Executive Engineer, Panchayat (R&B) Division, Tapi
Reti Kankar 2025-26 Const. Of Samajik Shed at Village Panchol Ta.Dolvan Dist.Tapi.
272374
26 OF 2025-26
Open
Civil Works - Buildings
Works
Tapi
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹9,000
Yes
3 Feb 2026
3 Feb 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
Name of Work:-Reti kankar Yojna 2025-26. Cons. Of Samajik Shed @ Village Panchol, Ta.Dolvan
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) Figures
1 Boring holes 1.20 m deep in ordinary soil (for cast in 8.00 Nos 1561.19
situ piles) and getting out the soil and disposal of the
surplus excavated soil as directed within a lead of
Meter for following diameter of pipes.(iii) 300 mm
2 Providing and laying controlled cement concrete M-200 0.85 Cum. 4649.51
for R.C.C. bored piles of 1.20 Mt. diameter including
ramming, vibrating, curing and finishing complete
3 Filling in foundation and plinth with murrum or selected 29.15 Cum. 296.30
soil in layers of 20cm thickness including watering
ramming and consolidating etc. complete
4 Providing and laying controlled cement concrete M.200 3.35 Cum. 8871.33
and curing complete excluding the cost of formwork
and reinforcement for reinforced concrete work in (D)
Columns, Pillars posts and struts upto floor two level.
5 Providing and laying controlled cement concrete M.200 5.47 Cum. 6375.70
and curing complete excluding the cost of formwork
and reinforcement for reinforced concrete work in (C)
Slabs, landing, shelves, Balconies Lintels, Beams,
Girders and Cantilever upto floor two level
6 Providing and laying cement concrete 1:2:4 (1- 16.20 Cum. 3786.47
Cement : 2- Coarse sand : 4- graded stone aggregates
20 mm nominal size) and curing complete excluding
cost of formwork in (A) Foundation and Plinth (more
7 Brick work using common burnt clay building brick 12.90 Cum. 4121.55
having crushing strength not less than 35 kg/sq. cm. in
foundation and plinth in cement mortar 1:6 ( 1 Cement:
6 fine sand) (B) Convention
8 Providng TMT bars renforcement of FE 500/500D for 2600.92 kg 77.29
R.C.C. work including bending binding and placing in
position complete for all floor.
9 Steel work, welded in built up sections framed work 13.60 Qui 9908.67
including cutting, hoisting, fixing in position and
applying a priming coat of red lead paint. (D) In
trussses and trussed purlins, upto 25 M. span and
M. ovarall height.
10 Providing corrugated G.I. sheet of class-3 roofing 158.75 Sqmt 734.19
fixed with glavanished iron J or L Hooks, Bolts and
nuts 8mm diameter with bitumen and G.I. limpet
washer or G.I. limpet washer. filled with white lead
complete excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
11 Providing 20mm thick cement plaster in single coat on 129.20 Sqmt 238.41
single or half brick walls for interior plastering upto
floor two level and finished even and smooth in (iii)
Cement mortar 1:6 (1- cement:6-sand)
12 Providing and laying polished Kota stone slab flooring 109.90 Sqmt 1015.82
over 20mm (Average) thick base of cement mortar 1:6
(1-cement : 6-coarse sand) or L.M. 1.1.5 (1-Lime putty
:1.5 - coarse sand) laid over and jointed with grey
cement slurry mixed with pigment to match the shade
of slab including rubbing and polishing etc. complete.
13 Finishing wall with water proofing cement paint of on 129.20 Sqmt 117.41
wall surface ( Two coats) to give an approved brand
manufacture and of requred shape even shade after
throughtly brushing of loose powered materials.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by the
Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt G.R.:
PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where the reisa change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD_ Panchol Shed.pdf
BOQ_ Panchol Shed.pdf
Specification_Panchol Shed.pdf
GRs - SBD with Index.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .