Loading…
Loading…
Tender Value
₹37.0 L
EMD Value
₹74,040
Closing Date
6 Jul 2026, 4:00 pm3d left
Ex. Engineer RnB division pahalgam
Office of the Ex. Engineer RnB division pahalgam
Construction Of Dormitoty along with allied works adjacent to Ganesh Temple Hutmurrah Anantnag.
2026_PWDJK_313742_1
ENIT NO 23 OF 2026-27
Open Tender
Civil Works
45 days
Pahalgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Ex. Engineer RnB division pahalgam
₹74,040
26 Jun 2026
26 Jun 2026
7 Jul 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF DORMITORY ADJACENT TO GANESH TEMPLE HUTMURAH: Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 62.74 | Cum | 164.2 | ₹10,301.91 |
| 2 | Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. | 45.96 | Cum | 847.46 | ₹38,949.26 |
| 3 | Providing and laying in position cement concrete in 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering | 4.15 | Cum | 4,561.36 | ₹18,929.64 |
| 4 | Providing and laying iin position specified grade of reinforced cement concrete in 1 : 1.5:3 ( 20mm nominal size) excluding the cost of centering and shuttering . | 14.76 | Cum | 6,828.05 | ₹1,00,782.02 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13.54 | Cum | 8,610.76 | ₹1,16,589.69 |
| 6 | Providing and laying in position cement concrete in 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate, 20mm nominal size) excluding the cost of centering and shuttering. | 10.26 | Cum | 5,778.52 | ₹59,287.62 |
| 7 | Centering & shuttering including strutting, propping etc including removal of form work for for foudations , footing and basis of columns. | 71.13 | SQM | 251.04 | ₹17,855.22 |
| 8 | Centering and shuttering incl. strutting, propping etc and removal of form work )Lintels , beams , plinth beams , girders , centilevers etc. | 31.08 | SQM | 506.34 | ₹15,737.05 |
| 9 | Centering and shuttering incl. strutting, propping etc and removal of form work Suspended floors, roofs , landings, balconies and access platform. | 113.6 | SQM | 629.64 | ₹71,527.1 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts | 40.08 | SQM | 634.03 | ₹25,411.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1015539.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid