| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | ₹37.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹38.4 L+₹1.0 L (2.80%)Rejected-Finance VILLAGE SIVIAN DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | ₹38.4 L+₹1.0 L (2.80%) | L2 | Rejected-Finance due to higher rate |
| Sl No | Description | Qty | Unit | EVERGREEN EARTH MOVERS L2 | DHILWAN CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | (6.6) Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding
2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 135.91 | Cum | 191 ₹25,958.81 Lowest | 201 ₹27,317.91 |
| 2.00 | Dag Belling single kassi stroke minimum 7.5 cm depth. | 2.66 | km | 848 ₹2,255.68 Lowest | 848 ₹2,255.68 Lowest |
| 3.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 4,907.57 | Cum | 39 ₹1,68,772.5 | 37 ₹1,60,117.5 Lowest |
| 4.00 | (24) Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary
road :- Discharge upto 1.5 cum/s | 2.66 | km | 1,869 ₹4,971.54 Lowest | 1,869 ₹4,971.54 Lowest |
| 5.00 | Dismantling brick work tile, masonry or tile lining In cement. | 820.81 | Cum | 761 ₹6,24,636.41 Lowest | 761 ₹6,24,636.41 Lowest |
| 6.00 | (10.11) Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type. | 10.4 | Cum | 4,533 ₹47,143.2 Lowest | 4,669 ₹48,557.6 |
| 7.00 | (10.20) Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 1.9 | Cum | 6,891 ₹13,092.9 Lowest | 7,098 ₹13,486.2 |
| 8.00 | (10.13) Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type. | 393.02 | Cum | 6,162 ₹4,65,415.86 | 5,874 ₹4,43,663.22 Lowest |
| 9.00 | (10.12) Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type. | 0.38 | Cum | 4,844 ₹1,840.72 Lowest | 4,844 ₹1,840.72 Lowest |
| 10.00 | (10.35) Preparing watering and ramming surface for laying concrete Channels (irrigation) Horizontal | 2,662.43 | Sq.Mtr | 6,948 ₹4,45,783.68 Lowest | 7,018 ₹4,50,274.88 |
Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
18 Feb 2026, 10:00 amClosed
Executive Engineer
executive engineer bathinda canal and ground division bathinda
ESTIMATE FOR LAYING PIPELINE OF BILASPUR MINOR FROM RD 23100-31835
2026_WR_159227_1
55/22A/2025-26
Open Tender
Civil Works - Canal
Item Rate
Raikot
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.6 L
bathinda
17 Apr 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
10 Feb 2026
(6.6) Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Dag Belling single kassi stroke minimum 7.5 cm depth.
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
(24) Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :- Discharge upto 1.5 cum/s
Dismantling brick work tile, masonry or tile lining In cement.
(10.11) Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type.
(10.20) Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.
(10.13) Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type.
(10.12) Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type.
(10.35) Preparing watering and ramming surface for laying concrete Channels (irrigation) Horizontal
(1 1.9) First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth
Centering and Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
(18.18) Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
(18.4) Wrought iron & Mild steel ladders, framed grills, gratings etc. with ends of bars riveted or molded forged framed window guards, barred iron doors stair case iron railing etc. including cost of bolts and nuts, screws, welding rod complete fixing in position
Providing orange colour safety footrest of minimum 6mm thick plastic encapsulated as per IS:10910 on 12mm dia steel bar confirming to IS: 1786 having minimun cross section as 23mm x 25mm and over all minimum length 263mm and width as 165mm with minimum 112mm space between protruted legs having 2mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specification and having manufacturers permanent identification mark to be visible even after fixing, including fixing in manholes with 230x150x75cm cement concrete block 1:2:4 (1 cement: 2 sand: 4 stone aggragate) complete as per design.
(16.54) Painting distance marks with synthetic enamel paint Two coat work Distributaries
(19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads excluding royality.
Re-handling of Earthwork recently executed.
(15.6) 10mm thick Cement Plaster 1:4
(15.38) 10mm thick cement plaster 1 : 4 on floors.
Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 (@ 2.5m / No).
Lowering, jointing of RCC NP-2 plain end pipes 700 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With H more than 0.5 m. but upto 0.9 m.
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry With H more than 0.5 m. but upto 0.9 m
(20.1) Extra labour for dressing bricks On O.F. And A.P.M. type outlets With H more than 0.5 m but upto 0.9 m.
DEPARTMENT OF WATER RESOURCES
Name and Address of Contractor / L&C Society
Contact No.
Landline No.
Mobile No.
Name and Address of Banker
Income Tax Return for any one of the last three years
Approximate value of work in hand
Bank solvency certificate
Certificate of "……." Class/Society registeredwith irrigation Deptt.
DEPARTMENT OF WATER RESOURCES
Name of the Contractor / L&C Society
Name of the Work
Please fill information about the each relevant work completed during the last Three years for works Costing more than Rs._________________
Name of Employer
stage.html
html • 0.04 MB
techsummary_322856.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_322856.xls
BOQ • 0.29 MB
TB01.xls
Additional Documents • 0.03 MB
crgdm3.pdf
PDF • 0.39 MB
crgdm2.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .