Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC accpted |
| 2 | L2₹11.3 L+₹1.5 L (15.7%)Rejected-AOC | ₹11.3 L+₹1.5 L (15.7%) | L2 | Rejected-AOC ok |
| 3 | L3₹11.6 L+₹1.8 L (18.6%)Rejected-AOC | ₹11.6 L+₹1.8 L (18.6%) | L3 | Rejected-AOC ok |
| 4 | L4₹11.9 L+₹2.1 L (21.4%)Rejected-AOC | ₹11.9 L+₹2.1 L (21.4%) | L4 | Rejected-AOC ok |
| 5 | L4₹11.9 L+₹2.1 L (21.4%)Rejected-AOC | ₹11.9 L+₹2.1 L (21.4%) | L4 | Rejected-AOC ok |
Tender Value
₹11.9 L
EMD Value
₹11,870
Closing Date
3 Apr 2026, 5:00 pmClosed
EO
Basudevpur Municipality
Construction of CC road outside C and D waste deposit centre of W. No-05
2026_ORULB_127506_3
BSP_2026-27_07
Open Tender
Civil Works - Others
Percentage
60 days
Basudevpur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,870
Yes
21 May 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
3 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | |||||
| 2Supplying & filling foundation and plinth with Fine sand well watered and rammed including cost, cost of all labour, carriage, royalty, etc complete. | |||||
| 3Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | |||||
| 4Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | |||||
| 5Rigid smooth centering and shuttering for RCC/CC work including false work and dismentling then after casting including cost of all materials etc completed . | |||||
| 6Cost of Transperancy pillar & photograph | |||||
| 7Sub Total | |||||
| 8GST 18% of Sub-Total | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585936.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_585936.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .