MD, WBMDFC
AMBER DD 27E Sect 1 Salt Lake City Kolkata 700064
Emergent repairing by grouting to tiles joint walls floors at the basement the HQ office building of WBMDFC at Salt lake Sector1 Kol64
2026_MDFC_1038593_1
ERGWFB-1 of 2026-27
Open Tender
CIVIL WORKS
Percentage
AMBER DD 27E Sect 1 Salt Lake City Kolkata 7000
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Glazed tiles with acid . | 120 | sqm | 11.92 | ₹1,430.4 |
| 2 | Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy | 122 | each | 121.56 | ₹14,830.32 |
| 3 | Sealing of cracks / porous concrete by injection process through nipples/Grouting complete as per Technical specification. A Cement Grout . 80 % of Grouting considered as Epoxy Grouting @ 3.00kg/nipple | 311 | kg | 69.64 | ₹21,658.04 |
| 4 | Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1 . 20 % of Grouting considered as Epoxy Grouting @ 2.00kg/nipple | 37 | kg | 1,051.16 | ₹38,892.92 |
| 5 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @
0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (i) Coloured decorative . | 8 | SQM | 1,313.87 | ₹10,510.96 |
| 6 | Toilet floor joint treatment . Initially total tiles joint will be cut by 2-3 mm gap and then start pouring splash solution two round, after that filling polymer solution with her help of injection grout, lastly epoxy grouting will be done by three components solution up to finished level including drainage outlet pipes sprout work . | 120 | sqm | 690 | ₹82,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.41 MB
BOQ_2551323.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].