| Sl No | Description | Qty | Unit | kanagaraj L2 | R.GANESAN L1 |
|---|---|---|---|---|---|
| 1.00 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 15 | CUM | 250 ₹3,750 Lowest | 252 ₹3,780 |
| 2.00 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | 10 | CUM | 650 ₹6,500 | 270 ₹2,700 Lowest |
| 3.00 | SUPPLYING AND FILLING WITH M SAND IN FOUNDATION AND BASEMENT INCLUDING WATERING AND CONSOLIDATION | 2 | CUM | 2,700 ₹5,400 | 2,520 ₹5,040 Lowest |
| 4.00 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | 4 | CUM | 4,800 ₹19,200 | 4,753 ₹19,012 Lowest |
| 5.00 | SUPPLY AND LAYING OF RANDOM RUBBLE STONE MASONRY IN CM 1:7 FOR FOUNDATION BELOW GROUND LEVEL INCLUDING COST OF CEMENT, LABOUR, CURING ETC., COMPLETE. | 10 | CUM | 5,700 ₹57,000 | 5,580 ₹55,800 Lowest |
| 6.00 | PROVIDING COURSED RUBBLE STONE MASONRY WITH POINTING WORKS, SECOND SORT IN CEMENT MORTAR 1:7 WITH THROUGH BOND STONES 2 MTRS APART IN EACH COURSE, PLACED IN A STAGGERED PATTERN AND COURSE NOT LESS THAN 150MM HIGH WITH FACE STONES PLACED HEADERS AND STRETCHERS ALTERNATIVELY TO BREAK JOINTS BY ATLEAST 75MM INCLUDING CURING ETC., COMPLETE FOR FOUNDATION BASEMENT UPTO +1.00 MTR LEVEL. | 4 | CUM | 6,000 ₹24,000 Lowest | 6,003 ₹24,012 |
| 7.00 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +0.00 MTR TO +7.00 MTR | 11 | CUM | 6,800 ₹74,800 | 6,580 ₹72,380 Lowest |
| 8.00 | SUPPLY AND LAYING OF FLY ASH BRICKS IN HALF BRICK THICK WALL IN CM 1:4, EXCLUDING PLASTERING, INCLUDING SCAFFOLDING, CURING ETC., COMPLETE AT ALL LEVELS. | 15 | SQM | 1,250 ₹18,750 Lowest | 1,305 ₹19,575 |
| 9.00 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR 1:4, 12MM THICK AT ALL LEVELS INCLUDING NECESSARY SCAFFOLDINGS AND CURING ETC., COMPLETE. | 150 | SQM | 550 ₹82,500 | 540 ₹81,000 Lowest |
| 10.00 | THOROUGHLY PREPARE SURFACES OF THE FLOOR, SUPPLY AND LAYING OF TILES 4' X 2' DOUBLE CHARGED VITRIFIED TILES WITH SPACER JOINT OVER THE FLOOR OF APPROVED SHADE AND COLOUR WITH BED MORTAR IN CM 1:3 WITHOUT ANY WAVINESS FOR FLOORS AND SKIRTING AND GROUTING WITH APPROVED TILE GROUT OF MAKE (BOSTIK / MYK LATICRETE / WEBER) CURING ETC., COMPLETE AT ALL LEVELS. | 15 | SQM | 1,450 ₹21,750 Lowest | 1,800 ₹27,000 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
7 Nov 2025, 3:00 pmClosed
General Manager, Projects
PMD Office, TNPL Unit I, Kagithapuram.
Construction of toilet near Railway gate - Security Barrack and expansion in ITI toilet at TNPL Unit I under CSR
2025_TNPL_619397_1
TNPL/PMD/CIV/CSR/UNIT I/252693000010
Open Tender
Civil Works
Tender cum Auction
60 days
TNPL Unit I, Kagithapuram, Karur district
As per Invitation for Bids of Bid Document
5 documents required · 5 mandatory
₹0
₹15,000
22 Nov 2025
1 Nov 2025
8 Nov 2025
1 Nov 2025
7 Nov 2025
1 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.98 MB
BOQ
BOQ • 0.31 MB
Tender Documents
Tender Documents • 31.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .