancing pit bottom bench as per the Scientific
7. Superimposed dumping of 15 mtr height above ground level of in pit dump
shall be carried out as per requirement to accommodate the OB quantity re-
handled from External Dump. Toe of superimposed dump is considered 200 mtr
Gujarat Industries Power Company Limited
away from the crest of backfilled dump upto ground level.
8. Contractors shall have to carry out the unloading of the dumpers, spreading,
dozing and levelling work at the allotted dump/in-pit dump areas.
9. The topsoil shall be spread over final layer dump and if necessary, it will be
stacked separately in the black soil dump or as directed by GIPCL Officials at
any location within lease boundary.
10. OB/IB dumping shall be done as per mine design parameters or as per the
scientific study report, to prevent dump failure. On dumps, the safety berm
should be formed as per the DGMS norms.
11. No edge dumping shall be done and Contractor shall arrange adequate numbers
of dozers for pushing of the dumped material regularly, levelling and
compaction of dumps at all lifts.
12. A berm of at least two meters in height shall be made and maintained at non-
operational area of dumps.
13. In case, the design parameter of mine as stipulated in the tender document
which may be required to be changed on account of ongoing scientific study &
recommendations thereof and/or safety reasons and/or as per the directions of
the statutory authority and/or by management, the Contractor shall have to
undertake the same without any claim whatsoever on account of such changes.
14. Construction and Cleaning of garland drains & silting pond all around the
mine’s workings and dumps, haul roads, truck roads or any other places within
lease area and even outside contract area as directed by the GIPCL Officials
shall be under the scope of contract and shall also be taken every year before
onset of Monsoon as a monsoon preparation work.
5.2.5 Final Dressing:
Final dressing of the bench floors and bench faces shall be done by the Contractor
as per the scope of work and the drawings provided for “End of Year-15” bench
configuration. All over-hangs and loose rocks shall be dressed down and floors be
cleaned up. All haul roads and access roads would be in good condition for further
vehicular movement.
5.2.6 Estimated Quantities of Work:
5.2.6.1 Estimated Quantities of turnkey Mining Contract for Removal of Overburden,
Raising, Crushing & Transportation of -250mm size lignite from Valia Mine to
The following table shows the approximate estimated quantities of for Removal of
Overburden, Raising, Crushing & Transportation of -250mm size lignite from Valia
Mine to Power Plant.
Cumulativ OB: Cumulative
OB/IB Supply of Cumulativ
e OB/IB LIGNIT OB:
Operati Removal Lignite of - e Lignite
Removal E Ratio LIGNITE
ng Year (In 250 mm size Quantity
(In (M3:MT Ratio
MCuM) (In MTe) (In MTe)
MCuM) e) (M3: MTe)
Gujarat Industries Power Company Limited
Note: The lignite supply target from 7th Year onwards are reduced in view of
proposed lignite production from Mangrol Lignite Mine w.e.f. 2031-32. However,
if there is a delay in starting lignite production from Mangrol Mine, the lignite
production targets for 7th year onwards may be revised until lignite production from
Mangrol mine commences.
The tentative monthly production and delivery target of -250 mm size lignite for the
1st Operating Year is as below:
Month Lignite Target Quantity (Lakh Te)
The monthly production/delivery targets of - 250 mm size lignite shall be provided
by GIPCL at least one month prior to the commencement of operating year.
1. The quantity of OB/IB removal and lignite are only indicative/ estimated
figures. As this is a captive lignite mine for Surat Lignite Power Plant, the
actual quantity of OB/IB and lignite will depend solely on the requirement of
the power plant after taking into account lignite availability from Mangrol
Mine. GIPCL shall have sole discretion as to the requirement of lignite for
generation of electricity from time to time. The Contractor has agreed and
understood that the requirement of lignite by Power Plant may vary from time
Gujarat Industries Power Company Limited
to time, to which the Contractors shall not have any objection. Accordingly, the
Contractor shall not be entitled to any compensation or indemnity on account of
increase or decrease in the quantity of OB/IB and lignite. Further GIPCL
reserves the right to increase or decrease the annual quantity in any Operating
Year at any point of time during the Operating Year by giving at least a 30 days
prior notice in writing. The quantity of lignite indicated is ‘in-situ’ and
calculated considering in-situ specific gravity of lignite as 1.16 Tonne/ CuM
for the purpose of this tender.
2. GIPCL reserves the right to make any alteration/ addition in the area for the
contracted quantity as above, without any compensation.
3. In case, the design parameters of the mine as stipulated in the plans enclosed are
required to be changed on account of safety reasons and/or as per the directions
of the statutory authority or as per scientific study or any other un-foreseen
circumstances, the contractor shall have to undertake the same without any
claim whatsoever on account of such changes.
4. After development period, Contractor shall ensure that lignite exposure of about
2 months production equivalent is available at the end of every calendar month
during contract period.
5. Monthly target will be reduced proportionately for the calculation of liquidated
damages only on the submission of certificates from the Mines Manager for the
actual rainy days and its aftereffect during which no lignite mining and
dispatches could be made by the Contractor for the period other than monsoon
period i.e. 15th June to 30th September.
5.2.6.2 Estimated Quantities of OB/ IB Re-handling from External Dump at Valia
The following table shows the approximate estimated quantities for the Re-handling
of the external dump lying on the mineralized zone. The Re-handling of the external
dump will be commenced, just after the commencement of second operating year.
Operating Re-Handling of OB/ IB from External Dump No. 3&4 and 5&6
Year and dumped into the in-pit dump with a dumping height of
upto15.00 metre above ground level (In MCuM)
The quantities of OB/ IB Re-handling from External Dump are estimated figures.
Above mentioned estimated quantities are however, not sacrosanct and actual
figures may vary.
5.2.6.3 Estimated Quantities of Lignite Re-Handling:
The Contractor will carry out entire re-handling of lignite as per activity plan upto
designated delivery points, as may be directed by Site I/c of GIPCL from time to
time with all other activities like dust suppression, maintenance of approach roads
Gujarat Industries Power Company Limited
to lignite stock yard, Stacking, Compacting, Blending of Lignite/ Coal by spreading
in the layers by dozers and leveling & compaction of the slope of lignite or Dome
Shape to prevent spontaneous combustion by the dozer.
Total approximate estimated quantity of Re-Handling of Lignite/ Coal/ Blended
Fuel from Stockyards at various locations as per activity plan during the first two
operating years are as follows:
a) Activity No. 1: -
a. Activity No. 1a: - Re-handling from Lignite Stockyard-1 to In-plant
stock Unit 1&2 as shown in Lignite Re-Handling Plan (Annexure No. 4)
b. Activity No. 1b: - Lignite Stockyard-2 to In-plant stock Unit 1&2, as
shown in Lignite Re-Handling Plan (Annexure No. 4).
Estimated Quantity is about 40000.00 CuM per Year & Average One-
w a y distance is about 3.50 Km.
b) Activity No. 2: -
a. Activity No. 2a:- Re-handling from Lignite Stockyard-1 to Apron
feeder, as shown in Lignite Re-Handling Plan (Annexure No. 4) or
b. Activity No. 2b:- Re-handling from Lignite Stockyard-2 to Vastan
Feeder, as shown in Lignite Re-Handling Plan (Annexure No. 4)
Estimated Quantity is about 50000.00 CuM per Year & Average One-
w a y distance is about 2.10 Km.
c) Activity No. 3: -
a. Activity No. 3a: - Re-handling from Lignite Stockyard-1 to Vastan
Feeder breaker, as shown in Lignite Re-Handling Plan (Annexure No. 4)
b. Activity No. 3b: - Re-handling from Lignite Stockyard-2 to Apron
feeder, as shown in Lignite Re-Handling Plan (Annexure No. 4).
Estimated Quantity is about 33.30 Lakh CuM per Year & Average
One- w a y distance is about 0.5 Km.
d) Activity No. 4: - Re-handling from Lignite Stockyard-1 to In-plant stock Unit
3&4, as shown in Lignite Re-Handling Plan (Annexure No. 4).
Estimated Quantity is about 40000.00 CuM per Year & Average One- w a y
distance is about 2.95 Km.
e) Activity No. 5: - Re-handling from Lignite Stockyard-2 to In-plant stock Unit
3&4, as shown in Lignite Re-Handling Plan (Annexure No. 4).
Gujarat Industries Power Company Limited
Estimated Quantity is about 40000.00 CuM per Year & Average One way
distance is about 1.65 Km.
If the Contractor has not re-handled the specified quantities of lignite under Activity
No. 1, 2, 3, 4 & 5 in the preceding years, and such balance quantities are required to
be re-handled in the current year against the respective activity, the Contractor shall
be obligated to re-handle at least the cumulative quantities specified for each
activity up to that operating year, without any additional cost to GIPCL.
During the subsequent years (i.e., from the 3rd to the 15th operating year) the
Feeder Breaker and/or lignite stockyards presently located near the Feeder Breaker
is likely to be shifted to the vicinity of the Apron Feeder and/or lignite stockyards
near the Apron Feeder at SLPP, hence following activities will be undertaken
a) Activity No. 1: -
a. Activity No. 1b: - Lignite Stockyard-2 to In-plant stock Unit 1&2, as
shown in Lignite Re-Handling Plan (Annexure No. 4).
Estimated Quantity is about 40000.00 CuM per Year & Average One-
w a y distance is about 3.50 Km.
b) Activity No. 3: -
a. Activity No. 3b: - Re-handling from Lignite Stockyard-2 to Apron
feeder, as shown in Lignite Re-Handling Plan (Annexure No. 4).
Estimated Quantity is about 34.20 Lakh CuM per Year & Average
One- w a y distance is about 0.5 Km.
c) Activity No. 5: - Re-handling from Lignite Stockyard-2 to In-plant stock Unit
3&4, as shown in Lignite Re-Handling Plan (Annexure No. 4).
Estimated Quantity is about 40000.00 CuM per Year & Average One way
distance is about 1.65 Km.
If the Contractor has not re-handled the specified quantities of lignite under Activity
No. 1, 3 & 5 in the preceding years, and such balance quantities are required to be
re-handled in the current year against the respective activity, the Contractor shall be
obligated to re-handle at least the cumulative quantities specified for each activity
up to that operating year, without any additional cost to GIPCL.
The quantity of lignite &/ blended fuel re-handled against each activity are only
indicative/ estimated figures. The actual quantity of lignite re-handled will depend
solely on the requirement of the power plant after taking into account lignite
availability from Mangrol Mine and Valia Mine. GIPCL shall have sole discretion
as to the requirement of lignite for generation of electricity from time to time. The
Gujarat Industries Power Company Limited
Contractor has agreed and understood that the requirement of lignite by Power Plant
may vary from time to time, to which the Contractor shall not have any objection.
Accordingly, the Contractor shall not be entitled to any compensation or indemnity
on account of increase or decrease in the quantity of lignite re-handled.
5.2.7 Time for Mobilization, Development of Mine and Completion of the Work
Covered by Contract:
5.2.7.1 1. The period of 30 (Thirty) days from the date of agreement shall be allowed for
mobilization of required manpower, resources and Equipments for the starting
of actual excavation work as per scope of work reckoned from the date of
2. The work shall be executed strictly as per time schedule by deploying adequate
personnel, equipments, tools and tackles. The quantity of OB/IB removal and
lignite are only indicative/ estimated figures. As this is a captive lignite mine for
Surat Lignite Power Plant, the actual quantity of OB/IB and lignite will depend
solely on the requirement of the power plant after taking into account lignite
availability from Mangrol Mine. GIPCL shall have sole discretion as to the
requirement of lignite for generation of electricity from time to time. The
Contractor has agreed and understood that the requirement of lignite by Power
Plant may vary from time to time, to which the Contractors shall not have any
objection. Accordingly, the Contractor shall not be entitled to any
compensation or indemnity on account of increase or decrease in the quantity of
OB/IB and lignite. Further GIPCL reserves the right to increase or decrease the
annual quantity in any Operating Year at any point of time during the Operating
Year by giving at least a 30 days prior notice in writing.
5.2.7.2 The zero-date reckoned for the contract shall be the date of agreement and the
Development Period shall mean the period of 60 (Sixty) days from the effective
date of completion of mobilization period of 30 (Thirty) days for purpose of
development of Mine Pit, excluding the monsoon period from 15th June to 30th
September. However, if the monsoon period extended beyond 30th September, then
the development period shall be adjusted accordingly if required.
Operating Year shall mean a period of 12 months starting from the effective date of
Agreement as certified by GIPCL Management. The subsequent years shall follow
twelve (12) months from the end of Year I (one).
5.2.7.3 If the Contractor desires an extension of time for Mobilization, Development of
Mine and Completion of the Work Covered by Contract on the grounds of his
having been unavoidably hindered in its execution or on any other grounds
whatsoever, he shall apply in writing to the, GIPCL within 10 (ten) days of the date
of the hindrance on account of which he desires such extension as aforesaid, and
GIPCL shall if in its opinion which shall be final and binding on the Contractor,
reasonable grounds exist, authorize such extension of time as may in its opinion be
necessary or proper. Whenever such extension is granted by GIPCL this would be
without prejudice to GIPCL’s right to take appropriate action under this contract
and without any additional financial liability on GIPCL.
5.2.7.4 Failure or delay by GIPCL to hand over the Site to the Contractor necessary for the
executions of the works, or to provide the necessary drawings and instructions or
Gujarat Industries Power Company Limited
any other delay by GIPCL due to any other cause, whatsoever shall in no way affect
or vitiate the contract or alter the character thereof or entitle the Contractor to claim
damages or compensation thereof, provided, however, that GIPCL may at its sole
discretion extend the time for completion of the work by such period as it may
consider necessary or proper.
5.2.7.5 If, for any reason whatsoever, including but not limited to reduced or lesser
requirement of lignite by the power plant, the awarded quantity remains unexecuted
at the expiry of the stipulated Contract Period of fifteen (15) years, GIPCL shall
have the right, at its sole discretion, to extend the Contract Period for a further
duration of upto Six (06) Months. Such extension shall be on the same rates, terms,
and conditions of the existing Contract, without any price escalation, and shall not
require execution of a fresh agreement.
Further, subject to mutual consent of both parties, the Contract Period may be
extended beyond the aforesaid Six (06) Months for a period of upto one year. In
such an event, GIPCL shall issue a revised work order, and the work shall continue
on the existing rates, terms, and conditions.
5.2.7.6 If the Contractor completes the awarded work quantity before completion of the
awarded contract period of fifteen (15) years from the effective date of Agreement,
GIPCL may its sole discretion and with the consent of contractor, award such
additional work quantity as it may deem fit, at the same rates and same terms and
conditions of the contract.
5.2.8 Fitness of Heavy Earth Moving Equipments:-
1. The Contractor will be required to deploy HEMM for mining & transportation
of lignite, which are tested, found fit for roadworthy and shall have all safety
features as required by CMR 2017/ DGMS Circulars/ recommendations of
Mines Safety Conferences.
2. The Contractor will be required to maintain adequate competent officials /
skilled & qualified persons for operation, maintenance, repairs & examinations
of machinery. In addition, GIPCL’s Engineer or other authorized person,
individually or as a joint inspection team, will also examine and verify fitness of
these machineries. The Contractor will provide full co-operation and help in
carrying out these examinations and tests. However, during any such test/
examination, if any machinery is found unfit, the Contractor will forthwith
withdraw it from operation in mine for necessary repair and maintenance and
will not put it back into operation unless it is again examined and certified fit by
GIPCL’s Engineer or other authorized person. Further, the Contractor will be
responsible for substituting the machinery so that works do not suffer.
3. All the equipment to be deployed by the Contractor must be maintained in
proper working order and be fitted with all the required safety devices mandated
by DGMS i.e. Audio-Visual Alarms (IP 67 Compliance), Fatigue Alarm,
Automatic Fire Extinguisher, Proximity Device, Rear View Camera, Anti
Collision Device, Blind Stop Mirrors, Rear View Mirrors and Ergonomic/
vibration Study details and etc. The ergonomic & Vibration study report of
the deployed HEMM shall be provided to GIPCL officials.
4. Before commencement of Mining operation under this contract, HEMM shall be
Gujarat Industries Power Company Limited
inspected by Colliery Engineer. Colliery engineer shall certify that the
a. Dumper has at least but not limited to AC cabin, inbuilt Automatic &
fire suppression system, Rear vision Camera, Proximity device, Fatigue
b. Dozer has at least but not limited to AC cabin and ROPS (Roll Over
Protective Structure/Roof protection and
c. Excavator has at least but not limited to Automatic & fire suppression
system with AC cabins.
d. If HEMM does not have inbuilt Safety features as specified in this
clause, it shall not be allowed to deploy in the mine.
5. Light Vehicles shall be as per RTO Rules. No tractor trailer combination is
allowed. Drivers of Light vehicles shall have a valid driving License.
6. The tools, tackles, machinery, equipment, pump etc. and the manpower required
to execute the contract shall be arranged by the Contractor only. The Contractor
shall at his own expense, furnish all necessary erection tools, hoists, cranes,
derricks cables and slings rigging, skids, welding machines, preheating and
stress relieving equipment all associated protective equipment, instruments,
appliances, materials and supplies required for unloading handling, transporting,
that may be required to accomplish the work under contract unless otherwise
provided for. Adequacy of such will be subject to final determination of GIPCL.
7. The Contractor shall bear and pay all charges on all construction tools and
equipment furnished by him.
8. The Contractor shall deploy a sufficient number of qualified mechanics to carry
out pre-start checks of HEMM in all three shifts. All records of such checks
shall be maintained in bound, paginated registers and shall be produced to
GIPCL officials on demand. The Contractor shall furnish to GIPCL the OEM
guidelines relating to the operation and maintenance of the equipment, including
standard operating procedures (SOPs). The Contractor shall maintain
maintenance schedules and records in accordance with OEM guidelines and
shall produce the same to GIPCL upon demand. The Contractor shall arrange
OEM training for its equipment operators and ensure that only trained and
competent personnel operate the equipment. No subletting, subcontracting or
outsourcing of HEMM operation and/or maintenance shall be permitted without
the prior written approval of the GIPCL mine management.
5.2.9 Method of Work:
5.2.9.1 The plant and equipment deployed by the Contractor and his/its methods and
organizations for handling the work shall be such as will ensure a regular and
continuous production of sized lignite of required quality, which will ensure the
completion of the works within the time herein specified. Further, the work should
be executed strictly in conformity with the provisions of Occupational Safety,
Health and Working Condition Code, 2020, CMR-2017 and all relevant rules,
byelaws and statutory provisions and instructions given by GIPCL and/ or GIPCL
from time to time.
5.2.9.2 The Contractor shall give to GIPCL full information in advance as to his/its plans
and methodology for carrying out the works. If any time before the commencement
or during the progress of work, any part of Contractor’s plant, equipment or
Gujarat Industries Power Company Limited
facilities , or any of his/it method of execution of the work, appears to GIPCL to be
unsafe or inadequate or his/its organization insufficient to ensure the required
quality and rate of progress of work, the GIPCL may order the Contractor to change
or increase and improve his/its plant, equipment facilities, method of work,
organization etc., and the Contractor shall promptly comply with such orders, but
failure/delay of GIPCL to issue such orders shall not relieve the Contractor of
his/its obligation to secure the degree of safety, the quality of work and the rate of
progress required by the Contractor for execution of his/its works under the
contract. The Contractor shall ensure safe operation and maintenance of his plant
During the planned shutdown of power plant, if power plant suspends the intake of
lignite, then GIPCL may also suspend/ reduce raising of lignite by the Contractor.
Similarly, during breakdowns of power plant, raising of lignite can be suspended/
reduced by GIPCL, however, other works like removal of OB etc, may be kept
continued. No compensation on this account (suspension/reduction of raising of
lignite) shall be admissible to the Contractor.
5.2.9.3 The equipments which are brought to the Site shall not be removed from the Mine
without permission in writing of the GIPCL.
5.2.9.4 GIPCL shall not be liable to pay for any damage and/ or compensation for idling of
any of the equipment, and/or manpower for any reason whatsoever.
5.2.9.5 The Contractor shall submit a daily report of work on the following day in a
proforma provided by the GIPCL.
5.2.10 Allotment of Area for Work:
The Contractor shall carry out the work in such areas as may be allotted by GIPCL
from time to time within the mine lease area. The total area, as per the bid drawing,
shall be allotted in phases and not necessarily in entirety at the commencement of
work. GIPCL may, for reasons to be recorded in writing, temporarily suspend work
in any part of the allotted area and direct the Contractor to operate in an alternative
area within the contracted scope.
No claim on account of reduced allotment, stoppage, or change of the work area as
stated above shall be entertained by GIPCL.
5.2.11 Work Personnel:
1. Read with 12th safety conference recommendation, the Contractor shall
maintain and provide records of all his employees entering the mines, in the
register as per the provisions of CMR 2017 and other statutes. These registers
duly maintained and updated should be kept in the office at the mines, so that
the same is available for inspection by any statutory authority.
2. The Contractor shall keep GIPCL indemnified against all the claims and
liabilities of his direct or indirect employees, contracted employees engaged in
respect of this contract, under the applicable Act, rules, regulations and bye laws
as may be in force from time to time during the period of the contract or
otherwise in respect of any claim, damage, compensation etc., whatsoever
payable in consequence of any loss, damage, accident or injury etc. sustained by
these personnel. In the event, GIPCL is required to pay any sum on this account
then the same shall be recoverable from the running bills and /or security
Gujarat Industries Power Company Limited
deposit of the Contractor.
3. The Contractor shall comply with all the statutory provisions as per Central and
/or State Government Act, Rules, Bye-laws, from time to time in regard to the
payment of wages to the workmen employed, wage period, recovery/
deductions from wages, unpaid wages unauthorized deductions made,
maintenance of wage register/ wage slips, publication of the notice of date of
payment of wages, weekly days of rest etc. and other terms of the employment,
and shall submit periodical returns to the statutory authorities. Such records will
also be made available periodically for perusal and scrutiny of the authorized
representative of GIPCL.
4. The Contractor shall have to open Bank accounts of their workers and shall be
required to deposit the wages, advance payment, welfare payments, bonus and
all other payments in their accounts. Contractor’s bill shall be released only
after receiving detailed statement showing name wise wages and all other
payments if any having deposited in the accounts of contractor’s workers.
5. All the staff members and contractor workers of the Contractor shall carry a
Photo Identity Card while on duty.
6. The contractor shall have to work in three shifts (including Lignite
transportation work) and three different relays compulsory (Mandatory). The
time of commencement of work and of the end of the work for each relay will
be in accordance with the timings of GIPCL’s own workings. Duration of each
shift will be Eight hours, with at least half-an hour rest interval in between.
There will be no work on weekly days of rest and on paid/public holidays. This
condition is statutory and shall comply without fail.
7. The Contractor shall provide necessary arrangement for transportation of
manpower from camp site to work site with all the required safety
provisions/devices enforced by DGMS under Occupational Safety, Health and
Working Condition Code, 2020 and other applicable laws/rules or as directed by
GIPCL authority.
8. The contractor shall pay the minimum wages, PF etc. as per the minimum
wages notified by Office of Chief Labour Commissioner, Ministry of Labour &
Employment, Govt. of India time to time.
9. In the event of default of the Contractor in making such payment/s or
contribution for any other reasons GIPCL shall make such payment/
contribution on behalf of the Contractor by way of deducting the relevant
amounts from the running bills of the Contractor and GIPCL shall be entitled to
set off all costs and amounts due to the Contractor for the payment/
contributions made by it on account of Contractor’s default. Till such time the
first running account bill is raised and in case any complaint is received for
nonpayment of wages, the GIPCL after verification may recommend for
deduction of such amount of wages from the security deposit under intimation
to the Contractor. The Contractor shall forthwith make good the shortfall in the
security deposit.
10. The Contractor shall be responsible for the payment of all retrenchment and
other compensation, if any, due and payable to the workmen employed by them.
The Contractor shall provide at his own cost all medical aid and other facilities
Gujarat Industries Power Company Limited
like accommodation, drinking water, rest shelter etc. to their staff as per Mines
5.2.12 Drawings to be supplied by GIPCL:
5.2.12.1 Drawings attached with bid document shall be only for the general guidance of the
Contractor to enable him/it to visualize the type of work contemplated and scope of
work involved. The Contractor will be deemed to have studied the drawings and
formed an idea about the work involved.
5.2.12.2 Any discrepancy between the specifications and the drawings or any error, omission
or ambiguity in the specifications or the drawings shall not invalidate the contract.
The Contractor shall immediately on noticing any such discrepancy, error, omission
or ambiguity brings the same to the notice of the GIPCL. Any work done by the
Contractor even after discovery by him/it of such discrepancy, error, omission or
ambiguity will be at the Contractor’s risk and cost.
5.2.12.3 Any work for which no specification or drawing has been prescribed or issued by
GIPCL are to be carried out by the Contractor in all respects in accordance with the
instructions and requirements of the GIPCL.
5.2.12.4 The drawing/s for the work as listed herein, is based upon the interpretation of
borehole information as per exploration carried out so far by various agencies. The
Contractor shall not be relieved of the liability under the contract for any loss
sustained by the Contractor as a result of any variance between conditions as shown
on the drawings and the actual or otherwise.
5.2.13 Responsibilities for level & alignment:
5.2.13.1 Before commencement of excavation, spot levels shall be taken at 5 meters grid
interval jointly by total station and these levels shall be used for drawing original
ground profile while calculating volume of overburden and lignite removal by
Datamine software/AutoCAD.
5.2.13.2 The Contractor shall be entirely and exclusively responsible for the horizontal and
vertical alignment.
5.2.13.3 It may be necessary at time to discontinue portions of the Contractor’s work in
order that the GIPCL/ Surveyor may make measurements or surveys without
interruptions or other interferences that might impair the accuracy of the results. At
times, on instructions of the GIPCL the Contractor shall discontinue his/its work to
such extent as may be necessary for this purpose.
5.2.14 Right to Review Performance:
GIPCL reserves the right to review and assess the performance of the work at any
time during the contract period. In case of poor or unsatisfactory performance
and/or breach of any terms and conditions of the contract, GIPCL in its absolute
rights and discretion may take appropriate action including termination of the
5.2.15 Risk & Cost:
GIPCL shall have full right to forfeit the whole security deposit and payment of
other pending bills payable to the Contractor for non-fulfillment of the contractual
obligations with regard to the production/ excavation/ transportation of lignite
(work) of specified quantity within the scheduled/specified time period. The work
can be completed by engaging third party at the risk and cost of the Contractor.
Over and above the compensation of shortfall in execution of work, GIPCL may at
Gujarat Industries Power Company Limited
its discretion at any time to get the balance quantity of overall unexecuted work
executed from any other agency at the risk and cost of the Contractor for which an
advance notice of minimum 15 days will be given to the Contractor.
5.2.16 Accident etc. and responsibilities of Contractor:
1. The entire responsibility on account of any accidents, damage or personal injury
which may occur to any of the Contractor’s vehicles/ equipment or his/its
employees or any outside party shall be exclusively that of the Contractor and
no claim whatsoever shall be entertained by GIPCL on this account. The
Contractor shall keep GIPCL indemnified from all such consequence.
2. In the event of any breakdown or accident during the course of any operation,
the Contractor shall notify the facts to the GIPCL or his authorized officer
immediately of such incidence and shall simultaneously make adequate
remedial arrangements on his/its own cost and risk and as per the instructions of
3. The Contractor shall pay all claims, damages, and compensation with cost
arising out of or resulting there from to the third party(s) and in case GIPCL
would be required to face any proceedings or to pay any amount on the
aforesaid account, it shall be deemed to have been discharged on behalf of the
Contractor, who will reimburse the cost/expenses to GIPCL.
5.2.17 Changes in works:
The quantities set out by GIPCL in the excavation schedule or quantities annexed to
contract document are only estimated quantities of work and GIPCL shall not be
bound for any short fall.
5.2.18 Liability to Pay Compensation:
In the event of GIPCL exercising the powers vested in it under the aforesaid clause,
it may, take possession of all or any tools and equipment, materials and stores lying
in or upon the works or the Site thereof belonging to the Contractor or procured by
him and intended to be used for the execution of the work or any part thereof the
same be taken on payment of reasonable compensation as certified by the GIPCL
whose certificate thereof shall be final, otherwise the GIPCL may give notice to
person, requiring him/it to remove such tools, equipment, materials or stores from
the premises (within a time to be specified in such notice), and in the event of the
Contractor failing to comply with such requisition the GIPCL may remove them at
the Contractor’s expenses or sell them by auction and/or private sale on account of
the Contractor and at his/its risk in all respects without any future notice as to the
date, time or place of sale and the certificate of the GIPCL as to the expenses of any
such removal and the amount of the proceeds and expenses of any such sale shall be
final conclusive and binding on the Contractor.
Gujarat Industries Power Company Limited
Payment, Procedure for Measurement & Certificates
6.1 Contractor’s Remuneration:
6.1.1 The Contractor will be eligible to receive its remuneration from GIPCL in respect of
the complete work done by it as per scope of work at contracted rates by GIPCL on
6.1.2 The Contractor shall submit running account bill for the work executed for a period
not less than one calendar month. The running bill shall be signed by the Contractor’s
authorized representative, Production Manager & the Mine Manager. The bill so
prepared and certified will be submitted for payment to the office of the Executive
Director (Mines). Date of such submission of bill will be 5th day after completion of
the calendar month, or the actual date of submission, whichever is later, will be taken
into account for considering due date of payment.
6.1.3 Rate for Turnkey work for Over burden / inter burden removal, Raising,
Producing and Transportation of sized Lignite (-(minus) 250 mm size) to SLPP
1. The Turnkey Lignite Mining Rate includes all expenses as may be incurred by
the Contractor in mining, i.e. Raising of Lignite, Removal of Overburden and
dumping the same at the designated sites, loading of Lignite into dumpers,
transportation from the Lignite face to the Feeder Breaker/ any other mechanical
means/Lignite Handling System, Breaking/ crushing expenses, mud handling,
pumping and maintenance of the fixed infrastructure facilities including all spares
and consumables as well as capital replacement, etc required during the term of
2. The Turnkey Lignite Mining Rate also includes all expenses incurred prior to
lignite production. Turnkey Lignite Mining Rate shall also include cost incurred
towards construction of suitable capacity of feeder breaker (Pit-top) or any other
suitable technology for producing -250 mm size lignite as per the provisions of
Contract. However, the electricity consumed in illumination of mine & mine
working, operation of feeder breaker, pumping of water & handling of mud is
free of cost & will not be included in remuneration paid to contractor. Further, the
Turnkey Lignite Mining Rate shall include all taxes, duties, levies and charges
assessed on the Contractor, its Sub-Contractor’s or their employees by the
authority (ies) except for the elements i.e. GST, surcharge, cess and/or levies
there upon as applicable on direct transaction between Contractor and GIPCL
under this contract shall be paid by GIPCL. During the execution of contract if
any new Tax or Duty is imposed on the Turnkey Lignite Mining Rate, the same
shall be reimbursable to Contractor against the documentary evidence. GIPCL
shall bear royalty, DMF, NMET or its equivalent amount and any other taxes
incidental to extraction and delivery of Lignite as applicable on the Lignite
produced and delivered and make payments in this regard to the concerned
authorities directly.
3. The Contractor will be paid for sized lignite delivered on the basis of its
weighment at GIPCL weighbridges at plant end.
Gujarat Industries Power Company Limited
4. The remuneration to be paid by GIPCL to Contractor for the entire work to be
done and for performing the obligations of this contract agreement by the
Contractor shall be ascertained by applying the awarded rates on the work done
and payment shall be made accordingly as per bid provisions for the work
actually executed and approved by the GIPCL. The sum as ascertained shall
constitute the sole and inclusive remuneration to the Contractor under the
contract and no further or other payment, whatsoever, shall be or become due or
payable to the Contractor under the contract.
5. Contractor should undertake mining in such a way that sized lignite (strictly of -
250 mm size) delivered to SLPP Power Plant is in the range of 2500.00-2837.86
KCal/kg average and more on daily basis. The Calorific Value shall be
determined by GIPCL/ any third party authorized by GIPCL by conducting a test
as per procedure. During the course of extraction of lignite, such quantity of
lignite, which gets mixed with overburden/intercalation resulting in reduction of
Calorific Value or adding to impurities to mined lignite below the cutoff grade,
shall be rejected. This would also include any quantity of lignite rejected at the
power plant end because of supply of inferior quality of lignite. Such rejected
quantities shall neither be considered for remuneration nor achievement against
the contracted quantities. In the case of rejection of lignite as mentioned in
Clause, there will be no recovery on account of the rejection lignite due to
inferior quality of lignite. However, such rejected quantities shall neither be
considered for remuneration nor achievement against the contracted quantities. In
such cases of rejection as mentioned above an amount equivalent to royalty rate,
DMF NMET and any other taxes paid as part of landed rate of lignite at power
plant end as determined by GIPCL, shall be recovered from the running account
bills of the Contractor and/ or from his Security Deposit.
6. The Contractor shall not be eligible to claim any advance payment against
exposed or unexposed stock of lignite.
7. The rate of remuneration to the Contractor shall remain firm & fixed for the
entire contract period & shall not be subject to change except as mentioned
elsewhere in the bid document. No additional payment will be made on
account of mud handling & breaking of Sand Stone/ Hard ground/
weathered rock/ Conglomerate by mechanical or any other mean if found
during the removal of OB/IB/Lignite except as mentioned elsewhere in the
8. The Contractor shall indemnify GIPCL against all actions, proceedings,
claims, damages, costs and expenses arising from the incorporation or use on
the works of any such articles/ processes or materials, other municipal or
local board charges, fees, cess, if levied on materials, equipment or
machinery to be brought to Site for use on work, shall be borne by the
9. The rate of remuneration to the Contractor shall remain firm & fixed for the
entire contract period & shall not be subject to change except as mentioned
elsewhere in the bid document. The Contractor shall be deemed to have known
the nature, scope, magnitude and the extent of the works and material required
though the contract documents may not fully and precisely furnish them. The
Gujarat Industries Power Company Limited
opinion of the GIPCL as to the items of work which are necessary and reasonable
for completion of work shall be final and binding on the Contractor, although the
same may not be shown or described specifically in contract documents.
10. The contract rate shall be deemed to include and cover the risk of all possibilities
of delay and interference with the Contractor’s conduct of work which may occur
from any cause including orders of GIPCL in the exercise of powers and on
account of extension of time granted due to various reasons and for all possible or
probable cause of delay/s in execution of this work.
6.1.4 Rate of OB/IB Re-Handling of the External Dump:
The Contractor will be paid for the quantity of re-handling of OB/IB from external
dumps as per scope of work at awarded rates by GIPCL on monthly basis.
The Contractor will be paid for the quantity of re-handling of OB/IB upto Original
Ground Level (OGL) only.
6.1.5 Rate for Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/
Blended Fuel from Stockyards by using Heavy Earth Moving Equipments:
The Contractor will carry out entire re-handling of lignite as per activity plan upto
designated delivery points, as may be directed by Site I/c of GIPCL from time to time
with all other activities like dust suppression, maintenance of approach roads to
lignite stock yard, Stacking, Compacting, Blending of Lignite/ Coal by spreading in
the layers by dozers and leveling & compaction of the slope of lignite or Dome
Shape to prevent spontaneous combustion by the dozer. But, Contractor has to
mention a single rate for Work No. 3, for the re-handling of lignite for carrying
out the different activities under this head.
The Contractor will be paid for the quantity of Stacking, Compacting, Blending and
Re-Handling of Lignite/ Coal/ Blended Fuel from Stockyards by using Heavy Earth
Moving Equipments as per scope of work at awarded rates by GIPCL on monthly
6.1.6 Turnkey Lignite Mining Rate, Rate of OB/IB Re-Handling of the External
Dump and Lignite Re-Handling Rate and Escalation thereafter:
There shall be no review of the awarded (a) Turnkey Lignite Mining Rate or (b)
Rate of OB/IB Re-Handling of the External Dump or (c) Lignite Re-Handling
Rate payable by GIPCL to the Contractor throughout the term of the contract. All
payments by GIPCL shall be in Indian Rupees only. The Bidder have to carry out all
these works together.
For the purpose of computation of escalation, rate as awarded shall have two
Components of each work at Work No. 1, 2 and 3 as under:
Sr. No. Description Estimated Unit Rate in Amount
Quantity Rs. per in Lakh
(In Lakh Unit Rs.
Work-1 Rate for Turnkey work for Over burden / inter burden removal, Raising,
Producing and Transportation of sized Lignite (-(minus) 250 mm size) to SLPP
Power Plant and other ancillary activities as defined in Section V, Mining-Part II
(Scope of Work & Special Conditions of the Contract):
A Work Component 420.00 Rs./ Te --------
Gujarat Industries Power Company Limited
(Excluding Diesel)
B (i) Diesel Component Litre per Te --------
B (ii) Average Monthly Price of Rs. per Litre
the Diesel (Average out of
Monthly Price of the Diesel
for March, 2026 at PSU
Outlet at Nani Naroli)
B=(i x ii) Diesel Component 420.00 Rs./ Te B(i) x
Sub-Total Rate in Rs./Te (A + B) and Amount
Work-2 Rate for Re-handling of the External Dump and other ancillary activities as
defined in Section V, Mining-Part II (Scope of Work & Special Conditions of the
A Work Component 205.00 Rs./ CuM --------
(Excluding Diesel)
B (i) Diesel Component Litre per CuM --------
B (ii) Average Monthly Price of Rs. per Litre
the Diesel (Average out of
Monthly Price of the Diesel
for March, 2026 at PSU
Outlet at Nani Naroli)
B=(i x ii) Diesel Component 205.00 Rs./ CuM B(i) x
Sub-Total Rate in Rs./CuM (A + B) and Amount
Work-3 Rate for Stacking, Compacting, Blending and Re-Handling of Lignite/ Coal/
Blended Fuel from Lignite Stockyards at various locations throughout the years
(including monsoon period) by using Heavy Earth Moving Equipments and other
ancillary activities as defend in Section V, Mining-Part II (Scope of Work &
Special Conditions of the Contract):
A Work Component 509.48 Rs./ CuM --------
(Excluding Diesel)
B (i) Diesel Component Litre per CuM --------
B (ii) Average Monthly Price of Rs. per Litre
the Diesel (Average out of
Monthly Price of the Diesel
for March, 2026 at PSU
Outlet at Nani Naroli)
B=(i x ii) Diesel Component 509.48 Rs./ CuM B(i) x
Sub-Total Rate in Rs./CuM (A + B) and Amount
Grand Total Amount of Work No.(1), (2) and (3) exclusive of GST
Grand Total Amount of Work No.(1), (2) and (3) exclusive of GST
1. Work Component:
Escalation will be considered on work component on yearly basis @ 1.60% per
annum of the awarded base rate and the escalation will be applicable on yearly
basis from the second operating year onwards. This is applicable to all the three
works as applicable as mentioned above.
2. Diesel Component:
Escalation shall be applicable only on the diesel component of the awarded rate
and shall be calculated based on the variation in diesel price over the Base Price,
Gujarat Industries Power Company Limited
defined as the average monthly diesel price for March, 2026 at the IOCL PSU
retail outlet at Nani Naroli. GIPCL shall compute the simple average of monthly
diesel prices (1st to 30th/31st) at the said outlet, which shall form the basis for
escalation or reduction. No escalation shall be payable on any account other than
diesel price variation.
In exceptional circumstances beyond the Contractor’s control, including but not
limited to war, national emergency, pandemic, supply disruptions, or Government
/ Oil Marketing Companies (OMC) directives mandating Industrial/ bulk diesel
procurement from oil marketing company (OMC) terminals, where the
Contractor is compelled to procure diesel at rates higher than the IOCL PSU
retail price, such cases may be considered under this provision.
Escalation on bulk procurement shall be admissible only upon submission of
documentary evidence of procurement from authorized sources, necessity for
execution of the work, and exclusive consumption under the contract. The
Contractor shall submit supporting documents including tax invoices/e-invoices
and delivery challans corresponding to diesel consumed at the GIPCL site. For
such cases, GIPCL shall compute the simple monthly average of the applicable
diesel prices, which shall form the basis for escalation or reduction, and no
escalation shall be payable on any account other than diesel price variation.
The decision of GIPCL regarding admissibility and extent of escalation shall be
final and binding on the Contractor.
6.1.7 Amount to be Retained /Released on account of Excess/ Less OB Removal:
1. For monitoring the OB removal work corresponding to the exposure of lignite,
the actual stripping ratio will be reviewed every six months. However, first
review will be done after 9 months from the commencement of the work. If the
actual cumulative stripping ratio is less/ more than the tender stripping ratio then
the amount on account of less/ excess stripping ratio shall be worked out and the
same amount will be retained/ released with GIPCL.
2. The retention/ release will be done in whole or part from the succeeding RA Bills
at the rate of 50% of respective payable bill amount till the time the total amount
at the rate of 50% of respective payable bill amount till the time the total amount
in lieu of excess/ less stripping ratio is not retained /release. However, the GST
amount will be reimbursed on an actual basis (Credit Note).
3. The retention / released amount will be progressively retained/ released as soon
as the excess actual cumulative stripping ratio approaches towards the tender
stripping ratio which will be reviewed in the succeeding RA bills as per example.
However, at the end of the contract, retention amount if any, may be released in
the final bill.
4. The value of the Constant shall be considered actual (upto three-digit figure only
after the decimal) for the calculation of the payment of Work Component on
lignite dispatch.
Gujarat Industries Power Company Limited
Illustrative Example is given in Annexure-
6.1.8 Amount to be Retained /Released on account of Land Acquisition:
The Contractor shall render all necessary cooperation, coordination and assistance to
GIPCL in connection with the acquisition of land and implementation of
Rehabilitation and Resettlement (“R&R”) measures in respect of land admeasuring
approximately 491.90.34 hectares situated in the villages of Amandera, Mangrol,
Harsani, Nani Pardi and other adjoining villages falling under Mangrol Taluka of
Surat District. Such acquisition shall be undertaken through the land acquisition
process as may be prescribed or directed by the Competent Authority from time to
The Contractor shall quote the Lignite Mining Fee after taking into account and
including the consideration for providing the aforesaid cooperation, coordination and
assistance in relation to land acquisition and R&R. No separate payment,
reimbursement, compensation or claim of any nature whatsoever shall be payable by
GIPCL to the Contractor on this account.
In the event that the land acquisition and R&R process, up to the stage of possession
of the aforesaid land, is not completed by the end of the third (3rd) Operating Year,
an amount equivalent to Rs.150 (Rupees One Hundred and Fifty only) per tonne of
lignite delivered to GIPCL shall be deducted and retained from the Lignite Mining
Fee payable to the Contractor from each Running Account (RA) Bill on a monthly
basis commencing from the start of the fourth (4th) Operating Year.
The amounts so deducted shall be retained by GIPCL as a performance-linked
withholding towards the Contractor’s obligations relating to assistance in land
acquisition and R&R activities. Such deductions shall continue until the completion
of the seventh (7th) Operating Year or until the entire land admeasuring
approximately 491.90.34 hectares is acquired and possession thereof is taken by
GIPCL, whichever occurs earlier.
Upon completion of acquisition and R&R of the entire land and upon GIPCL taking
possession thereof, the cumulative amount so withheld shall be released to the
Contractor without interest. The Contractor shall not be entitled to seek release of the
withheld amount on a pro-rata, interim or partial basis prior to completion of
acquisition and possession of the entire land.
In the event that advancement of the mine is halted or materially affected due to the
Contractor’s failure to provide the required cooperation, coordination and assistance
in connection with land acquisition and R&R, the cumulative amount withheld under
this clause shall stand forfeited by GIPCL without prejudice to any other rights or
remedies available under the Contract or in law.
6.1.9 Rejection Criteria:
If any of the quality parameters of lignite on any single day are found as below, the
whole quantity of lignite supplied on that day will be considered rejected and lignite
landing cost as determined by GIPCL shall be payable for that day’s lignite supply
Gujarat Industries Power Company Limited
shall be deducted from the RA Bill. It is clarified that the lignite so rejected will be
the property of GIPCL just like any other lignite mined, transported and delivered
from Valia Mine to Power Plant.
1. Total Moisture (ARB) : >55 %
2. Ash Content (ARB) : >10 %
3. GCV (ARB) : < 2500 kcal/ Kg
In case of any of the rejection criteria reported, a representative sample from the
source of supply (in-situ lignite seam) will be collected by GIPCL. If analysis of this
sample shows the inherent quality of the in-situ sample, so collected & analyzed,
conforming to the rejection criteria as above, GIPCL may consider, at its sole
discretion exemption, from invoking of rejection clause.
6.1.10 Adjustment to Remuneration:
1. For the Lignite which meets the specified quality criteria, no adjustments to the
remuneration shall be applicable during the course of this Agreement.
2. The Ash Content (ARB), Total Moisture (ARB) and GCV (ARB) of Lignite
would be checked and compared with the specified values as per Clause No.
5.2.2.17 of Part II/Mining/Scope of Work. Adjustment of the Turnkey Lignite
Mining Rate would be carried out for variation in weighted average quality
parameters as compared to the guaranteed parameter values as per the following
adjustment formula.
a. Ash Content (ARB): On sampling and analysis of Lignite, if the
weighted average Ash content (ARB) in the Lignite supplied during the
month exceeds 7.91%, then for every increase in ash content by 1% on
pro-rata basis, the weight of the Lignite supplied shall be reduced by 1%.
No bonus for ash content (ARB) below 7.91% shall be paid by GIPCL to
b. Total Moisture (ARB): On sampling and analysis, if the weighted
average Total moisture (ARB) in the Lignite supplied during the month
exceeds 50.81%, the weight of Lignite supplied shall be reduced by the
same percentage by which moisture content exceeds 50.81%. However,
no bonus/ adjustment of weight shall be paid for the total moisture content
(ARB) in Lignite is less than 50.81 %.
c. GCV (ARB): On sampling and analysis, if the weighted average Gross
Calorific Value (ARB) of the Lignite supplied during the month is below
the specified value of 2776.74 Kcal/Kg, the Remuneration shall be
adjusted on the entire quantity of the Lignite supplied during the month as
per the formula given below:
Adjusted Rate per tonne = (P X Q) /
P: Effective Turnkey Lignite Mining Rate per tonne for the month.
Gujarat Industries Power Company Limited
Q: Actual GCV value as the monthly weighted average (ARB) as per
analysis and sampling at delivery point for the relevant month.
The calculation of variations in quality parameters set out for Total Moisture (ARB),
Ash Content (ARB) & GCV (ARB) of Lignite shall be done on monthly basis and
adjustments to Remuneration shall be applicable separately for the total quantity of
Lignite supplied during the relevant month.
6.1.11 Liquidated Damages (L.D):
6.1.11.1 Failure on the part of the Contractor to produce lignite within stipulated period (After
60 (Sixty) days from the completion period of 30 (Thirty) days of mobilization
period excluding rainy season if any), or after completion of its extension if any, by
GIPCL, necessitated by delay not caused by or attributable directly to GIPCL,
contractor shall be liable to pay liquidated damages to GIPCL @ Rs. 2.50 Lakh
(Rupees Two Lakh and Fifty Thousand only) for each day of delay in
commencement of productions of Lignite. Payments of damages, aforesaid, shall be
made monthly by the Contractor failing which the same shall be recovered from
Security Deposit Bank Guarantee If the lignite production does not commence within
one months from the expiry date of schedule time of (including its extension if any,
owing to delay on account of the Contractor and / or for reasons not attributable
directly to GIPCL), GIPCL shall have the right to invoke the termination clause. The
Contractor agree that the liquidated damages mentioned herein are genuine pre-
estimates of the damages that may be caused to GIPCL in the events mentioned
above and that payment of such liquidated damages by the Contractor shall be
without prejudice to any other legal remedy that might be available to GIPCL under
6.1.11.2 Failure to Supply Lignite as per Monthly Targets given at Clause No. 5.2.6:
In the event that the Contractor fails to deliver lignite in accordance with the monthly
target quantity specified under Clause 5.2.6, except where such failure is attributable
to Force Majeure or to any act or default on the part of GIPCL, GIPCL shall be
entitled to withhold an amount equivalent to six (6) times (which is approximately
equal to the landing cost of lignite supplied by GMDC from its available mines) the
applicable Turnkey Lignite Mining Rate of the respective month, calculated on the
quantity of lignite shortfall for such month.
For the purpose of this clause, the lignite shortfall quantity shall mean the difference
between the monthly target quantity specified under Clause 5.2.6 and the actual
quantity of lignite delivered by the Contractor and accepted by GIPCL during the
relevant month.
The amount so withheld shall be retained by GIPCL as security against the
Contractor’s failure to meet the monthly lignite supply obligations.
If the Contractor fails to supply the entire shortfall quantity within the same quarter
(April–June, July–September, October–December and January–March), the amount
so withheld shall stand appropriated by GIPCL towards Liquidated Damages (LD),
which shall be recoverable from the Contractor’s Running Account (RA) Bills or any
Gujarat Industries Power Company Limited
other amounts payable to the Contractor under this Contract.
Where such failure to supply lignite results in any energy loss, generation loss,
procurement of alternate fuel, additional fuel cost, or any other operational or
financial loss to GIPCL, GIPCL shall, in addition to the Liquidated Damages, be
entitled to recover the actual loss suffered by it from any amounts due or becoming
due to the Contractor under this Contract or under any other contract with GIPCL.
If the Contractor supplies the entire shortfall quantity within the same quarter and it
is verified that no operational, financial or generation loss has been suffered by
GIPCL on account of such shortfall, GIPCL may, at its sole discretion, release the
amount withheld in the subsequent Running Account Bill.
The determination of lignite shortfall, assessment of losses, and the amount to be
withheld, appropriated or recovered under this clause shall be determined by GIPCL
and such determination shall be final and binding on the Contractor.
Any liquidated damages levied under Clause 6.1.11 shall be recoverable from the
Contractor’s running bills, retention money, or Performance Bank Guarantee, at the
discretion of GIPCL.
6.1.11.3 Liquidated Damages on Shortfall in OB/IB Re-handling Quantity on Monthly
1. The obligation to strictly comply with the specified monthly OB/IB Re-handling
quantity indicated by the GIPCL’s office is fundamental requirement and
obligation of the Contractor.
2. In case of any shortfall for meeting the minimum requirement on monthly target
basis in the OB/IB Re-handling Quantity, the liquidated damages shall be applied
as indicated below :-
a. Up to 5% Shortfall of monthly target - 5.00% of the rate of OB/IB Re-
Handling of the External Dump on shortfall OB/IB Re-handling quantity
on monthly basis.
b. More than 5% and upto10% Shortfall of monthly target- 10.00% of the
rate of OB/IB Re-Handling of the External Dump on shortfall OB/IB
Re-handling quantity on monthly basis.
c. More than 10% and upto20% Shortfall of monthly target – 20.00% of the
rate of OB/IB Re-Handling of the External Dump on shortfall OB/IB
Re-handling quantity on monthly basis.
d. More than 20% Shortfall of monthly target – 30.00% of the rate of OB/IB
Re-Handling of the External Dump on shortfall OB/IB Re-handling
quantity on monthly basis.
GIPCL reserves the right to reduce the monthly target within 7 (Seven) days’ notice.
6.1.11.4 Monsoon Preparation:
In case the Contractor fails to implement the monsoon plan as directed by GIPCL in
Clause No. 5.2.2, GIPCL shall withhold 1% of each RA Bill amount until the work is
Gujarat Industries Power Company Limited
completed. If the same is not completed within 3 (Three) months of the non-
compliance, the work will be completed by GIPCL and LD will be levied at three
times the actual cost incurred as determined by the Mine Manager and the LD will be
recovered from the amount withheld in last three RA Bills and balanced amount will
6.1.11.5 Mine Design Parameters:
In case the Contractor fails to adhere to the mine design parameters specified as per
Clause No. 5.2.3, GIPCL may levy penalty, as below:
Penalty will be 0.50 X Turnkey Lignite Mining Rate for the month x Excess lignite
recovered/ exposed on account of change in the mine design parameters.
6.1.11.6 Dewatering/Pumping & Mud handling:
In case the Contractor fails to provide/ maintain pumping/ dewatering from the Mine
as specified in Clause No. 5.2.2.15, GIPCL shall withhold 2% of each RA Bill
amount until the work is completed. If the same is not completed within 3 (Three)
months of the non-compliance, the work will be completed by GIPCL and LD will be
levied at three times the actual cost incurred as determined by the Mine Manager and
the LD will be recovered from the amount withheld in last three RA Bills and
balanced amount will be released.
In the event the Contractor fails to provide and/or maintain arrangements for mud
handling from the Mine in accordance with the requirements specified under Clause
5.2.2.15, GIPCL shall be entitled to withhold an amount equivalent to five percent
(5%) of each Running Account (RA) Bill commencing from the month of April and
continuing until such time the work is duly completed to the satisfaction of GIPCL.
In case the Contractor fails to complete the said work within a period of two (2)
months, i.e., upto the end of May, the entire amount so withheld shall stand forfeited.
Without prejudice to the above, GIPCL shall further have the right to undertake the
mud handling work either through its own resources or through any third-party
agency. The cost and expenses incurred by GIPCL for carrying out such work, along
with an additional fifteen percent (15%) towards administrative charges, shall be
recoverable from the Contractor and shall be deducted from the RA Bills. For
avoidance of doubt, the amount already withheld shall be adjusted against such
recoveries, and the balance, if any, shall be recovered from subsequent payments due
to the Contractor.
6.1.11.7 Mine Lighting:
1. In case the Contractor fails to provide/ maintain Lighting Towers/ poles/ cables/
Transformers/ Skilled & qualified Manpower (Electrician) as specified in Clause
No. 5.2.2, GIPCL shall withhold 1.0% of each RA Bill amount until the work is
completed. If the same is not completed within 2 (Two) months of the non-
compliance, the work will be completed by GIPCL by deploying any other
agency and LD will be levied at 1.5 times the actual cost incurred as determined
by the Mine Manager and the LD will be recovered from the amount withheld in
last two RA Bills and balanced amount will be released.
2. Contractor has to make sufficient arrangement for Illumination of all working
Gujarat Industries Power Company Limited
places, haul roads, dumps, and other places where persons and machineries are
engaged in the mines etc. as per the standard specified by DGMS, as per CMR
2017 and as directed by the Project authority. In case of failure or inadequate
arrangement for Illumination, GIPCL shall carry out such activity by own
arrangement or by deploying other agency. Liquidated damages shall be leviable
1.5 times the expenditure incurred for the same activity from the Contractor
3. Additionally, if the lighting tower as explained earlier is under breakdown or
more than 50% of the fitting is not working properly for more than 15 days in any
month, a Liquidated damage of Rs 50000/month for each such tower will be
6.1.11.8 Statutory Amenities:
In case the Contractor fails to provide/ maintain Statutory Amenities as specified in
Clause No. 8.5.5 and 5.2.2.13, GIPCL shall withhold 1% of each RA Bill amount
until the work is completed. If the same is not completed within 3 (Three) months of
the non-compliance, the work will be completed by GIPCL and LD will be levied at
three times the actual cost incurred as determined by the Mine Manager and the LD
will be recovered from the amount withheld in last three RA Bills and balanced
amount will be released.
6.1.11.9 Dust Suppression:
In case the Contractor fails in the arrangements for sprinkling of adequate quantity of
water for dust suppression as specified in Clause No. 8.5.6, GIPCL shall deduct LD
of an amount equivalent to three times the cost of providing such dust suppression
6.1.11.10 Lignite Re-handling:
If the Contractor fails to commence re-handling operations within one (1) hour from
the time of instruction issued by GIPCL and/or fails to achieve and maintain the
desired full rated capacity as specified under Clause No. 5.2.2 of the Tender
Document, as directed by GIPCL officials, the Contractor shall be liable to pay
Liquidated Damages (LD) to GIPCL at the rate of ₹10,000/- (Rupees Ten Thousand
only) per day of delay.
6.1.11.11 Penalty for Stones in Lignite:
GIPCL shall deduct penalty of an amount equivalent to 3 (three) times of the turnkey
Lignite Mining Rate of the respective month for the equivalent weight of the large
size stones accumulated during feeding at Apron Feeder/ Vastan Feeder Breaker. In
case of lignite being received from multiple sources, this penalty will be levied on
pro-rata basis.
6.2 Procedure for Measurement/ Billing of Work in- Progress:
6.2.1 As mentioned under Clause No. 5.2.13, before commencement of excavation, spot
levels shall be taken at 10 meters grid interval jointly by total station and these levels
shall be used for drawing original ground profile while calculating volume of
overburden and lignite removal by Datamine software/ AutoCAD.
6.2.2 For Turnkey Lignite Mining work of over burden/ inter burden removal,
Raising, Producing and Transportation of sized Lignite (-(minus) 250 mm size)
a) Measurements of OB / IB removal work shall be made using Total Stations/ 3D
Gujarat Industries Power Company Limited
Laser Scanner. The field readings shall be directly transferred to computer
software for computation of volumes and preparation of plans and sections.
Datamine or any other suitable software shall be used for this purpose. It is
clarified that this measurement is for determination of Stripping Ratio
purpose only and for monitoring the desired mine design Parameters.
However, Contractor has to maintain mine design Parameters as per the
Clause No. 5.2.3.
b) An authorized representative of the Contractor shall remain present at the time of
field measurement and computation work and will also certify the same. The
measurement and the computations provided by the Management shall be final
and binding to the Contractor.
c) Raising & Sizing of Lignite (- 250 mm size): - Initial (Tare) and final (Gross)
weights of all lignite dumpers shall be taken and recorded by computer with
appropriate dedicated software at GIPCL weighbridges. The net weight of Lignite
carried by these dumpers shall be computed through the software and based on
such computer reports, monthly Lignite tonnages delivered shall be worked out
and paid to the Contractor. The payment of the Turnkey Lignite Mining Rate
shall be based on the tonnage of Lignite delivered only (At Plant end).
d) The Contractor will be allowed to depute his representative at the weighbridges
for recording, verification and certification of the weight of Lignite delivered in
dumpers. The measurement and the computation provided by GIPCL shall be
final and binding to the Contractor. An authorized representative of the
Contractor shall remain present at the time of field measurement and computation
work and will also certify the same. The measurement and the computations
provided by the Management shall be final and binding to the Contractor.
e) Transportation of sized Lignite (- 250 mm size) from Valia mine to SLPP Power
Plant as shown in Lignite Transport Plan (Annexure No. 3): - Detailed
measurement Sheets for transportation, weighbridge records showing total
tonnages of transportation of sized Lignite duly certified by the concerned
Engineer at Mines/ Power stations Sites separately.
f) Weighment of the Lignite shall be done at both the weighbridges i.e. Valia
Lignite Mine’s as well as near to SLPP Power Plant as shown in Lignite
Transport Plan (Annexure No. 3) or any other weighbridge at plant side. The
contractor shall be paid only on the basis of lignite mined of specific quality,
loaded into the tipper and weighed on the Valia Lignite Mine’s weighbridge,
transported & unloaded etc. at SLPP Power Plant as shown in Surface Plan
(Annexure No. 2 and 2/A) and Lignite Transport Plan (Annexure No. 3) after
weighment again at weighbridge near SLPP Power Plant or any other
weighbridge at plant side. Weighment of lignite as recorded at the SLPP Power
Plant weighbridge or any other weighbridge at plant side shall be considered and
treated as final for the purpose of this contract. In case any of the weighbridges
near designated lignite delivery point is not in working condition for whatsoever
reason, then the Contractor agrees and undertakes to get the weighment done at
any of the weighbridge as directed by GIPCL. The Contractor shall not raise any
dispute including claim for any extra cost regarding the said authorization of any
such weighbridge on this account by GIPCL.
Gujarat Industries Power Company Limited
g) The difference in weighment between two weighbridges (Valia Lignite Mine’s
and near to SLPP Power Plant or any other weighbridge at plant side) shall be
treated as transit loss. Transit shortage for the transfer of the sized lignite from
Valia Lignite Mine to delivery point shall not be more than 0.15% of the lignite
transported during the month (to be computed from the date of award of
contract). Excess transit loss if any, shall be reconciled and recovered from the
Contractor on monthly basis for which three times the Lignite landing Cost per
tonne shall be considered. The monthly reconciliation of the lignite transportation
quantity shall be done by GIPCL.
h) GIPCL reserves the right to associate third party for carrying out initial, annual
and final excavation survey at regular intervals. GIPCL will have sole discretion
to appoint third party agency like the Geological Survey of India, Indian Bureau
of Mines etc. and the Contractor will be bound by such survey/s.
6.2.3 OB/IB Re-Handling Work (Work No. 2): - Measurements for Re-handling of
Overburden lying in the external OB dumps and re-spreading of the top-soil shall be
made by using Total Stations/ 3D Laser Scanner. The field readings shall be directly
transferred to computer software for computation of volumes and preparation of
plans and sections. Datamine or any other suitable software shall be used for this
purpose. An authorized representative of the Contractor shall remain present at the
time of field measurement and computation work and will also certify the same. The
measurement and the computations provided by the Management shall be final and
binding to the Contractor.
6.2.4 Lignite Re-handling Quantity (Work No. 3): - Measurements of Lignite Re-
handling Quantity work shall be made using Total Stations/ 3D Laser Scanner. The
field readings shall be directly transferred to computer software for computation of
volumes and preparation of plans and sections. Datamine or any other suitable
software shall be used for this purpose. An authorized representative of the
Contractor shall remain present at the time of field measurement and computation
work and will also certify the same. The measurement and the computations provided
by the Management shall be final and binding to the Contractor.
6.3 Billing and Payment:
For obtaining running account payment, the Contractor will submit bill for the work
done in a calendar month as per the methodology given in Clause No. 6.1 and Clause
No. 6.2. The monthly bill should be submitted along with following details:
1) Date wise Weighment statement duly certified by Engineer, showing the tonnage
of Lignite delivered at SLPP Power Plant with summary sheet showing total
tonnage of Lignite delivered during the R.A Bill period.
2) Detailed measurement & computation sheets duly certified by the Surveyor for
the OB/IB work/ lignite work carried under.
3) Detailed measurement & computation sheets duly certified by the Surveyor for
the OB/IB Re-Handling work carried under.
4) Detailed measurement & computation sheets duly certified by the Surveyor for
the Lignite Re-Handling work carried under.
5) Copy of wage payment sheet of the previous month to employees actually
employed by the Contractor at the mines;
Gujarat Industries Power Company Limited
6) Documentary evidence of the P.F. amount deducted from the monthly salary of
the employees of the Contractor actually employed at mines for execution of the
contract and submission of this amount along with Contractor’s contribution to
the P.F. Commissioner, for the previous month.
7) Documentary evidence of the GST deposited of the previous month.
The GIPCL shall verify the bills & quantity of lignite delivered to SLPP Power Plant
during the month and the admissible amount of the bill of the Contractor, will be paid
after making necessary deductions:
1) Income Tax (TDS) as per the provisions of the Income Tax Act in force,
2) 5% of the gross amount of R.A. Bill starting from 1st R.A. Bill as retention
money against performance security deposit (till 5% of the estimated value of
average annual quantity of Lignite raising and transportation @ 3.25 MTe, Re-
handling of the External Dump @ 3.00 MCuM and Stacking, Compacting,
Blending and Re-Handling of Lignite/ Coal/ Blended Fuel from Stockyards @
35.00 Lakh CuM of contract shall be achieved),
3) Amount of LD levied, if any.
4) Amount of adjustment to remuneration rate, if any, other statutory deductions
5) Cost of other material / services provided.
6) Recovery against any damages recoverable under the provisions of this tender.
The running bill shall be signed by the Contractor’s authorized representative,
Surveyor, Production in-charge and Mine Manager of GIPCL. The bill so prepared
and certified will be submitted for payment to the office of the Executive Director
(Mines). Date of such submission of bill will be 5th day after completion of the month
/ period, or the actual date of submission, whichever is later, will be taken into
account for considering due date of payment. The payment of the certified amount of
the Running bills shall be due on 15th day of calendar month or after 10 days of
receipt of the certified Bill, whichever is later.
However, if the Contractor desires in writing and if GIPCL’s financial status permits,
the payment of RA Bills can be made earlier, subject to the condition that the
Contractor will pass on a rebate @ 2% per month on pro-rata basis for actual early
6.4 Running Account Payments to be Regarded as Advance:
All running account payment (progressive payment ) shall be regarded as payments
by way of advance against the final payment only and not as payments for work/s
actually done and completed, and shall preclude the requiring of bad, unsound,
defective, unscientific, imperfect or unskilled work to be removed and taken away
and reconstructed, re-erected or be considered as an admission of the due
performance of the contract, or any part thereof, in this respect, or of the accruing of
any claim by the Contractor, nor shall it conclude, determine or affect in any way the
rights/ powers of GIPCL unless these conditions or any of them as to the final
settlement and adjustments of the accounts or otherwise. The final bill shall be
submitted by the Contractor within one month from the date of physical completion
Gujarat Industries Power Company Limited
of the work; otherwise the GIPCL’s certificate of the measurement and the total
amount payable for the work accordingly shall be final and binding on the
6.5 Receipt of Payment:
Receipt for payment made must be signed by a person duly authorized holding power
of attorney in this respect on behalf of the Contractor. A person so authorized shall be
in exclusive employment of the Contractor and he will not work or engage himself in
any other profession for gain or profit other than the Contractor’s employment. When
the Contractors are described in their bid as a limited company, in which case the
receipts must be signed in the name of the company by one of its principal officers or
by some other persons having been authorized to give effectual receipt of the
company. The payment so made to the authorized person shall deem to be the
payment to the Contractor & no claim whatsoever in this regard will be admissible.
6.6 Provident Fund:
1) The Contractor shall be wholly responsible for complying with the fulfillments of
the provisions of the Employees Provident Fund and Miscellaneous provisions
Act, 1952 including subsequent amendments & notifications, in respect of the
employees engaged for the work.
2) The Contractor shall have to get himself registered with the Regional Provident
Fund Commissioner (RPFC) under the Employees Provident Fund and
Miscellaneous Provisions Act, 1952. Contractor is required to submit the copy of
the PF Registration Number received from RPFC office before starting the work,
failing which the contract is liable to be terminated.
3) However, each running account bill must be submitted along with the name of the
labour/employee deployed for the work, salaries paid to them, amount of PF
deducted from salaries of the labour/employees and employer's contribution,
amount deposited in RPFC office against each labour name and copy of the
challan for the amount deposited in RPFC office till previous month, failing
which no payment will be made for Running Account bill submitted by the
Contractor to the GIPCL. Alternatively, if the intimation of remittance of PF dues
is not received by GIPCL every month then the GIPCL shall be authorized to
deduct a lump sum amount @ 13.61% of the wages bill amount on account of PF,
which shall either be refunded to the Contractor on its furnishing proof that
Contractor has deposited the required amount of PF along with the employer 's
contribution or shall be retained by GIPCL for payment to the Provident Fund
commissioner on its demand, as and when made, under intimation to the
6.7 Withholding Payments to Contractor & Company’s Lien on Moneys due to the
6.7.1 Progressive payments at any time may be withheld or reduced, if, in the opinion of
GIPCL, the Contractor is not diligently and efficiently endeavoring to comply with
the terms of the contract or if the Contractor fails to pay his labour, for material and
other bills as they become due. GIPCL shall in no way be liable for any loss or
damage etc due withholding of such payments.
6.7.2 GIPCL shall have lien on all amounts that may become due and payable to the
Contractor under this or any other contract or transaction of any nature whatsoever
Gujarat Industries Power Company Limited
between GIPCL and the Contractor and the security deposit, bank guarantee etc.
furnished by him/it under the contract for or in respect of any debit or sum that may
become due and payable to GIPCL by the Contractor either alone or jointly with any
other or others either under this or any other contract or transaction of any nature
whatsoever between GIPCL and the Contractor, unless the Contractor pays and clears
the claim in full immediately on demand in cash to GIPCL.
6.8 Application for Completion Certificate:
1) When the contractor fulfills all its obligations under the contract to the
satisfaction of GIPCL and subject to terms and conditions of the contract, it shall
be eligible to apply for completion certificate. The GIPCL shall formally issue
completion certificate within thirty (30) days on receiving application from the
contractor, after verifying from the completion documents including
measurement record etc. and satisfying himself that the work has been completed
in accordance with all the provisions of this contract and as set out in the
drawings / map/ specifications etc. and instructions issued to the contractor by
GIPCL and the DGMS from time to time.
2) The contractor, after obtaining the completion certificate, is eligible to present the
final bill for the works executed by him/it under the contract. The final bill shall
be submitted by the contractor within 3 months from the date of physical
completion of the work, otherwise, the GIPCL’s certificate of the measurement
and of total amount payable for the work accordingly shall be final and binding
and of total amount payable for the work accordingly shall be final and binding
on the contractor.
6.9 Completion Certificate:
Within one month of the completion of the work in all respects as defined in the
contract document, the Contractor shall be required to obtain from the GIPCL such
completion certificates as to the clearing of the areas of all rubbish, dirt, rock
overburden materials, structures etc.
1) If the Contractor fail to comply with the requirement of this Clause No. 6.9 or
before the date fixed for the completion of the work, the GIPCL may at the
expenses of the Contractor remove such rock (overburden) surplus materials and
rubbish and dispose of the same as he thinks fit and clean off such dirt as
aforesaid and the Contractor shall forthwith pay the amount of all such expenses
so incurred and shall have no claim in respect of any such rock (overburden) or
surplus materials as aforesaid except for any sum actually realized by the sale
2) For the purpose of Clause No. 6.9, the following documents are required by
GIPCL subject to the conditions that the GIPCL for his satisfaction, may ask for
any other document for this purpose.
a. The technical documents according to which the work was carried out.
b. Three sets of calculation sheets (back up papers) thereof.
c. Certificate of final levels and slopes.
d. Certificate of the annual quantity of lignite raised and delivered at power plant
and OB/IB re-handling.
e. A certificate to the effect that no outstanding claims/payments are due to the
Gujarat Industries Power Company Limited
persons employed by the Contractor or his Sub-contractor, if permitted by
Company including the statutory payments, which have fallen due.
f. A no claim, no dues certificate.
g. Proof of depositing P.F.
h. Indemnity Bond.
6.10 Final Payment and Release:
Immediately on completion of the work, the Contractor shall submit his final bill
indicating the gross and net amount payable. On receipt of this, GIPCL shall verify
the same, determining the total value of the work done of the contract and after
adjusting all the sums already paid to him/it and/due to GIPCL on any account and
such further sums as GIPCL is already authorized or required to reserve or retain as
per the terms of the contract or otherwise, make over to the contract as his/its final
6.10.1 All prior certificates, quantities, claims etc. upon which running account payments
may have been made, shall be subject to adjustment in the subsequent/ final bill,
Final Certificate/ payment.
6.10.2 GIPCL shall not be liable to pay any money to the Contractor, except as specifically
provided for in the contract. Acceptance by the Contractor of the final payment as
aforesaid shall operate as estoppels and shall be, a release to GIPCL from all claims
and liability to the Contractor in respect of anything done or furnished by the
Contractor for or in relation to the work, or in respect of any act GIPCL or any other
person relating to or effecting the work.
6.10.3 Final payment including the security deposit, if any, will be released to the
Contractor after issuance of Final Certificate.
6.11 Final Certificate:
Upon expiry of the period of liability and subject to the GIPCL being satisfied with
the work or works having been duly performed by the Contractor and the Contractor
having fulfilled all his obligations under the contract, Executive Director (Mines)
shall give a certificate hereinafter referred to as the 'Final Certificate' and the
Contractor shall not be considered to have fulfilled all of his obligations under the
contract until Final Certificate shall have been given by the GIPCL. The issuance of
Final Certificate would mean closure of contract and no claim, of whatsoever
nature, of either party shall be tenable.
Gujarat Industries Power Company Limited
Suspension, Subletting, Termination, Force-Majeure & Dispute Resolution
7.1 Sub-Letting of Work:
The entire scope of work under this Contract shall be executed by the Contractor,
except for lignite transportation, and the Contractor shall not, directly or indirectly,
assign, transfer, sublet, subcontract or otherwise part with the Contract or any part
thereof, or any interest therein, without the prior written consent of GIPCL.
Any assignment, transfer, subletting or subcontracting without such consent shall
constitute a material breach of the Contract and shall entitle GIPCL to terminate the
Contract at the risk, cost and consequences of the Contractor, without prejudice to
any other rights or remedies available to GIPCL under the Contract or applicable law.
Notwithstanding any approval granted by GIPCL for subletting or subcontracting any
part of the work, the Contractor shall remain solely and fully responsible for the due
performance of the Contract and for all acts, omissions, defaults and negligence of its
subcontractors, as if they were the acts, omissions, defaults and negligence of the
Contractor itself.
7.2 Power of Entry:
If the Contractor shall not commence the work as specified herein or achieve the
scheduled progress as per the contract or if he shall at any time, in the opinion of the
1) Fail to carry on the contract works in conformity with the contract terms and
2) Fail to carry on the works in accordance with the contract schedule; or
3) Suspend the work or the works without prior written permission of the GIPCL; or
4) Fail to deploy or procure sufficient equipment, manpower, materials and other
store items; or
5) Commit breach of contract or act in a manner which is against the commercial
interest of GIPCL.
6) If the Contractor abandons the works; or
7) If the Contractor during the continuance of the contract shall become bankrupt,
make such arrangements with his/its creditors or compromises or go into
liquidation / dissolution, whether compulsory or voluntary (not being merely
voluntary liquidation for the purpose of amalgamation or reconstruction, then in
any of above mentioned circumstances, GIPCL shall have the power to enter
upon the works and take possession thereof and of the materials, equipment, tools
and stock etc. thereon and to complete the incomplete / leftover works by other
Contractor or workmen, or to re-let the same upon any terms and to such other
person/ firm/company at the risk & cost of Contractor, as GIPCL in its absolute
discretion may think it proper.
As a consequence of it, GIPCL shall be authorized to use any materials, temporary
Gujarat Industries Power Company Limited
works, equipment, tools, and stock etc. as aforesaid without making payment or
allowance to the Contractor for the said use of materials & other such facilities In
case of any deficiency, it shall forthwith be made good and paid to GIPCL by the
Contractor and GIPCL shall have power to sell in such manner and for such price as
it may think fit all or any of the equipment, tools, material s etc constructed by or
belonging to and to recoup and retain the said deficiency of any part thereof out of
the proceeds of the sale.
7.3 Power to Order Suspension of Work:
GIPCL can, in writing and without prejudice to the provisions of contract direct the
Contractor to suspend the entire work or any part thereof. After such directions, the
Contractor shall not proceed with any work or part thereof. In such circumstances,
GIPCL may under the provision of the contract extend the time for completion of
work or part thereof by such period, as it may think reasonable. The decision shall be
final and binding on the Contractor. The Contractor shall not be entitled for any extra
payment as compensation in case of such suspension of the work.
7.4 Termination:
Contract shall be liable to be terminated on default or failure by the Contractor of any
of the obligations of the Contractor under the contract, including but not limited to :
7.4.1 Failure to start the work within 30 (Thirty) days of handing over the job Site to the
7.4.2 Failure on the part of the Contractor to produce lignite within stipulated period.
Failure in erection and commissioning of appropriate capacity of feeder breaker or
Mobile feeder breaker or any other suitable system, 120 days from the date of issue
7.4.3 Management reserves the right to terminate the contract and/ or get the balance work
completed at the risk and cost of the Contractor if Cumulative shortfall from target is
more than 25% during three consecutive months / RA bill periods.
7.4.4 Failure to provide at each job Site sufficient equipment, labour, material, machinery
temporary works and /or facilities required for the proper execution of the work or
any part thereof.
7.4.5 Failure to execute the works or any of them in accordance with the contract, which
will also include refusal or failure to supply equipment on demand for essential
development and/or other ancillary works or works related to removal of dangers for
safety of men and machines in the mine.
7.4.6 Disobedience of any order or instruction of the GIPCL and or GIPCL’s
representative and consultants.
7.4.7 Negligence in carrying out the works and not following GIPCL’s instructions for
execution of work or carrying out any work found to be unsatisfactory by GIPCL.
7.4.8 Abandonment of the works or any part thereof.
7.4.9 Substantial suspension of the works or any part thereof for a period of 07 (Seven)
days or more without the prior written permission of GIPCL.
7.4.10 Breach of any of the terms, conditions or provisions of the contract on the part of
7.4.11 Failure to deposit the initial performance security within 15 (Fifteen) days of receipt
of Letter of Intent / Work Order.
7.4.12 Failure to execute the works or any of them in accordance with the provisions of
Gujarat Industries Power Company Limited
Occupational Safety, Health and Working Condition Code, 2020, and CMR
Mines Rules 1955, IER 1956, etc.
7.4.13 Continued violation of safety norms and of Acts and Laws applicable to the works.
7.4.14 If the Contractor is incapable of carrying out the work and / or failure to achieve the
laid down targets.
7.4.15 If the Contractor misconducts himself in any manner;
7.4.16 If there is any change in the constitution of the Contractor, or in the circumstances or
organization of the Contractor, which is detrimental to the interests of GIPCL.
7.4.17 Dissolution of the Contractor (if a Firm) or commencement of liquidation or
winding-up (whether voluntary or compulsory) of the Contractor (if a Company) or
appointment of a receiver or GIPCL of any of the Contractor’s assets and/or
insolvency of the Contractor (if a proprietorship) or of any partner of the Contractor
7.4.18 Distress, execution or other legal process being levied on or upon any of the
Contractor’s goods and assets;
7.4.19 Death of Contractor (if an individual);
7.4.20 If upon any change in the partnership/constitution of a Contractor’s organization (if a
Partnership) and GIPCL refuses to continue the contract with the reconstituted firm;
7.4.21 If the Contractor or any person employed by him shall make or offer for any purpose
connected with the contract any gift, gratuity, royalty, commission, gratification or
other inducement (whether money or in any other form) to any employee or agent of
7.4.22 If the Contractor shall assign or attempt to assign his interest or any part thereof in
the contract without GIPCL’s prior consent in writing.
7.5 The decision of the Managing Director of GIPCL, as to whether any of the
events/contingencies mentioned in Clause No. 7.4 of SECTION-VII hereof entitling
GIPCL to terminate the Contract, has occurred or not, shall be final and binding
upon the Contractor.
7.6 The 45 (Forty-Five) days advance notice of termination, in writing shall set forth in
addition to a statement of the reason or reasons for terminating of the contract, the
time(s) and place(s) for conducting a survey and measurement of the work performed
under the contract upto the date of termination for the purpose of determining the
final amount(s) if due to the Contractor therefore. The reason (s) for the termination
stated in notice of termination shall be final and binding upon the Contractor without
any reservation or demur whatsoever.
7.7 Within 7 (Seven) days of completion of the measurements, the contractor shall clear
the job Site of all equipment, machinery and labour and shall demolish, dismantle
and remove all Contractor’s Site office and vacate the quarter and other temporary
work; structures and construction and things whatsoever brought upon or erected at
the job Site or on any land allotted to the contractor by GIPCL and not incorporated
in the payment works and shall remove all the rubbish from the job Site and the land
allotted to Contractor and shall clear, level and dress the job Site and said land to the
satisfaction of the GIPCL /GIPCL’s representative and shall put GIPCL in the
undisputed custody and possession of the job Site and all any land allotted by GIPCL
to the contractor.
7.8 The Contractor, with whom the contract has been terminated under Clause No.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Valia Tender_2026.pdf
Annexure-1.pdf
ANNEXURE-2.pdf
ANNEXURE-2A.pdf
ANNEXURE-2B.pdf
ANNEXURE-3.pdf
Annexure-4.pdf
Annexure-5.pdf
Annexure-6.pdf
Annexure-7.pdf
Annexure-8.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .