Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹10.0 L
EMD Value
₹10,100
Closing Date
4 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Chief Officer, Boriavi Municipality, Boriavi
Bid Documents For Development of Urban Forest / Oxygen Park With 12 Months Operation & Maintenance At Various Area of Boriavi Nagarpalika of Boriavi Nagarpalika ( Second Attempt).
368078
Oxygen Park/2026-27(Second Attempt)
Open
Agriculture or Forestry Works
Works
Anand
3 documents required · 3 mandatory
₹1,062
The Chief Officer, Boriavi Municipality, Boriavi
₹10,100
21 Nov 2026
21 Nov 2026
21 Nov 2026
4 Dec 2026
21 Nov 2026
120 days
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Chief Officer
Boriavi Nagarpalika
BORIAVI NAGARPALIKA, BORIAVI
BID DOCUMENTS FOR DEVELOPMENT OF URBAN FOREST / OXYGEN PARK BESIDE KHRISTI SAMAJ
SMASHAN & AT ROAD DIVIDER IN VARIOUS AREA AT BORIAVI NAGARPALIKA
Sr. No Description RATE Unit Amount
1.0 Clearing jungle including uprooting of rank vegetation, Grass,
brush wood, trees and saplings of girth up to 30 cm measured
at a height of 1 m above ground level and removal of rubbish
up to a distance of 50 m outside the periphery of the area
cleared. 500.00 15.87 Smt
2.00 Supplying and stacking of good earth at site including royalty
and carriage upto 5 km lead complete (earth measured in
stacks will be reduced by 20% for payment). 17.09 682.17 Cmt
3.00 Supplying and stacking of sludge at site including royalty and
carriage upto 5 km lead complete (sludge measured in stacks
will be reduced by 8% for payment) 10.00 366.45 Cmt
4.00 Spreading of sludge, dump manure and/or good earth in
required thickness as per direction of officer-in-charge (cost of
sludge, dump manure and/ or good earth to be paid
separately). 34.18 67.64 Cmt
5.00 Mixing earth and sludge or manure in the required proportion
specified or directed by the Officer-in-charge 34.18 47.28 Cmt
Cow dung manure
Supplying and stacking of well decayed cattle manure at site
6.0 including royalty and carriage upto 5 k.m.lead complete (Cattle
manure measured in stacks will reduced by 8% for
Payment).For Plants 10.75 673.77 cum
7.0 Digging holes in ordinary soil and refilling the same with the
excavated earth mixed with manure or sludge in the ratio of
2:1 by volume (2 parts of stacked volume of earth after
reduction by 20% : 1 part of stacked volume of manure after
reduction by 8%) flooding with water, dressing including
removal of rubbish and surplus earth, if any, with all leads and
lifts (cost of manure, sludge or extra good earth if needed to be
paid for separately) Holes 90 cm dia, and 90 cm deep
8.0 Plantation of Trees, at site i/c watering and removal of
unserveiceable material’s as per direction of officer in charge
(excluding cost of plant & water) 215.00 9.54 No.
Sr. No Description RATE Unit Amount
9.0 Making tree guard 53 cm dia and 2 m height as per design from
empty coal tar drums, supplied free by the department,
including providing and fixing four legs 40 cm long of 30 x
mm M.S. flat riveted to tree guard and providing and fixing
nos M.S. sheet rings 50 x 0.5 mm fixed with rivets complete in
all respects including painting inside and outside of tree guard
2.18.1 A Coat Of Coal Tar. 303.00 936.88 No.
10.0 Operation & Maintenance, Complete maintenance of trees
(Out side garden features), jobs like making of basin at regular
interval i/c watering, weeding, pruning & application of
fertilizer etc, (excluding the cost of material which shall be
supplied by the department and other T & P material/articles
shall be provided by the contractor) and as per direction of
officer in charge. Trees for 250 no/(up to 4 & up to 3 year
Slow & Fast growing group) 2580.00 99.18 No.
Add : 18% GST, Rs.
BORIAVI NAGARPALIKA, BORIAVI
ESTIMATE FOR CONSTRUCTION WORK OF CHAIN LINK FENCING & BRICK BATS CHHARA BESIDE KHRISTI
SAMAJ SMASHAN AT BORIAVI.
Qty. Description Unit Amount
1 150.00 Filling in foundation and plinth with murrum or selected soil in
Smt layers of 20cm. thickness including watering, ramming and
consolidating etc. complete. 294.38 Smt
2 4.50 Filling in foundation and plinth with brick Bats Chhara in layers of
Cmt. 20cm. thickness including watering, remming and consolidating
etc. complete. 621.46 Cmt.
3 50.00 Providing and fixing pre-cast concrete kerb stone of gray cement
Rmt based concrete block 30cm length,30cm height and 15cm thick of
M200 grade concret as per approved design and including
excavation for fixing in proper line and level,filling the joint with
C:M 1:3 (1cement:3 fine sand) etc. complete. Equivalent
4 25.00 Finishing wall with Weather Proof Acrylic Exterior Emulsion Paint
Smt on wall surface (two coats) to give and required shape even shade
and of approved brand and manufacturer after throughly brushing
the surface to remove all dirts, and remians of loose powdered
materials etc. complete. 120.26 Smt.
5 225.00 Providing and fixing M.S. grills of required pattern to wooden
Kgs frames of windows etc. with M.S. flats at required spacings and
frame alround, square or round bars with round headed bolts and
nuts or by screws (A) Plain Grill. 106.23 kgs
6 9.00 Painting two coats (Including Priming Coat) on new steel and other
Smt metal surface with synthetic enamel paint, brushing to give an
even shade including cleaning the surface of all dirt, dust and
other foreign matter. 105.49 Smt
7 125.00 Providing and fixing 1.50 m high GI chain-link fencing of 50×50 mm
Rmt mesh made from GI wire of approved diameter, fixed to precast
reinforced cement concrete fencing posts of M-20 grade placed at
3.00 m centre-to-centre, including excavation for post
foundations, PCC/M-15 concrete foundation, fixing and alignment
of precast posts, GI binding/line wires, hooks, clamps, corner/end
posts and struts, cutting, tying, tensioning, transportation, labour,
tools and tackles and all incidental works, complete in all respects
as directed by Engineer-in-Charge.
Add 18.00 % GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Model RFP-Urban Forest-Oxygen Park with GST.pdf
BOQ-BORIAVI OXYGEN PARK-New.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .